451 |
45-14-2022-23 |
Construction of CC Road from Patra Gram More to Noyapara Gram at Banshiahri PS, Noapara-57591145 |
|
Suhita Paul |
08/02/2023 |
₹388,462.00 |
22/03/2023 |
400/ZP |
05/04/2023 |
Scheme Completed: 18/05/2023 |
15th FC UN-TIED (22-23) |
|
452 |
45-13-2022-23 |
Construction of CC Road from House of Suman Biswas towards Mafij Miah in P.S. Tapan.-57729024 |
|
Somnath Kuiry |
08/02/2023 |
₹971,154.00 |
22/03/2023 |
399/ZP |
24/04/2023 |
Scheme Completed: 29/08/2023 |
15th FC UN-TIED (22-23) |
|
453 |
45-10-2022-23 |
Construction of Community Toilet and Drinking Water Facility at Fulbari Market under Uday GP in P.S. Gangarampur. ( 47396021) |
|
PABAN BASAK |
08/02/2023 |
₹970,771.00 |
22/03/2023 |
398/ZP |
Not started |
120
|
15th FC TIED (21-22 |
|
454 |
45-09-2022-23 |
Construction of Community Toilet at Mission More Pundari in P.S. Harirampur-44811658 |
|
Kalyan Bose |
08/02/2023 |
₹968,691.00 |
22/03/2023 |
397/ZP |
Not started |
120
|
"15th FC TIED (20-21" |
|
455 |
45-08-2022-23 |
Construction of Community Toilet & Drinking W0ater Facility At Sekdevpur GP in P.S. Gangarampur.-47396250 |
|
PABAN BASAK |
08/02/2023 |
₹970,771.00 |
22/03/2023 |
396/ZP |
Not started |
120
|
"15th FC TIED (21-22)" |
|
456 |
45-07-2023 |
Drinking Water facility near Anchal Office, Kushmandi by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi-44811422 |
|
Suhita Paul |
08/02/2023 |
₹970,160.00 |
22/03/2023 |
395/ZP |
24/05/2023 |
Scheme Completed: 17/10/2023 |
"15th FC TIED (20-21) " |
|
457 |
45-06-2022-23 |
Solar Based over Head Drinking Water Facility in front Side of mahibal Miah House , Benial under Pundari in P.S. Harirampur-47391628 |
|
Kalyan Bose |
08/02/2023 |
₹962,961.00 |
22/03/2023 |
394/ZP |
Not started |
120
|
15th FC TIED (21-22) |
|
458 |
45-05-2022-23 |
Drinking Water facility in front side of Jambari, Kushmandi by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi-47389971 |
|
Suhita Paul |
08/02/2023 |
₹970,160.00 |
22/03/2023 |
393/ZP |
29/05/2023 |
Scheme Completed: 17/10/2023 |
15 FC 21-22 Tied |
|
459 |
45-04-2022-23 |
Construction of Covered Drain from Mangalpur Adibashi High School in P.S. Kushmandi.- 58368016 |
|
Suhita Paul |
08/02/2023 |
₹728,365.00 |
22/03/2023 |
392/ZP |
29/03/2023 |
Scheme Completed: 14/06/2023 |
15 FC 22-23 Tied |
|
460 |
45-03-2022-23 |
Construction of Cover Drain from Mahipal Bazar to Mahipal Dighi in P.S. Kushmandi.-58362025 |
|
Suhita Paul |
08/02/2023 |
₹728,365.00 |
22/03/2023 |
391/ZP |
24/07/2023 |
Scheme Completed: 10/10/2023 |
15 FC 22-23 Tied |
|
461 |
45-03-2023 |
Construction of Community Sanitary Complex(CSC) at Niren Smriti Vidyapith in Vill-Narayanpur GP-Belbari-II under Gangarampur PS.-58591132 |
|
Kalyan Bose |
08/02/2023 |
₹990,196.00 |
22/03/2023 |
390/ZP |
Not started |
90
|
15 FC 22-23 Tied |
|
462 |
45-01-2022-23 |
Construction of Community Sanitary Complex(CSC) at font side of Chaloon Bazar Bes-an-Noor Model School in Vill- Pransagar GP-Chaloon under Gangarampur PS.-58580207 |
|
PABAN BASAK |
08/02/2023 |
₹990,196.00 |
22/03/2023 |
389/ZP |
Not started |
90
|
15 FC 22-23 Tied |
|
463 |
44-15-2022-23 |
Construction of Community Sanitary Complex(CSC) at front side of Bolla Mandir in GP-Bolla under Balurghat PS-58577173 |
|
PABAN BASAK |
20/01/2023 |
₹990,196.00 |
30/03/2023 |
500/ZP |
Not started |
90
|
15 FC 22-23 Tied |
|
464 |
44-14-2022-23 |
Construction of Community Sanitary Complex at front side of Kumarganj Bus Stand GP-Ramkrishnapur in P.S. Kumarganj-58575520 |
|
Somnath Kuiry |
08/02/2023 |
₹970,874.00 |
20/03/2023 |
374/ZP |
Not started |
90
|
15 FC 22-23 Tied |
|
465 |
44-13-2022-23 |
Construction of Community Sanitary Complex(CSC) at front side of Hili Hospital in Panjul GP under Hili P.S.-58573934 |
|
PABAN BASAK |
08/02/2023 |
₹990,195.00 |
20/03/2023 |
373/ZP |
Not started |
90
|
15 FC 22-23 Tied |
|
466 |
44-08-2022-23 |
Construction of Covered Drain from Biswanath Murmu House to Samad Ali Mondal House in vill-Kharail under Jalghar GP in P.S. Balurghat.-58359744 |
|
PABAN BASAK |
08/02/2023 |
₹495,098.00 |
20/03/2023 |
371/ZP |
04/04/2023 |
60
Days Left:-692
|
15 FC 21-22 Tied |
|
467 |
44-06-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Badalpur SS High School, Vill-Badalpur, Bolla in P.S. Balurghat.-47380808 |
|
PABAN BASAK |
08/02/2023 |
₹544,608.00 |
30/03/2023 |
498/ZP |
Not started |
90
|
15 FC 21-22 Tied |
|
468 |
44-10-2022-23 |
Construction of Covered Drain from Mofajal Miah Shop via School to Bidhan’s Shop under Ashokegram GP in P.S. Gangarampur.-58342297 |
|
PABAN BASAK |
08/02/2023 |
₹485,437.00 |
30/03/2023 |
499/ZP |
01/06/2023 |
90
Days Left:-604
|
15 FC 22-23 Tied |
|
469 |
44-08-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front side of Manail Jr. High School, Vill- Manail, Patiram under Balurghat PS.-47383907 |
|
PABAN BASAK |
08/02/2023 |
₹544,608.00 |
20/03/2023 |
371/ZP |
11/04/2023 |
90
Days Left:-655
|
15 FC 21-22 Tied |
|
470 |
44-6-2022-23 |
Repair and Maintenance Work of Building(Ground Floor repair) at Kushmandi Old Market Complex at Kushmandi -47462280 |
