1 |
36-01-23-24 |
a) Supply of Material for Construction of Biogas Plant b) Construction of shed along with platform along with shed for installation of electrical and mechanical items c) Construction of Approach road for Biogas Plant & d) Construction of Fencing for Biogas Plant with Gate . |
|
PABAN BASAK |
17/08/2023 |
₹632,104.00 |
04/10/2023 |
1471/ZP |
Not started |
60
|
SBMG |
|
2 |
35-02-23-24 |
Proposed Estimate for the repairing & renovation works at Block-E of Dakshin Dinajpur Zilla Parishad building, Balurghat, Dakshin Dinajpur, West Bengal. - 87104648 |
|
PABAN BASAK |
08/08/2023 |
₹559,700.00 |
04/10/2023 |
1470/ZP |
Not started |
60
|
16th FC Supplementary (22-23) |
|
3 |
35-01-23-24 |
Proposed Estimate for the repairing & renovation works of Toilet Block at Dakshin Dinajpur Zilla _ Parishad building, Balurghat, Dakshin Dinajpur, West bengal. - 76055366 |
|
PABAN BASAK |
08/08/2023 |
₹161,036.00 |
04/10/2023 |
1469/ZP |
Not started |
60
|
15th FC Supplementary (22-23) |
|
4 |
23-05-23-24 |
Construction of Covered Drain from house of Sattar Miah towards pond of Jafrul vill- Boroidanga in Mahabari GP in P.S. Banshihari-58351249 |
|
Suhita Paul |
09/08/2023 |
₹970,976.00 |
04/10/2023 |
1468/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
5 |
34-03-23-24 |
Construction of Covered Drain from Ghoshpara Hari Mandir towards Sudha Kar House in P.S. Gangarampur-52229069 |
|
Kalyan Bose |
09/08/2023 |
₹1,164,360.00 |
04/10/2023 |
1467/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
6 |
34-01-23-24 |
Construction of Block Public Health Unit(BHPU) at Hili RH under Hili PS. |
|
Somnath Kuiry |
09/08/2023 |
₹5,648,657.00 |
04/10/2023 |
1466/ZP |
Not started |
365
|
XV FC Health Grant (2023-24) |
|
7 |
33-05-2023 |
Construction of Covered Drain from Badal Das House towards Culvert in Ganguria GP in P.S. Banshihari.-58363996 |
|
Suhita Paul |
08/08/2023 |
₹971,007.00 |
04/10/2023 |
1465/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
8 |
32-02-23-24 |
Design, Development, Installation & Commissioning of Mechanical, Electrical and Instrumentation Item for operation of Biogas Plant and utilization of Biogas . |
|
PABAN BASAK |
26/07/2023 |
₹2,124,000.00 |
04/10/2023 |
1464/ZP |
Not started |
|
SBMG |
|
9 |
31-03-23-24 |
Construction of Covered Drain from Keshabpur FP School towards Ganesh house (Jahangirpur) in PS Gangarampur |
|
Kalyan Bose |
24/07/2023 |
₹2,328,783.00 |
04/10/2023 |
1463/ZP |
Not started |
70
|
15th FC 21-22 Tied |
|
10 |
2-04-23-24 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Chaloon High School, Vill-Sahara/Chaloon, GP-Chaloon under Gangarampur PS-47380685 |
|
PABAN BASAK |
01/01/1970 |
₹547,564.00 |
08/05/2023 |
747/ZP |
27/05/2023 |
60
Days Left:-273
|
15th FC TIED (21-22) |
|
11 |
13-21-20-21 |
Constructin of community Toilet at Rampur Hat Khola in Harsura GP, Tapan PS |
|
PABAN BASAK |
30/12/2020 |
₹960,557.00 |
06/02/2021 |
322/ZP |
08/09/2021 |
45
Days Left:-914
|
15th FC TIED (20-21 |
|
12 |
60-04-22-23 |
Repair and Maintenance of Road from Madhu Malakar House to Narayan Deb House in vill-Belbari under Belbari GP in P.S. Gangarampur |
|
PABAN BASAK |
23/03/2023 |
₹445,588.00 |
04/05/2023 |
725/ZP |
03/06/2023 |
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
13 |
04-13-23-24 |