|
Suhita Paul |
08/02/2023 |
₹485,195.00 |
20/03/2023 |
370/ZP |
27/03/2023 |
90
Days Left:-670
|
15 FC 21-22 Un-tied |
|
471 |
44-5-2022-23 |
Construction of Community Toilet at Barahar More in GP-Ramkrishnapur under Kumarganj PS-47394715 |
|
Somnath Kuiry |
02/08/2023 |
₹990,196.00 |
20/03/2023 |
369/ZP |
Not started |
180
|
15 FC 21-22 Tied |
|
472 |
44-4-2022-23 |
Construction of Community Toilet at Kamalpur Hat in Gopalbati GP under Balurghat PS-44811559 |
|
PABAN BASAK |
01/02/2023 |
₹990,196.00 |
03/02/2023 |
368/ZP |
Not started |
180
|
15 FC 21-22 Tied |
|
473 |
44-3-2022-23 |
Construction of Community Toilet at Baul Bazar in GP- Bolla under Balurghat 47396132 |
|
PABAN BASAK |
01/02/2023 |
₹990,196.00 |
03/02/2023 |
368/ZP |
Not started |
180
|
15 FC 21-22 Tied |
|
474 |
44-2-2022-23 |
Construction of Covered Drain from Mahijuddin Mia House to Khari in vill Khaspara under Bhor GP in P.S. Kumarganj.- 47404275 |
|
Somnath Kuiry |
01/02/2023 |
₹792,157.00 |
03/02/2023 |
367/ZP |
Not started |
90
|
15 FC 21-22 Tied |
|
475 |
44-01-2022-23 |
Construction of Covered Drain from Safanagar GP Office to Samar Basak Shop under Safanagar GP in P.S. Kumarganj.- 47404538 |
|
Somnath Kuiry |
02/08/2023 |
₹495,098.00 |
03/02/2023 |
369/ZP |
Not started |
|
15 FC 21-22 Tied |
|
476 |
26-10-2022-23 |
CC Road from Kalimandir more(Haran Saha House) towards Ashit Das Pukur under Belbari-I in P.S. Gangarampur. |
|
Kalyan Bose |
08/12/2023 |
₹758,636.00 |
10/02/2023 |
177/ZP |
15/02/2023 |
90
Days Left:-710
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
477 |
26-09-2022-23 |
Repairing of Cc Road from Bharani Roy House to Biplab Roy House under Belbari-I GP in P.S. Gangarampur |
|
PABAN BASAK |
08/12/2022 |
₹435,709.00 |
10/02/2023 |
76/ZP |
12/02/2023 |
60
Days Left:-743
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
478 |
26-08-2022-23 |
Repair and Maintenance of Wooden Foot Bridge with approach road at Uttar Belbari near Jr. Basic School(over Brahmani) under Belbari-I GP in P.S. Gangarampur. |
|
Kalyan Bose |
08/12/2022 |
₹600,400.00 |
10/02/2023 |
175/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
479 |
26-06-2022-23 |
Repairing and maintenance of road from Samsuddin House to Lohar Bridge(East Harsura) in P.S. Tapan. |
|
|
08/12/2022 |
₹1,942,308.00 |
10/02/2023 |
174/ZP |
Not started |
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
480 |
26-05-2022-23 |
Repairng of CC Road from Dahapara to Dahapara Masjid(Dumuta) under Ashokgram GP in P.S. Gangarampur. |
|
PABAN BASAK |
08/12/2022 |
₹971,292.00 |
10/02/2023 |
173/ZP |
06/03/2023 |
90
Days Left:-691
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
481 |
26-04-2022-23 |
Reparing of Road from Adigram end towards Nehemba in P.S. Gangarampur |
|
Kalyan Bose |
08/12/2022 |
₹4,252,501.00 |
10/02/2023 |
172/ZP |
06/06/2023 |
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
482 |
26-03-2022-23 |
Repairing of Road from Kushmandi to Ushaharan in P.S. Kushmandi. |
|
Suhita Paul |
12/08/2022 |
₹2,618,165.00 |
10/03/2023 |
302/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
483 |
26-02-2022-23 |
Repairing of CC Road from Sudhir Roy House to Bhabesh Dutta Shop under Belbari-II GP in P.S. Gangarampur |
|
Kalyan Bose |
08/12/2022 |
₹3,810,661.00 |
23/02/2023 |
247/ZP |
02/03/2023 |
90
Days Left:-695
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
484 |
21-08/2022-23 |
Construction of Boundary Wall at Nil Gambhir FP School under Bairhatta GP in P.S. Harirampur. |
|
Kalyan Bose |
08/03/2022 |
₹776,424.00 |
12/12/2022 |
1221/ZP |
24/02/2023 |
90
Days Left:-701
|
15th FC Savings (20-21) |
|
485 |
43-02-2022-23 |
Setting up of IP Based Video Conferencing System by DDZP. |
|
Nihar Ghosh |
10/02/2023 |
₹733,635.00 |
03/03/2023 |
286/ZP |
29/03/2023 |
Scheme Completed: 04/04/2023 |
RGSA Plan 22-23 |
|
486 |
42-01-2022-23 |
Upgradation of Road from Hili Bus Stand to Hili Check post under Hili P.S. |
|
PABAN BASAK |
01/02/2023 |
₹7,038,468.00 |
09/03/2023 |
296/ZP |
07/04/2023 |
180
Days Left:-569
|
DM Office(available fund) |
|
487 |
42-02-2022-23 |
Construction of CC road over damaged B.T. road from Belbari high school towards Dilu Dutta tea shop and widening of adjacent Ghosh para approach road in PS.- Gangarampur. |
|
Kalyan Bose |
01/02/2023 |
₹3,095,849.00 |
09/03/2023 |
295/ZP |
14/03/2023 |
45
Days Left:-728
|
Repair maintenance of rural road |
|
488 |
03-02-2022-23 |
Construction of CC Road from Pulin Barman house via Kera Barman house to Chukatu Barman house under Damdama GP in PS Gangarampur |
|
Kalyan Bose |
20/04/2022 |
₹2,330,590.00 |
11/04/2022 |
1068/ZP |
10/12/2022 |
75
Days Left:-792
|
15th FC 2021-2022 Un-tied |
|
489 |
41-07-2022-23 |
Supply and Installation of LED Solar Street Light at Araji Elamtair, Harikuri, Haridaspur, Paikpara, Block- Gangarampur, GP-Jahangirpur, Dist- Dakshin Dinajpur.-58047478 |
|
Nihar Ghosh |
20/01/2023 |
₹460,420.00 |
02/03/2023 |
2801/ZP |
11/03/2023 |
Scheme Completed: 20/04/2023 |
15th FC UN-TIED (22-23) |
|
490 |