Supply and Installation of LED Solar Street Light Chakpara and Khalpara in P.S. Tapan, GP- Gofanagar, Dist- Dakshin Dinajpur.-58025679 |
|
Nihar Ghosh |
01/01/1970 |
₹322,294.00 |
01/01/1970 |
1208/ZP |
13/09/2023 |
Scheme Completed: 09/10/2023 |
15th FC UN TIED (2022-23) |
|
14 |
09-09-23-24 |
Construction of CC Road from Barabari to Chakpara at Ellahabad GP in P.S. Banshihari-5758813 |
|
Suhita Paul |
01/01/1970 |
₹971,151.00 |
01/01/1970 |
903/ZP |
12/07/2023 |
Scheme Completed: 07/09/2023 |
15th FC UN-TIED 22-23 |
|
15 |
30-09-23-24 |
Supply of Safe Drinking water by Providing Water ATM at near Rajkumar House(Solar Electrical work), GP-Gangu.ia under Banshihari P5-44811211 |
|
Nihar Ghosh |
19/07/2023 |
₹199,998.00 |
31/08/2023 |
1354/ZP |
Not started |
90
|
15th FC TIED (20-21) |
|
16 |
30-08-23-24 |
Supply of Safe Drinking water. by Providing Water ATM at near Singadha Nabarun Rural Library(Solar LEctrical Work), GP Ganguria under Banshihari P5-44811197 |
|
Nihar Ghosh |
19/07/2023 |
₹199,998.00 |
31/08/2023 |
1353/ZP |
Not started |
90
|
15th FC TIED (20-21) |
|
17 |
30-04-23-24 |
Construction of Covered Drain from Gopalpur Jiyaruddin House towards Najmul Mia House, Shirsi in P.S Harirampur-58355994 |
|
Kalyan Bose |
19/07/2023 |
₹972,026.00 |
31/08/2023 |
1352/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
18 |
30-03-23-24 |
Construction of covered drain from Majidur Shop towards Kali Mandir at Gopalpur, Ashokgram GP in P.S. Gangarampur-58345649 |
|
PABAN BASAK |
19/07/2023 |
₹485,437.00 |
31/08/2023 |
1351/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
19 |
30-02-23-24 |
Construction of covered Drain from Majidur Miah House towards Palpara under Dwipkhanda GP in P.S. Tapan-58335029 |
|
Somnath Kuiry |
19/07/2023 |
₹971,152.00 |
31/08/2023 |
1350/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
20 |
29-01-23-24 |
Repair and Upgradation of Road from NH-512 at Ramkrishna Ashram, Balurghat to Correctional Home, Balurghat in Dist. Dakshin Dinajpur. |
|
PABAN BASAK |
19/07/2023 |
₹3,412,600.00 |
31/08/2023 |
1349/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
21 |
28-01-23-24 |
Construction of EVM Ware house(Three Storied) beside Minority building at Balurghat District Collectorate Campus, Dakshin Dinajpur, JL No-105, Plot No- 2703, Mouza-Dakra |
|
|
01/06/2023 |
₹11,897,248.00 |
09/08/2023 |
1244/ZP |
Not started |
365
|
EVM/VVPAT Warehouses Fund |
|
22 |
27-01-23-24 |
Installation of Drinking Water system at Shyamganj Das para, Saidpur under Harirampur P.S.-44811261 |
|
Kalyan Bose |
01/06/2023 |
₹543,656.00 |
08/08/2023 |
1240/ZP |
Not started |
60
|
15th FC TIED (20-21) |
|
23 |
25-17-23-24 |
Construction of Covered Drain from Chourangi Bishramagar east side towards Afjal Miah house in P.S. Kushmandi-58369699 |
|
Suhita Paul |
29/05/2023 |
₹727,955.00 |
08/08/2023 |
1239/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
24 |
25-15-23-24 |
Installation of Drinking Water System at Dolgram, Karbala Math, Bagichapur under Harirampur PS.-47387364(Civil Portion only) |
|
Kalyan Bose |
29/05/2023 |
₹547,564.00 |
08/08/2023 |
1238/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
25 |
25-12-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Mahabul Miah at mouja-Sayedpur ,Sayedpur G.P. under Harirampur Block-66444178 |
|
Kalyan Bose |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1237/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
26 |
25-11-23-24 |
Drinking water facility in front side of Majhapara(Amtali) , Kushmandi , by Sinking and Installation 150mmX80mm tubewell (solar Operated) under 15th FC (Tied) Fund in PS- Kushmandi.-47391140 |
|
Nihar Ghosh |
29/05/2023 |
₹970,160.00 |
08/08/2023 |
1236/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
27 |
46-03-22-23 |
Construction of CC Road from Masjid via Soleman Mia House towards Ismail Sarkar Gochiar under Damdama GP in P.S. Gangarampur-57721006 |
|
Kalyan Bose |
10/02/2023 |
₹1,456,731.00 |
29/05/2023 |
961/ZP |
13/07/2023 |
45
Days Left:-241
|
15th FC UN-TIED (22-23) |
|
28 |
25-10-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Anchar ali Sarkar at mouja-Nichinta ,Harsura G.P. under Tapan Block-66443920 |
|
Nihar Ghosh |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1235/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
29 |
25-09-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Jaynal Mondal at Dipkhanda Mouza, Dipkhanda GP under Tapan Block.-66435447 |
|
Nihar Ghosh |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1234/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
30 |
25-04-23-24 |
Construction of covered drain from Sayedpur Shyamsundar Sarkar House to Kanailal Pond under Boaldar GP in P.S. Balurghat-58358811 |
|
PABAN BASAK |
29/05/2023 |
₹990,196.00 |
08/08/2023 |
1233/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
31 |
|
Construction of Building of Bisramagar infront of Saint Piter under Danga GP in P.S. Building-57805730 |
|
PABAN BASAK |
29/05/2023 |
₹273,910.00 |
08/08/2023 |
1232/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
32 |
25-02-23-24 |
Construction of covered drain from Subhash Gupta House towards Kujbihari Saha Mill, Bagichapur in P.S. Harirampur-58564179 |
|
Kalyan Bose |
29/05/2023 |
₹776,851.00 |
08/08/2023 |
1231/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
33 |
24-07-23-24 |
Installation of Solar Light in Dakshin DInajpur District area total No-125(one hundred twenty five only) |
|
Nihar Ghosh |
22/05/2023 |
₹3,143,416.00 |
01/09/2023 |
1360/ZP |
Not started |
90
|
MPLAD |
|
34 |
24-04-23-24 |
Construction of CC Road and Pilling from Ramash Mandal Pond and Shib Mandir to Sachin Roys House and Nijrul Sarkar House to FP School Kutubpur under Samjia GP in P.S. Kumarganj-57722937 |
|
Somnath Kuiry |
22/05/2023 |
₹1,942,308.00 |
08/08/2023 |
1230/ZP |
Not started |
90
|
15th FC UN-TIED (22-23) |
|
35 |
24-03-23-24 |
Repair and Maintenance of road from the House of Jishu Hasda to the Agricultural Land of Likhan Tudu at Shikarpur Gram of Sahapur Sansad No-07 Ramchandrapur GP in P.S. Tapan |
|
Somnath Kuiry |
22/05/2023 |
₹2,027,657.00 |
08/08/2023 |
1229/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
36 |
19-04-23-24 |
Drilling and Installation Light Duty Tube Well 150 mm x 80 mm (Solar & Electric Operated) (Civil Work) at 4 Nos. (No.2 Belbari, Katatoir, Samjia and Hili) under BADP fund in Dist- Dakshin Dinajpur. |
|
Somnath Kuiry |
12/05/2023 |
₹2,026,875.00 |
08/08/2023 |
1228/ZP |
Not started |
120
|
BADP |
|
37 |
19-03-23-24 |
Repair and maintenance of Itakhore towards Bagmari via Ukhail FP School under Bagichapur GP In P.S. Harirampur. |
|
Kalyan Bose |