41-06-2022-23 |
Supply and Installation of LED Solar Street Light at Khaspur Atriyee River Bridge, Patiram Atrayee River Bridge, Mallickpur Village(Daktar Khana More) to Goutam Sarkar House and Arabinda Mandal House to Basanti Tala, Block-Balurghat, Bolla, Patiram, Najirpur GP, Dist- Dakshin Dinajpur-58043944 |
|
Nihar Ghosh |
20/01/2023 |
₹460,420.00 |
02/03/2023 |
279/ZP |
15/04/2023 |
Scheme Completed: 27/04/2023 |
15th FC UN-TIED (22-23) |
|
491 |
41-05-2022-23 |
Installation of Solar Street Light inside of Malancha Madrasha Field and Fasiur Sarkar House to Malancha Madrasha Road side, Block-Tapan, Hazaratpur GP, Dist- Dakshin Dinajpur.-58028617 |
|
Nihar Ghosh |
20/01/2023 |
₹644,587.00 |
02/03/2023 |
278/ZP |
12/03/2023 |
Scheme Completed: 20/03/2023 |
15th FC UN-TIED (22-23) |
|
492 |
41-04-2022-23 |
Supply and Installation of LED Solar Street Light at Kesor Kuri and Ejinagar Block-Tapan, Gofanagar GP Dist- Dakshin Dinajpur-58025103 |
|
Nihar Ghosh |
20/01/2023 |
₹460,420.00 |
02/03/2023 |
277/ZP |
16/03/2023 |
Scheme Completed: 08/04/2023 |
15th FC UN-TIED (22-23) |
|
493 |
41-03-2023 |
Supply and Installation of LED Solar Street Light at Gopal ganj Bus Stand to Kumarganj Bus Stand, Block-Kumarganj, Safanagar/Ramkrishnapur GP Dist- Dakshin Dinajpur-58024409 |
|
Nihar Ghosh |
20/01/2023 |
₹644,587.00 |
02/03/2023 |
276/ZP |
15/03/2023 |
Scheme Completed: 13/04/2023 |
15th FC UN-TIED (22-23) |
|
494 |
41-02-2022-23 |
Supply and Installation of LED Solar Street Light at Dhop Para to Karmakar Para via Chatma to Biprobhag, Block-KUmarganj, Deor-GP, Dist- Dakshin Dinajpur-58023704 |
|
Nihar Ghosh |
20/01/2023 |
₹644,587.00 |
02/03/2023 |
275/ZP |
15/03/2023 |
Scheme Completed: 28/03/2023 |
60 |
|
495 |
41-01-2022-23 |
Supply and Installation of LED Solar Street Light at Belbari different place, Singforka, Belbari, Joypur Manash Mondal House, Sunil Sarkar House, Shealkuri Sashan, Kacharipara, Narayan Debnath, Shymal Mondal, Hariya Saka Sashan Ghat, Hariranjan Roy House, Horesh Roy, Biplab Roy, Sing Para Block- Gangarampur, Belbari-I GP, Dist- Dakshin Dinajpur-57855667 |
|
Nihar Ghosh |
20/01/2023 |
₹644,587.00 |
02/03/2023 |
274/ZP |
07/03/2023 |
Scheme Completed: 18/03/2023 |
60 |
|
496 |
19-12-2022-23 |
Construction of Cc Road from Vaktipur Masjit to Kahotala(Kalitala more) under Chaloon GP in P.S. Gangarampur-47406614. |
|
PABAN BASAK |
24/08/2022 |
₹485,434.00 |
02/03/2023 |
281/ZP |
23/04/2023 |
90
Days Left:-643
|
15th FC 2021-22 UN-TIED Fund |
|
497 |
38-09-2022-23 |
Supply of Drinking Water by Providing Submersible Pump at Mohini Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392775 |
|
PABAN BASAK |
21/12/2022 |
₹182,936.00 |
15/02/2023 |
197/ZP |
Not started |
60
|
15th FC TIED 20-21 |
|
498 |
32-08-2022-23 |
Supply of Drinking Water by Providing Submersible Pump at Pandey Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392200 |
|
PABAN BASAK |
21/12/2022 |
₹182,936.00 |
15/02/2022 |
196/ZP |
Not started |
60
|
15th FC TIED 20-21 |
|
499 |
32-04-2023 |
Construction of Community Toilet at Baul Bazar in GP- Bolla under Balurghat 47396132 |
|
PABAN BASAK |
21/12/2022 |
₹1,366,470.00 |
15/02/2022 |
195/ZP |
Not started |
90
|
15th FC UN TIED 21-22 |
|
500 |
29-01-2022-23 |
Construction of Public Health Units(BPHUs) at Harirampur RH(C) Internal Electrification work. |
|
Nihar Ghosh |
16/12/2022 |
₹353,698.00 |
15/02/2023 |
193/ZP |
23/02/2023 |
Scheme Completed: 03/07/2023 |
XV FC-Health Grants for FY-2021-22 |
|
501 |
33-03-2022-23 |
Installation of LED Street Light(High Mast) at Barahar BPHC at Safanagar GP in P.S. Kumarganj Dist- Dakshin Dinajpur. |
|
Nihar Ghosh |
22/12/2023 |
₹602,115.00 |
15/02/2023 |
206/ZP |
15/03/2023 |
Scheme Completed: 20/05/2023 |
15th FC Un-TIED-2020-21(supplementary) |
|
502 |
33-01-2022-23 |
Repairing of High and Mini Mast (Electrical) Light in different block, GP and Villages, (Fulbari, Bagichapur, Kushmandi, Bairahatta, Gacchiar, Deor etc)-14 nos. Dist- Dakshin Dinajpur |
|
Nihar Ghosh |
22/12/2023 |
₹1,415,942.00 |
15/02/2023 |
205/ZP |
07/03/2023 |
Scheme Completed: 10/05/2023 |
15th FC Un-TIED-2020-21(supplementary) |
|
503 |
38-09-2022-23 |
Construction of Community Sanitary Complex at front side of Raikhand Khariji Madrasha GP Jakirpur in P.S. Kumarganj.-58587207 |
|
Somnath Kuiry |
19/01/2023 |
₹970,874.00 |
15/02/2023 |
204/ZP |
Not started |
45
|
15th FC TIED (22-23) |
|
504 |
40-01-2023 |
Construction of Covered Drain from Gombhira Tola towards Sarsa Pond in P.S. Tapan.-58338963 |
|
Somnath Kuiry |
19/01/2023 |
₹728,365.00 |
15/02/2023 |
203/ZP |
18/04/2023 |
Scheme Completed: 30/06/2023 |
15th FC TIED (22-23) |
|
505 |
38-09-2022-23 |
Construction of CC Road from Jafarail Molla House to Jharpukur via Sayastabad Altab Miah House, Banshihari, Ganguria Goyalkuri/Sayastabad-57729446 |
|
Suhita Paul |
19/01/2023 |
₹971,154.00 |
23/02/2023 |
249/ZP |
23/04/2023 |
Scheme Completed: 26/06/2023 |
15th FC UN-TIED (22-23) |
|
506 |
38-07-2022-23 |
Construction of CC Road from Amal Ch. Mandal House towards Hamidur Sarkar House via Mafijuddin Miah in P.S. Tapan.-57719285 |