12/05/2023 |
₹2,229,465.00 |
08/08/2023 |
1227/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
38 |
19-02-23-24 |
Repairing of Maintenance BT road from Badsankair Sukamal Basak House via Muslim Para to Nedor under Gofanagar GP in P.S. Tapan. |
|
Somnath Kuiry |
12/05/2023 |
₹1,980,392.00 |
08/08/2023 |
1226/ZP |
Not started |
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
39 |
|
Repairing of Maintenance road from Charail Krishnapur Pacca road to House of Manash Ray via Har Basar tala under Bhor GP in P.S. KUmarganj. |
|
Somnath Kuiry |
12/05/2023 |
₹1,165,385.00 |
08/08/2023 |
1225/ZP |
Not started |
90
|
Repair/Maintenance of Rural Roads other than Gramin Sadak Yojana |
|
40 |
17-02-23-24 |
Construction of Covered Drain from Raghunath Bati Culvert towards Sanjit Sarkar House under Damdama GP in P.S. Gangarampur-58563487 |
|
Kalyan Bose |
04/05/2023 |
₹1,514,908.00 |
08/08/2023 |
1224/ZP |
Not started |
45
|
15th FC TIED (22-23) |
|
41 |
25-12-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Mahabul Miah at mouja-Sayedpur ,Sayedpur G.P. under Harirampur Block-66444178 |
|
Nihar Ghosh |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1237/ZP |
23/08/2023 |
60
Days Left:-185
|
"15th FC TIED (2022-23)" |
|
42 |
57-22-22-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Saifur Rahaman at Branpara mouza (Chakdebibsa),Nandanpur G.P. under Gangarampur Block-66436666 |
|
Nihar Ghosh |
16/03/2023 |
₹770,406.00 |
16/05/2023 |
826/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
43 |
57-20-22-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Saidyhed Ali Shah at Damina mouza,Jahangirpur G.P. under Gangarampur Block-66443484 |
|
Nihar Ghosh |
16/03/2023 |
₹770,406.00 |
16/05/2023 |
824/ZP |
22/08/2023 |
60
Days Left:-186
|
15th FC TIED (2022-23) |
|
44 |
57-21-22-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Satendranath Roy at Jahangirpur mouja,Jahangirpur G.P. under Gangarampur Block-66436480 |
|
Nihar Ghosh |
16/03/2023 |
₹770,406.00 |
16/05/2023 |
825/ZP |
28/08/2023 |
60
Days Left:-180
|
15th FC TIED (2022-23) |
|
45 |
21-05-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Ganesh CH. Roys at mouja-Palashi ,Samjia G.P. under Kumarganj Block-66444254 |
|
Nihar Ghosh |
16/05/2023 |
₹770,406.00 |
19/07/2023 |
1121/zp |
17/08/2023 |
60
Days Left:-191
|
15th FC 21-22 Tied |
|
46 |
02-07-22-23 |
Construction of CC Road from Batun Bus Stand to Debhog via Raghunathpur in PS Kumarganj |
|
Somnath Kuiry |
20/04/2022 |
₹990,196.00 |
27/07/2022 |
771/ZP |
02/05/2023 |
Scheme Completed: 09/08/2023 |
15th FC Un-Tied 21-22 |
|
47 |
10-01-22-23 |
Construction of Road from SH-10 to Buniadpur Municipality Waste Disposal site in P.S. Banshihari. |
|
Suhita Paul |
04/07/2022 |
₹5,614,258.00 |
21/11/2022 |
1127/ZP |
19/04/2023 |
90
Days Left:-281
|
SUDA & ZP fund |
|
48 |
09-10-23-24 |
Repair and Maintenance of CC Road from Sihol Daral Hat to Sanjit Sarkar House to Chotosihol at Ellahabad GP in P.S. Banshihari. |
|
Suhita Paul |
19/04/2023 |
₹971,302.00 |
24/05/2023 |
904/ZP |
24/05/2023 |
Scheme Completed: 03/08/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
49 |
09-07-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Amiya Prasad sarkar at mouja-Bhatpara Bhatpara G.P. under Balurghat Block-66447047 |
|
Nihar Ghosh |
19/04/2023 |
₹770,406.00 |
24/05/2023 |
901/ZP |
24/07/2023 |
60
Days Left:-215
|
15th FC TIED (2022-23) |
|
50 |
23-05-23-24 |
Supply and Fixing of Electrical Fittngs(Tube Light/Ceilling Fan/Exhaust Fan/Call bell) Public Health unit (BPHU) at Harirampur RH in Harirampur P.S. Dist-Dakshin Dinajpur |
|
Nihar Ghosh |
19/05/2023 |
₹160,782.00 |
19/07/2023 |
1137/ZP |
11/08/2023 |
Scheme Completed: 14/08/2023 |
XV FC-Health Grants for FY-2021-22 |
|
51 |
23-04-23-24 |
Supply and Fixing of Electrical Fittngs(Tube Light/Ceilling Fan/Exhaust Fan/Call bell) Public Health unit (BPHU) at Tapan RH in Tapan P.S. Dist-Dakshin Dinajpur |
|
Nihar Ghosh |
19/05/2023 |
₹160,782.00 |
19/07/2023 |
1136/ZP |
Not started |
30
|
XV FC-Health Grants for FY-2021-22 |
|
52 |
23-03-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Sahajan Mandal at mouja-Deor ,Deor G.P. under Kumarganj Block-66445699 |
|
Nihar Ghosh |
19/07/2023 |
₹770,406.00 |
19/07/2023 |
1135/ZP |
17/08/2023 |
60
Days Left:-191
|
15th FC TIED (2022-23) |
|
53 |
23-02-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Mangal Hasda at mouja-Kamarpara,Amritakhanda G.P. under Balurghat Block-66445557 |
|
Nihar Ghosh |
19/05/2023 |
₹770,406.00 |
19/07/2023 |
1134/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
54 |
22-09-23-24 |
Supply and Installation of LED Solar Street light at N/H of 1) Sonal Tudu,2) N/H of Rabi Tudu,3) N/H of Kandan Hemram,4) N/H of Prasanna Hemram, 5) N/H of Bishu Saren, 6) N/H of Mantu Hemram,7) N/H of Shikarpur FP School gate 8) N/H of Biswanath Murmu 9) N/H of Rabi Hasda 10) N/H of Somen Tudu 11) N/H of Likhan Tudu 12) N/H of Sukal Murmu. Block-Tapan GP-No-07 Ramchandrapur ,Dist-Dakshin Dinajpur 75942029 |
|
Nihar Ghosh |
01/05/2023 |
₹348,532.00 |
19/07/2023 |
1133/ZP |
11/08/2023 |
60
Days Left:-197
|
15th FC Supplementary (2022-23) |
|
55 |
22-08-23-24 |
Construction o CC Road from the ICDS Center(No-250) to the house of Singha Murmu in P.S. Tapan-75950722 |
|
Somnath Kuiry |
01/05/2023 |
₹388,280.00 |
19/07/2023 |
1132/ZP |
Not started |
60
|
15th FC Supplementary (2022-23) |
|
56 |
22-07-23-24 |
Construction of CC Road with 50 mtr. RCC Cover Drain from (ICDS center-250) the house of Sonal Tudu to the Agriculture Land of Sonal Tudu in P.S. Tapan-75944778 |
|
Somnath Kuiry |
01/05/2023 |
₹974,156.00 |
19/07/2023 |
1131/ZP |
Not started |
90
|
15th FC Supplementary (2022-23) |
|
57 |
22-06-23-24 |
Construction of covered Drain frpm Dudiya Kuri towards Hasnagar Uttar Para under Gofanagar GP in P.S. Tapan-58538162 |
|
Somnath Kuiry |
01/05/2023 |
₹874,039.00 |
19/07/2023 |
1130/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
58 |
22-03-23-24 |
Supply and Installation of LED Solar Street Light at Kharuya Sashan in P.S. Harirampur, GP-Bagichapur, Dist- Dakshin Dinajpur.-57911391 |
|
Nihar Ghosh |
01/05/2023 |
₹0.00 |
19/07/2023 |
1129/ZP |
07/08/2023 |
Scheme Completed: 03/09/2023 |
15th FC TIED (2022-23) |
|
59 |
22-02-23-24 |
Supply and Installation of LED Solar Street Light at Chakbhagirath Adibasipara and Burakuri Sansad, Jamlabad(front side mijanur Sarkar house), Chamtakuri more in P.S. Tapan, GP-Ramchandrapur & Malancha, Dist- Dakshin Dinajpur-58044808 |
|
Nihar Ghosh |
01/05/2023 |
₹506,462.00 |
19/07/2023 |
1128/ZP |
11/08/2023 |
Scheme Completed: 22/08/2023 |
15th FC TIED (2022-23) |
|
60 |