|
Somnath Kuiry |
19/01/2023 |
₹971,154.00 |
15/02/2023 |
201/ZP |
21/03/2023 |
Scheme Completed: 19/05/2023 |
15th FC UN-TIED (22-23) |
|
507 |
38-04-2022-23 |
Construction of CC Road from Palbhabanipur Footbal Math to Madan Barman House under Sayedpur GP in P.S. Harirampur.-57721927 |
|
Kalyan Bose |
19/01/2023 |
₹679,808.00 |
23/02/2023 |
248/ZP |
27/02/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED (22-23) |
|
508 |
38-03-2022-23 |
Construction of CC Road from HARIBASAR VIA Karno Barman House to Budhu Barman House under Gokarno GP in P.S. Harirampur.-57721561 |
|
Kalyan Bose |
19/01/2023 |
₹970,717.00 |
15/02/2023 |
199/ZP |
20/02/2023 |
45
Days Left:-750
|
15th FC UN-TIED (22-23) |
|
509 |
38-02-2022-23 |
Construction of CC Road from Sing Para towards Khichuripara under Belbari-I in P.S. Gangarampur. |
|
Kalyan Bose |
19/01/2023 |
₹971,154.00 |
15/02/2023 |
198/ZP |
16/02/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED (22-23) |
|
510 |
29-02-2022-23 |
Construction of Public Health Units(BPHUs) at Tapan RH(C) Internal Electrification work. |
|
Nihar Ghosh |
16/12/2022 |
₹353,698.00 |
15/02/2023 |
194/ZP |
23/02/2023 |
Scheme Completed: 09/08/2023 |
XV FC-Health Grants for FY-2021-22 |
|
511 |
19-01-2022-23 |
Construction of Public Health Units(BPHUs) at Harirampur RH(C) Internal Electrification work. |
|
Nihar Ghosh |
16/12/2022 |
₹353,698.00 |
15/02/2023 |
193/ZP |
24/02/2023 |
90
Days Left:-701
|
XV FC-Health Grants for FY-2021-22 |
|
512 |
13-05-20220-21 |
Drinking water providing wate ATM at Chourapara near Nripen Sarkar house, Vill - Chourapara, GP- Danga, under Balurghat PS |
|
SMRITI CHANDRA KARMAKAR |
30/12/2020 |
₹543,846.00 |
06/02/2021 |
317/Engg/ZP |
02/08/2021 |
45
Days Left:-1317
|
15th FC Tied |
|
513 |
02-04-2022-23 |
Construction of CC Road from Haridas Barman House towards Kamal Besra House in P.S. Tapan. |
|
Somnath Kuiry |
20/04/2022 |
₹1,942,308.00 |
29/09/2022 |
1000/ZP |
06/01/2023 |
Scheme Completed: 03/03/2023 |
15th FC 2021-2022 Un-tied |
|
514 |
09-10-2021-22 |
Construction of CC Road from Telikuri PMGSY Road via Milghar(1st Phase) under Ellahabad GP in P.S. Banshihari |
|
Suhita Paul |
08/02/2022 |
₹485,577.00 |
06/05/2022 |
408/ZP |
30/06/2022 |
Scheme Completed: 28/03/2023 |
Repair/Maintenance of Rural Roads |
|
515 |
03-07-2021-22 |
Construction of Covered Drain from Daulatpur Vim Roy House to Madan Laha’s House in P.S. Banshihari. |
|
Suhita Paul |
01/01/1970 |
₹606,971.00 |
12/03/2021 |
512/ZP |
25/12/2021 |
Scheme Completed: 25/02/2023 |
15th FC Tied 20-21 |
|
516 |
22-01-2022-23 |
Internal Electrification Work at the RTE Production & Supply unit in Kamarpara Operated by Nabachetana Sangha Bahumukhi Samabay Samiti Ltd., Balurghat , Dakshin DInajpur. |
|
Nihar Ghosh |
09/09/2022 |
₹155,828.00 |
06/12/2022 |
1172/ZP |
15/12/2022 |
Scheme Completed: 09/02/2023 |
RTE |
|
517 |
23-15-2022-23 |
Construction of Public Samshan Ghat(Crematorium) beside Baul Khari in GP Bolla under Balurghat PS-47460841 |
|
PABAN BASAK |
20/10/2022 |
₹990,196.00 |
16/01/2023 |
60/ZP |
Not started |
60
|
15th FC 2021-22 Un-Tied |
|
518 |
23-14-2022-23 |
Internal Electrification Work of EVM Ware House(Three Storied) beside Minority Building at Balurghat District Collectorate Campus, Dakshin Dinajpur. |
|
Nihar Ghosh |
20/10/2022 |
₹990,439.00 |
16/01/2023 |
59/ZP |
Not started |
365
|
EVM/VVPAT Warehouses Fund |
|
519 |
23-12-2022-23 |
Supply of Safe Drinking Water by Installation of Solar Based Overhead Water Tank near Biharipara Mandir, Vill-Fatepur, GP-Jalghar under Balurghat P.S.-44811317 |
|
PABAN BASAK |
20/10/2022 |
₹971,153.00 |
16/01/2023 |
58/ZP |
Not started |
180
|
15th FC 2020-21 Tied |
|
520 |
23-09-2022-23 |
INTERNAL ELECTRICAL WORKS FOR Block Public Health Unit (BPHU) at Kumarganj RH |
|
Nihar Ghosh |
20/10/2023 |
₹623,951.00 |
16/01/2023 |
57/ZP |
Not started |
|
365 |
|
521 |
23-08-2022-23 |
INTERNAL ELECTRICAL WORKS FOR Block Public Health Unit (BPHU) at Kushmandi RH |
|
Nihar Ghosh |
20/10/2022 |
₹623,951.00 |
16/01/2023 |
56/ZP |
Not started |
365
|
XV-FC HG During the Year 2022-2023 |
|
522 |
23-04-2022-23 |
Construction of covered drain from Douyakuri Village to Moktar House in P.S. Banshihari |
|
Suhita Paul |
20/10/2022 |
₹684,716.00 |
16/01/2023 |
55/ZP |
20/02/2023 |
Scheme Completed: 11/05/2023 |
15th FC 2021-2022 -tied |
|
523 |
23-03-2022-23 |
Construction of Covered Drain from Anup Sen House to Tower More under Boalder GP in P.S. Balurghat. |
|
PABAN BASAK |
20/10/2022 |
₹396,078.00 |
16/01/2023 |
54/ZP |
23/01/2023 |
Scheme Completed: 15/03/2023 |
15th FC 2021-2022 -tied |
|
524 |
23-02-2022-23 |
Installation of LED Street Light(High Mast Tower) at in front of Adarsha Academy Pransagar, Chaloon GP in P.S. Gangarampur, Dist- Dakshin Dinajpur. |
|
Nihar Ghosh |
20/10/2022 |
₹580,485.00 |
16/01/2023 |
53/ZP |
02/02/2023 |
Scheme Completed: 27/03/2023 |
15th FC 2021-2022 Un-tied |
|
525 |
23-01-2022-23 |
Installation of LED Solar Street Light(i) infront of Saprondighi Bazar, Basuria GP(ii) Panjul Hatkhola, Panjul GP (iii) in front of Maharajpur Bazar, Belbari-II GP(iv) Profulla Roy House Nadipar, Belbari –I GP |
|
Nihar Ghosh |
20/10/2022 |
₹349,607.00 |
16/01/2023 |
52/ZP |
28/01/2023 |
Scheme Completed: 08/02/2023 |
15th FC 2021-2022 Un-tied |
|
526 |
20-03-2022-23 |
CC road from Dipak Halder House towards Rahaman(Raman) Dighi Jalalpur under Belbari-II Gp in P.S. Gangarampur.-47439056 |
|
Kalyan Bose |
30/08/2022 |
₹485,576.00 |
16/01/2023 |
61/ZP |
27/03/2023 |
Scheme Completed: 12/06/2023 |
15th FC untied 21-22 |
|
527 |
23-05-2022-23 |
Internal Electrification work Northern Side of 2nd floor of DRDC building (District Traffic Office) under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur(Electrical Work) |
|
Nihar Ghosh |
20/10/2022 |
₹187,624.00 |
11/01/2023 |
44/ZP |
14/01/2023 |
Scheme Completed: 12/05/2023 |
Own |
|
528 |
21-09-2022-23 |
Construction of Waiting Shed at Pandeyparea under Belbari-IGP in P.S. Gangarampur.-47460419 |
|
Kalyan Bose |
30/08/2022 |
₹291,693.00 |
12/12/2022 |
1222/ZP |
10/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC Un-TIED 2021-22 |
|
529 |
21-06-2022-23 |
Construction of Covered Drain from Kader Miah House towards Osman Miah House, Sidlim under Chaloon GP in P.S. Gangarampur.-47400171 |
|
Kalyan Bose |
30/08/2022 |
₹291,202.00 |
12/12/2022 |
1220/ZP |
02/03/2023 |
Scheme Completed: 12/06/2023 |
15th FC TIED 2021-22 |
|
530 |
21-05-2022-23 |
Construction of Covered Drain from Najrul Islam Land towards Eidgha Mat, Jachi under Chaloon GP in P.S. Gangarampur.-47400077 |
|
Kalyan Bose |
30/08/2022 |
₹291,202.00 |
12/12/2022 |
1219/ZP |
25/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC TIED 2021-22 |
|
531 |
20-07-2022-23 |
Construction of Covered Drain from Rama Majumder House to Bikash Chakraborty House at Dharanda Village of Hili GP in Hili Panchayat Samity-52228418 |
|
PABAN BASAK |
30/08/2022 |
₹2,913,462.00 |
12/12/2022 |
1218/ZP |
02/03/2023 |
120
Days Left:-665
|
15th FC TIED 2021-22 |
|
532 |
20-06-2022-23 |
Construction of Covered Drain from Juran Sarkar House to Uppal Ghode House under Mahabari GP in P.S. Banshihari.-47403074 |
|
Suhita Paul |
30/08/2022 |
₹582,524.00 |
12/12/2022 |
1217/ZP |
03/03/2023 |
Scheme Completed: 11/08/2023 |
15th FC TIED 2021-22 |
|
533 |
20-05-2022-23 |
Construction of Covered Drain from Samsia FP School School to Anisur Rahaman’s via Lutfar Rahaman’s House in P.S. Kushmandi-47401861 |
|
Suhita Paul |
30/08/2022 |
₹2,913,462.00 |
12/12/2022 |
1216/ZP |
Not started |
120
|
15th FC TIED 2021-22 |
|
534 |
20-04-2022-23 |
Construction of Covered Drain from Muradpur village to Pucca Road under Mahabari GP in P.S. Banshihari.-47402168 |
|
Suhita Paul |
30/08/2022 |
₹582,524.00 |
12/12/2022 |
1215/ZP |
Not started |
90
|
15th FC TIED 2021-22 |
|
535 |
20-02-2022-23 |
Construction of CC Road from Apan Roy towards Banu Miah Land under Jahangirpur GP in P.S. Gangarampur-47437966 |
|
Kalyan Bose |
30/08/2022 |
₹485,569.00 |
12/12/2022 |
1214/ZP |
22/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED 2021-22 |
|
536 |
20-01-2022 |
Construction of CC Road from Anarul Miya House towards Abeskuri PMGSY road via Debnath Para, Belestholi under Basuria GP in P.S. Gangarampur-47406388 |
|
Kalyan Bose |
30/08/2022 |
₹971,139.00 |
12/12/2022 |
1213/ZP |
27/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED 2021-22 |
|
537 |
19-13-2022-23 |
Construction of CC Road from Guljar Miya House to Ainal Miya House, Chalunda under Uday GP in P.S. Gangarampur-47406185 |
|
Kalyan Bose |
24/08/2022 |
₹485,605.00 |
06/12/2022 |
1184/ZP |
12/12/2022 |
90
Days Left:-775
|
15th FC UN-TIED 2021-22 |
|
538 |
19-11-2022-23 |
CC Road from Adibashipara Nirmal House towards Chotokum, Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406752 |
|
Kalyan Bose |
24/08/2022 |
₹485,549.00 |
06/12/2022 |
1183/ZP |
12/12/2022 |
90
Days Left:-775
|
15th FC UN-TIED 2021-22 |
|
539 |
19-10-2022-23 |
CC Road from Rahaman Ali House towards Hasan Ali House(land), Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406834 |
|
Kalyan Bose |
24/08/2022 |
₹485,549.00 |
06/12/2022 |
1182/ZP |
12/12/2022 |
90
Days Left:-775
|
15th FC UN-TIED 2021-22 |
|
540 |
19-09-2022-23 |
Construction of CC Road from PMGSY road to Srirampur(Fajilpur) Baro Masjit Club in P.S. Banshihari.-47447919 |
|
Suhita Paul |
24/08/2022 |
₹1,165,369.00 |
06/12/2022 |
1181/ZP |
04/01/2023 |
Scheme Completed: 25/03/2023 |
15th FC UN-TIED 2021-22 |
|
541 |
19-08-2022-23 |
CC Road repairing from Ashokgram Bazar towards Garoya House under Ashokgram GP in P.S. Gangarampur-47405988 |
|
Kalyan Bose |
01/01/1970 |
₹485,575.00 |
06/12/2022 |
1180/ZP |
12/12/2022 |
90
Days Left:-775
|
15th FC UN-TIED 2021-22 |
|
542 |
19-07-2022-23 |
Construction of CC Road from Binod Roy House towards Paikepara FP School in vill-Dasul under Nazirpur ZP in P.S. Balurghat.-47448678 |
|
PABAN BASAK |
24/08/2022 |
₹1,188,235.00 |
06/12/2022 |
1179/ZP |
10/03/2023 |
Scheme Completed: 10/05/2023 |
15th FC UN-TIED 2021-22 |