22-01-23-24 |
Supply and Installation of LED Solar Street Light at Katabari in P.S.-Gangarampur, GP-Sukdevpur, Dist- Dakshin Dinajpur-57911122 |
|
Nihar Ghosh |
05/01/2023 |
₹0.00 |
07/12/2023 |
1127/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
61 |
21-13-23-24 |
Construction of Community Toilet at Gokulpur Bazar, Ashokgram in PS-Gangarampur-47393885 |
|
PABAN BASAK |
01/01/1970 |
₹541,881.00 |
19/07/2023 |
1126/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
62 |
21-12-23-24 |
Supply of Safe Drinking Water by Providing Water ATM at Pukurtala, GP-Uday under Gangarampur PS-47380375(Civil Portion only) |
|
Kalyan Bose |
16/05/2023 |
₹547,564.00 |
19/07/2023 |
1125/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
63 |
21-10-23-24 |
Installation of Drinking Water System near Mahendipara Police Camp Pundari under Harirampur PS-44811251 |
|
Kalyan Bose |
16/05/2023 |
₹547,564.00 |
19/07/2023 |
1124/ZP |
Not started |
60
|
15th FC TIED (20-21) |
|
64 |
21-07-23-24 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Najibar Miah House in Masjit, Vill-Tetrahail, GP-Uday under Gangarampur PS.-52228835 |
|
PABAN BASAK |
16/05/2023 |
₹554,510.00 |
19/07/2023 |
1123/ZP |
Not started |
60
|
15th FC TIED (2021-22) |
|
65 |
21-06-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Bachu Mondal at mouja-Debipur ,Jakirpur G.P. under Kumarganj Block-66444312 |
|
Nihar Ghosh |
01/01/1970 |
₹770,406.00 |
19/07/2023 |
1122/ZP |
17/08/2023 |
60
Days Left:-191
|
15th FC TIED (2022-23) |
|
66 |
21-05-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Ganesh CH. Roys at mouja-Palashi ,Samjia G.P. under Kumarganj Block-66444254 |
|
Somnath Kuiry |
16/05/2023 |
₹770,406.00 |
19/07/2023 |
1121/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
67 |
21-03-23-24 |
Supply and Instalation of Mini .Mast Light with LED Flood Light fittings in front of Daulatpur Uttarpara Club under Banshihari Block. |
|
Suhita Paul |
16/05/2023 |
₹155,822.00 |
19/07/2023 |
1120/ZP |
Not started |
45
|
BEUP 42 No Harirampur LAC |
|
68 |
21-02-2023 |
Supply and Installation of Mini Mast Light with LED Flood Light fittings at Bataskuri Durgamandir Banshihari Block |
|
Suhita Paul |
16/05/2023 |
₹155,822.00 |
19/07/2023 |
1119/ZP |
Not started |
45
|
BEUP 42 No Harirampur LAC |
|
69 |
21-01-23-24 |
Supply and Installation of Solar Panel at Mahendra High School under Bairhatta GP in P.S. Harirampur. |
|
Kalyan Bose |
16/05/2023 |
₹199,259.00 |
19/07/2023 |
1118/ZP |
Not started |
45
|
BEUP 42 No Harirampur LAC |
|
70 |
20-06-23-24 |
Supply and Installation of LED Solar Street light at front side of Katkal TaTa Hat. Block-Kumarganj,GP-Bhour,Dist-Dakshin Dinajpur-58022964 |
|
Nihar Ghosh |
12/05/2023 |
₹505,168.00 |
19/07/2023 |
1117/ZP |
11/08/2023 |
Scheme Completed: 07/11/2023 |
15th FC –UN-TIED (22-23) |
|
71 |
20-05-23-24 |
Installation of Mini Mast with LED Solar Street light at Chaloon BPHC in P.S.-Gangarampur ,G.P.-Chaloon, Dist-Dakshin Dinajpur-57851846 |
|
Nihar Ghosh |
12/05/2023 |
₹506,897.00 |
19/07/2023 |
1116/ZP |
24/08/2023 |
60
Days Left:-184
|
15th FC –UN-TIED (22-23) |
|
72 |
20-04-23-24 |
Installation of Mini Mast with LED Solar Street light at Panjipara in P.S.-Banshihari ,G.P.-Chaloon, Dist-Dakshin Dinajpur-57850735 |
|
Nihar Ghosh |
12/05/2023 |
₹505,168.00 |
19/07/2023 |