|
543 |
19-06-2022-23 |
Construction of CC Road from Purba Para Aptar Haripukur Sahin Mission to Rabiul House via Ataur Mondal House in P.S. Hili.-47443474 |
|
Somnath Kuiry |
24/08/2022 |
₹776,923.00 |
06/12/2022 |
1178/ZP |
Not started |
90
|
15th FC UN-TIED 2021-22 |
|
544 |
19-05-2022-23 |
Construction of CC Road from Barampur Pur5ba Para to Moksed Ali via Dighi Para in P.S. Tapan.-47441544 |
|
Somnath Kuiry |
24/08/2022 |
₹388,462.00 |
06/12/2022 |
1177/ZP |
05/02/2023 |
Scheme Completed: 22/03/2023 |
15th FC UN-TIED 2021-22 |
|
545 |
19-04-2022-23 |
Construction of CC Road from Barampur FP School towards South Haritala in P.S. Tapan.-47441355 |
|
Somnath Kuiry |
24/08/2022 |
₹388,462.00 |
06/12/2022 |
1176/ZP |
05/02/2023 |
Scheme Completed: 23/03/2023 |
15th FC UN-TIED 2021-22 |
|
546 |
19-03-2022-23 |
Construction of CC Road from Patbanial towards Pacca Road in P.S. Tapan.-47442102 |
|
Somnath Kuiry |
24/08/2022 |
₹1,165,385.00 |
06/12/2022 |
1175/ZP |
07/02/2023 |
Scheme Completed: 10/05/2023 |
15th FC UN-TIED 2021-22 |
|
547 |
19-02-2022-23 |
Construction of CC Road from Abul Hossain House towards PMGSY road in P.S. Tapan.-47446085 |
|
Somnath Kuiry |
24/08/2022 |
₹2,427,885.00 |
06/12/2022 |
1174/ZP |
01/02/2023 |
Scheme Completed: 21/03/2023 |
15th FC UN-TIED 2021-22 |
|
548 |
19-01-2022-23 |
Construction of Cc Road from Sihol PWD Road to Mangal House via High School in P.S. Banshihari.-47447617 |
|
Suhita Paul |
24/08/2022 |
₹1,165,265.00 |
06/12/2022 |
1173/ZP |
27/01/2023 |
Scheme Completed: 17/03/2023 |
15th FC UN-TIED 2021-22 |
|
549 |
18-03-2022-23 |
Construction of EVM Ware house(Three Storied) behind SDO Gangarampur Office Building at Buniadpur, Dakshin Dinajpur, JL No-255, Plot No- 584, Mouza-Barail. |
|
Kalyan Bose |
18/08/2022 |
₹11,744,679.00 |
04/11/2022 |
1085/ZP |
10/12/2022 |
360
Days Left:-507
|
EVM/ Election |
|
550 |
17-08-2022-23 |
Repairing of Building (Ground Floor Repair and construction of rest part of roofat 1st floor) of Mahipal ZP Market Complex at Kushmandi.-44813810 |
|
Suhita Paul |
17/08/2022 |
₹679,808.00 |
04/11/2022 |
1084/ZP |
27/03/2023 |
Scheme Completed: 22/08/2023 |
15th FC Un-Tied 20-21 |
|
551 |
17-07-2022-23 |
Construction of Waiting Shed at Mahinipara Sashan under Belbari-I GP in P.S. Gangarampur.-44813849 |
|
Kalyan Bose |
17/08/2022 |
₹291,693.00 |
04/11/2022 |
1083/ZP |
10/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC Un-Tied 20-21 |
|
552 |
17-06-2022 |
Construction of Waiting Shed at Nayabazar in P.S. Gangarampur- 44813859 |
|
PABAN BASAK |
17/08/2022 |
₹291,693.00 |
04/11/2022 |
1082/ZP |
11/02/2023 |
Scheme Completed: 02/09/2024 |
15th FC Un-Tied 20-21 |
|
553 |
17-04-2022-23 |
Construction of Community Toilet at beside MSK School, Vill-Jamalpur in P.S. Hili- 44811593 |
|
Somnath Kuiry |
17/08/2022 |
₹971,154.00 |
04/11/2022 |
1081/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
554 |
17-03-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Kharail Bazar, Vill-Kharail GP-Deor under Kumarganj PS.-44807447 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1080/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
555 |
17-02-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Chandganj Library, Vill-Chandganj GP-Safanagar under Kumarganj PS.-44811165 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1079/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
556 |
17-01-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Kumarganj College, Vill-Puntair GP-Bhor under Kumarganj PS.-44811125 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1078/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
557 |
16-10-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of the H/O Rouf Mondal, Vill-Kasurail, GP-Ramkrishnapur under Kumarganj PS.-44807556 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1077/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
558 |
16-09-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Rajua Kali Mandir, Vill-Rajua, GP-Boaldar under Balurghat PS.-44807036 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1076/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
559 |
16-08-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Kashilabati Masjid, Vill-Kashilabati, GP-Jalghar under Balurghat PS.-44807030 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1075/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
560 |
16-07-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Baharipara Temple, Vill-Fatepur, GP-Jalghar under Balurghat PS.-44806938 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1074/zp |
Not started |
180
|
15th FC Tied 20-21 |
|
561 |
16-06-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Ramkisku House, Vill-Belain, GP-Jalghar under Balurghat PS.-44804726 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1073/ZP |
13/12/2022 |
Scheme Completed: 02/09/2024 |
15th FC Tied 20-21 |
|
562 |
16-05-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Puratan Gangarampur High School, Vill-Gangarampur, GP-Gangarampur under Gangarampur PS.-47383702 |