1115/ZP |
Not started |
60
|
15th FC –UN-TIED (22-23) |
|
73 |
20-03-23-24 |
Construction of Covered Drain from Kalam Choudhury House to Rail Gate in P.S. Banshihari. |
|
Suhita Paul |
12/05/2023 |
₹485,577.00 |
19/05/2023 |
1114/ZP |
21/07/2023 |
Scheme Completed: 05/12/2023 |
15th FC TIED (22-23) |
|
74 |
20-02-23-24 |
Construction of Cover Drain from Belpukur Mission to Jaharpur Khari in Vill-Belbari under Elahabad GP in P.S. Banshihari-58352519 |
|
Suhita Paul |
12/05/2023 |
₹495,098.00 |
19/05/2023 |
1113/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
75 |
20-01-23-24 |
Construction of Cover Drain at Nandapukur 9n Vill-Nandapukur under Akcha GP in P.S. Kushmandi-58360894 |
|
Suhita Paul |
12/05/2023 |
₹742,646.00 |
19/07/2023 |
1112/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
76 |
18-01-23-24 |
Construction of Community Toilet at Purba Bishnapur Ashokgram in P.S. Gangarampur.-47394053 |
|
PABAN BASAK |
03/05/2023 |
₹541,881.00 |
29/05/2023 |
960/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
77 |
16-19-23-24 |
Installation of solar street light in Gangarampur Municipality Area different ward (Total No-32) |
|
Nihar Ghosh |
03/05/2023 |
₹804,714.00 |
29/05/2023 |
959/ZP |
Not started |
60
|
BEUP 41 |
|
78 |
16-18-23-24 |
Repairing of Metal Road from NH-512 towards Ratanmala Colony in P.S.Gangarampur, |
|
Kalyan Bose |
03/05/2023 |
₹895,159.00 |
29/05/2023 |
958/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
79 |
16-17-23-24 |
Construction of CC Road from Front of Haridas House towards Battala Sub-Center at Maligaon GP in P.S. Kushmandi.-57585818 |
|
Suhita Paul |
03/05/2023 |
₹776,616.00 |
29/05/2023 |
957/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
80 |
16-16-23-24 |
lnstallation of Solar Based overhead Reservoir at front side of Piter Barur House vill- (uaran, chakvrigu under Balurghat PS.- 47388117 |
|
Nihar Ghosh |
03/05/2023 |
₹990,195.00 |
29/05/2023 |
956/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
81 |
16-13-23-24 |
Construction of Building of Bisramagar near Tapser Miah House village of Dwipkhanda under Dwipkhanda GP in PS Tapan-57805730 |
|
Nihar Ghosh |
03/05/2023 |
₹296,950.00 |
29/05/2023 |
955/ZP |
Not started |
60
|
15th FC UN-TIED (2022-23) |
|
82 |
16-11-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Taslima Khatun at mouja-Velakuri ,Udaypur G.P. under Kushmandi Block-66444508 |
|
Nihar Ghosh |
03/05/2023 |
₹770,406.00 |
29/05/2023 |
954/ZP |
08/09/2023 |
60
Days Left:-169
|
15th FC TIED (2022-23) |
|
83 |
16-07-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Haider Ali at mouja-Kanjhara ,Elahabad G.P. under Banshihari Block-66444106 |
|
Nihar Ghosh |
03/05/2023 |
₹770,406.00 |
29/05/2023 |
953/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
84 |
16-05-23-24 |
INSTALATION OF SOLAR BASED PUMP HOUSE FOR MINOR IRRIGATION AT JAGADISHPUR Mafijuddin Sarkar (Dungu) LAND at mouja-Jagadispur ,Uday G.P. under Gangarampur Block-66444018 |
|
Nihar Ghosh |
03/05/2023 |
₹770,406.00 |
29/05/2023 |
952/ZP |
29/07/2023 |
60
Days Left:-210
|
15th FC TIED (2022-23) |
|
85 |
16-02-23-24 |
Supply and Installation of LED Solar Street Light at (i) Jordighi Sashan, Banshihari Block (ii) Kundana Chowrangee More and Banke Bihari Temple, Harirampur Block. |
|
Nihar Ghosh |
03/05/2023 |
₹552,504.00 |