|
PABAN BASAK |
17/08/2022 |
₹534,135.00 |
04/11/2022 |
1072/zp |
01/01/2023 |
Scheme Completed: 02/09/2024 |
15th FC Tied 20-21 |
|
563 |
16-04-2022-23 |
Installation of Water Purification System at rasidpur Hospital in P.S. banshihari- 56430905 |
|
Suhita Paul |
17/08/2022 |
₹544,217.00 |
04/11/2022 |
1071/ZP |
04/01/2023 |
Scheme Completed: 27/07/2023 |
15th FC 20-21 Savings |
|
564 |
16-02-2022-23 |
Installation of Water PurifireMachine(Water ATM) at Baidya Tigga’s House(Tinmatha more), Vill- Raguhanbati, GP-Damdama under Gangarampur P.S.-55734841 |
|
PABAN BASAK |
17/08/2022 |
₹534,135.00 |
04/11/2022 |
1070/ ZP |
01/01/2023 |
Scheme Completed: 28/01/2024 |
15th FC 20-21 Savings |
|
565 |
15-02-2022 |
Construction of Block Public Health Unit (BPHU) at Kumarganj RH |
|
Somnath Kuiry |
12/08/2022 |
₹4,808,947.00 |
21/10/2022 |
1056/ZP |
Not started |
365
|
15th FC HG 22-23 |
|
566 |
15-01-2022-23 |
Construction of Block Public Health Unit (BPHU) at Kushmandi RH |
|
Suhita Paul |
12/08/2022 |
₹4,808,947.00 |
21/10/2022 |
1055/ZP |
Not started |
365
|
15th FC HG 22-23 |
|
567 |
12-07-2022 |
Installation of LED Street Light(High Mast Tower) at Hazratpur Madrasa Field, Hazratpur GP in P.S. Tapan, Dist- Dakshin Dinajpur |
|
Nihar Ghosh |
25/07/2022 |
₹580,485.00 |
06/12/2022 |
1171/ZP |
25/01/2023 |
Scheme Completed: 27/03/2023 |
15th FC Un -Tide 20-21 |
|
568 |
12-04-2022-23 |
Construction of Covered Drain from Kushmandi Jut Godown towards Samsia Khari in P.S. Kushmandi. |
|
Suhita Paul |
25/07/2022 |
₹971,153.00 |
12/06/2022 |
1170/ZP |
18/01/2023 |
Scheme Completed: 30/03/2023 |
15th FC Tide 21-22 |
|
569 |
11-07-2022-23 |
Construction of Covered Drain from DNT More towards Adibashipara in P.S. Tapan. |
|
Somnath Kuiry |
25/07/2022 |
₹971,154.00 |
12/06/2022 |
1169/ZP |
31/01/2023 |
Scheme Completed: 09/05/2023 |
15th FC Tied 21-22 |
|
570 |
11-06-2022-23 |
Installation of LED Street Light(High Mast Tower) at Dipkhanda FP School , Dipkhanda GP in P.S. Tapan, Dist- Dakshin Dinajpur |
|
Nihar Ghosh |
25/07/2022 |
₹580,485.00 |
12/06/2022 |
1168/ZP |
25/01/2023 |
Scheme Completed: 28/03/2023 |
15th FC Un-Tied 21-22 |
|
571 |
07-15-2020-21 |
Repair of road from Patharghata SBI towards Swasthyakendra via Burning Ghat under Mahabari GP in P.S. Banshihari |
|
Suhita Paul |
06/10/2020 |
₹4,367,380.00 |
24/02/2021 |
408/Engg/ZP |
27/02/2021 |
Scheme Completed: 08/08/2023 |
Repair/Maintenance of Rural Road other than BGSY during 2020-21 |
|
572 |
27-02-2020-21 |
Supply of safe drinking water by providing water ATM at Udaypur, GP - Udaypur under Kushmandi P.S. |
|
Suhita Paul |
18/02/2021 |
₹543,846.00 |
24/08/2021 |
228/Engg/ZP |
27/04/2022 |
45
Days Left:-1049
|
15th FC Tied |
|
573 |
03-06-2021-22 |
Construction of covered drain from Mahammadpur Disharikura pond to Faigar Choudhuri house in P.S. Banshihari |
|
Suhita Paul |
24/09/2021 |
₹582,692.00 |
03/12/2021 |
511/ZP |
26/11/2022 |
Scheme Completed: 02/02/2023 |
15th FC Tied |
|
574 |
21-12-2020-21 |
Supply of Solar Based Over Head Running Drinking Water Near H/O Ramkisku, Vill-Beline, GP-Chakvrigu under P.S. Balurghat (Fund : 15th FC Tied) (ID - 44811304) |
K Bhattacharjee |
Kalyan Bose |
05/02/2021 |
₹971,154.00 |
25/02/2021 |
411/Engg/ZP |
28/03/2021 |
Scheme Completed: 02/11/2022 |
15th FC Tied |
|
575 |
13-09-2022-23 |
Drinking Water facility at Bhentara More by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1054/ZP |
Not started |
120
|
BADP |
|
576 |
13-08-2022-23 |
Drinking Water facility at Bhadrail Hatkhola by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Tapan. |
Jaydip Ray |
Somnath Kuiry |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1053/ZP |
Not started |
120
|
BADP |
|
577 |
13-07-2022-23 |
Drinking Water facility at Katabari High School by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi. |
Jaydip Ray |
Suhita Paul |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1052/ZP |
Not started |
120
|
BADP |
|
578 |
13-06-2022-23 |
Drinking Water facility at Jakirpur High School, by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kumarganj. |
Rana Ray |
PABAN BASAK |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1051/ZP |
Not started |
120
|
BADP |
|
579 |
13-05-2022-23 |
Drinking Water facility at Market, Udaypur by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi. |
Jaydip Ray |
Suhita Paul |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1050/ZP |
Not started |
120
|
BADP |
|
580 |
13-04-2022-23 |
Drinking Water facility at Balupara Fatepur High School by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Hili |
Rana Ray |
Somnath Kuiry |
10/08/2022 |
₹971,154.00 |
21/10/2022 |
1049/ZP |
Not started |
120
|
BADP |
|
581 |
13-03-2022-23 |
Drinking Water facility at Jalghar Bazar by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Tapan. |
Jaydip Ray |
Somnath Kuiry |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1048/ZP |
Not started |
120
|
BADP |
|
582 |
13-02-2022-23 |
Drinking Water facility at Sarbamangala High School, Basuria by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1047/ZP |
Not started |
120
|
BADP |
|
583 |
12-05-2022-23 |
Construction of Covered Drain from Fulbari Bus-stand towards Dholu Kabiraj house (both side) under Uday GP in PS Gangarampur (ID 47405275) |
Jaydip Ray |
Kalyan Bose |
25/07/2022 |
₹2,717,962.00 |
21/10/2022 |
1046/ZP |
06/05/2023 |
75
Days Left:-645
|
15th FC 21-22 Tied |
|
584 |
12-03-2022-23 |
Construction of Cover Drain from Kashimaddin Sarkar House to Saidur Rahaman House in P.S. banshihari (ID 47400955) |
Jaydip Ray |
Suhita Paul |
25/07/2022 |
₹1,235,404.00 |
21/10/2022 |
1045/ZP |
06/02/2023 |
Scheme Completed: 02/05/2023 |
15th FC 21-22 Tied |
|
585 |
12-02-2022-23 |
Construction of covered drain from Hatanpara village to PMGSY Road in P.S. Banshihari (ID 47402807) |
Jaydip Ray |
Suhita Paul |
25/07/2022 |
₹586,086.00 |
21/10/2022 |
1044/ZP |
20/01/2023 |
Scheme Completed: 25/03/2023 |
15th FC 21-22 Tied |
|
586 |
11-12-2022-23 |
Construction of Covered Drain infront of Sitahar Bazar under Bhour GP in P.S. Kumarganj. (ID 52229125) |
Rana Ray |
Somnath Kuiry |
25/07/2022 |
₹1,188,235.00 |
21/10/2022 |
1043/ZP |
05/01/2023 |
Scheme Completed: 24/03/2023 |
15th FC 21-22 Tied |
|
587 |
11-11-2022-23 |
Construction of Covered Drain from Pachipukur to Ichamoti River under Jakirpur GP in P.S. Kumarganj. (ID 47401686) |
Rana Ray |
Somnath Kuiry |
25/07/2022 |
₹1,980,392.00 |
21/10/2022 |
1042/ZP |
24/11/2022 |
Scheme Completed: 30/05/2023 |
15th FC 21-22 Tied |
|
588 |
11-09-2022-23 |
Construction of Covered Drain from Kamarpara Hat under Amritakhanda GP in P.S. Balurghat. (ID 47404982) |
Rana Ray |
PABAN BASAK |
25/07/2022 |
₹1,485,294.00 |
21/10/2022 |
1041/ZP |
25/11/2022 |
Scheme Completed: 28/01/2024 |
15th FC 21-22 Tied |
|
589 |
11-08-2022-23 |
Construction of Covered Drain from Tapan RSP Parti Office towards Electric Office in P.S. Tapan. (ID 47405410) |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹2,202,577.00 |
21/10/2022 |
1040/ZP |
06/01/2023 |
Scheme Completed: 13/10/2023 |
15th FC 21-22 Tied |
|
590 |
11-03-2022-23 |
Construction of CC Road from Baghati Pacca Road via Molla Pukur towards Dinesh Orawn House in P.S. Tapan (ID 47452271) |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹776,923.00 |
21/10/2022 |
1039/ZP |
22/12/2022 |
Scheme Completed: 21/02/2023 |
15th FC 21-22 Un-Tied |
|
591 |
11-02-2022-23 |
Construction of CC Road from Ranjit Das House towards Khudibagan in P.S. Tapan (ID 47441909) |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹388,462.00 |
21/10/2022 |
1038/ZP |
24/11/2022 |
Scheme Completed: 05/02/2023 |
15th FC 21-22 Un-Tied |
|
592 |
11-01-2022-23 |
Construction of CC Road from Talpukur towards Saijudding Mondal in P.S. Tapan. |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹776,923.00 |
21/10/2022 |
1037/ZP |
09/12/2022 |
Scheme Completed: 05/02/2023 |
15th FC 20-21 Savings |
|
593 |
01-06-2022-23 |
Construction of CC Road from Dangapara road to Ranipur PMGSY via Ekdala in PS Kushmandi |
Jaydip Ray |
Suhita Paul |
20/04/2022 |
₹582,692.00 |
09/09/2022 |
937/ZP |
05/12/2022 |
Scheme Completed: 25/02/2023 |
15th FC 20-21 Un Tied Savings |
|
594 |
04-12-2022-23 |
Construction of Covered Drain from Kushmandi Ganesh Jha house towards Uttam Roy’s House in P.S. Kushmandi. |
Jaydip Ray |
Suhita Paul |
20/04/2022 |
₹874,039.00 |
13/09/2022 |
949/ZP |
10/03/2023 |
Scheme Completed: 18/05/2023 |
15th FC 21-22 Tied |
|
595 |
02-10-2022-23 |
Construction of CC with Piling from Kalaiadanga More to Mamtaj Miya house under Safanagar GP in PS Kumarganj |
Rana Ray |
PABAN BASAK |
20/04/2022 |
₹1,485,294.00 |
09/09/2022 |
939/ZP |
20/10/2022 |
Scheme Completed: 20/01/2023 |
15 FC 21-22 Un-tied |
|
596 |
02-09-2022-23 |
Construction of CC Road from Sanjoy Das Mudi Khana Shop to Uttam Joarder House under Patiram GP in PS Balurghat |
Rana Ray |
PABAN BASAK |
20/04/2022 |
₹1,386,275.00 |
09/09/2022 |
938/ZP |
20/10/2022 |
Scheme Completed: 13/02/2023 |
15 FC 21-22 Un-tied |
|
597 |
03-05-2022-23 |
Construction of CC Road from Gour Nandi house to Ansar Ali house under Bagichapur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹390,150.00 |
14/09/2022 |
956/ZP |
22/10/2022 |
60
Days Left:-856
|
15 FC 21-22 Un-tied |
|
598 |
01-05-2022-23 |
Construction of CC Road from Battoki Gram Gola Bhabder towards Aampara, Malipara under Sayedpur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹678,810.00 |
09/09/2022 |
936/ZP |
22/10/2022 |
75
Days Left:-841
|
15 FC 21-22 Un-tied |
|
599 |
05-08-2022 |
Construction of Covered Drain from Harirampur Milon Debnath Dokan towards Thana more under Bagichapur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹1,456,061.00 |
13/09/2022 |
950/ZP |
21/10/2022 |
60
Days Left:-857
|
15 FC 21-22 Tied |
|
600 |
02-11-2022-23 |
Construction of CC Road from Chandipur High School to Pathaltal under Sayedpur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹1,165,243.00 |
09/09/2022 |
940/ZP |
21/10/2022 |
60
Days Left:-857
|
15 FC 21-22 Un-tied |
|