29/05/2023 |
951/ZP |
Not started |
45
|
BEUP |
|
86 |
14-01-23-24 |
Construction of Boundary Wall at Saraswati Sishu Vidya Mandir, Vill- Badbangi(Kharil), Balurghat Block. |
|
PABAN BASAK |
27/04/2023 |
₹4,855,770.00 |
29/05/2023 |
949/ZP |
Not started |
90
|
MPLAD |
|
87 |
14-05-23-24 |
Repair Maintenance of Road from Laxmitala to Anantapur under Akcha GP in P.S. in P.S. Kushmandi. |
|
Suhita Paul |
27/04/2023 |
₹1,943,579.00 |
29/05/2023 |
950/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
88 |
13-04-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Sankar Sarkar at Gochihar at Jotmaljkha Mouza, Damdama GP under Gangarampur Block.-66435511 |
|
Nihar Ghosh |
24/04/2023 |
₹770,406.00 |
29/05/2023 |
948/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
89 |
13-03-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Swarup Sarkar Chakmadhusudan Mouza, Ramchandrapur GP under Tapan Block.-66422451 |
|
Nihar Ghosh |
24/04/2023 |
₹770,406.00 |
29/05/2023 |
947/zp |
21/07/2023 |
60
Days Left:-218
|
15th FC TIED (2022-23) |
|
90 |
13-02-23-24 |
Installation of Water Purified System at Harirampur Hospital, Vill-Harirampur, GP-harirampur under Harirampur PS-56430693 |
|
Kalyan Bose |
24/04/2023 |
₹543,846.00 |
29/05/2023 |
946/zp |
Not started |
90
|
15th FC 2020-21 Savings |
|
91 |
12-03-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Anichur Rahaman Mia at Chatma mouza,Deor G.P. under Kumarganj Block-66437264 |
|
Nihar Ghosh |
24/04/2023 |
₹770,406.00 |
29/05/2023 |
945/ZP |
21/07/2023 |
Scheme Completed: 11/12/2023 |
15th FC TIED (22-23) |
|
92 |
11-11-23-24 |
Construction of Public Health unit (BPHU) under XV-FC HG during the year 2023-24(Internal Electrification work) at Chaloon BPHC in Gangarampur PS |
|
Nihar Ghosh |
20/04/2023 |
₹697,566.00 |
29/05/2023 |
944/ZP |
Not started |
90
|
15th FC Health Grant(23-24) |
|
93 |
11-09-23-24 |
Construction of Building less under XV-FC HG during the year 2023-24(Internal Electrification work) at Kurumsur SC in P.S.Gangarampur |
|
Nihar Ghosh |
20/04/2023 |
₹422,180.00 |
29/05/2023 |
943/ZP |
Not started |
60
|
15th FC Health Grant(23-24) |
|
94 |
11-07-23-24 |
Construction of CC Road from House of Bhabesh Das towards Chintaranjan Club under Ramchandrapur GP In P.S. Tapan.-57728428 |
|
Somnath Kuiry |
20/04/2023 |
₹593,332.00 |
29/05/2023 |
942/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
95 |
11-05-23-24 |
Construction of CC Road from Dakshin Kesrail Bot gach to Parbotpur under Gofanagar GP in P.S. Tapan.-57719730 |
|
Somnath Kuiry |
20/04/2023 |
₹971,154.00 |
29/05/2023 |
941/ZP |
18/08/2023 |
Scheme Completed: 04/11/2023 |
15th FC UN-TIED (22-23) |
|
96 |
11-04-23-24 |
Construction of covered Drain from Jaimuddin Sarkar House to Naimiddin House at Sankar under Gofanagar GP in P.S. Tapan.-58335908 |
|
Somnath Kuiry |
20/04/2023 |
₹485,577.00 |
29/05/2023 |
940/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
97 |
11-03-23-24 |
Construction of Community Toilet at front side of Daral Hat Masjit under Dwipkhanda GP in P.S. Tapan.-58573097(Electrical Work) |
|
Somnath Kuiry |
20/04/2023 |
₹95,497.00 |
29/05/2023 |
939/ZP |
Not started |
60
|
15th FC TIED (22-23 |
|
98 |
11-02-23-24 |
Construction of Community Toilet at front side of Daral Hat Masjit under Dwipkhanda GP in P.S. Tapan.-58573097(Civil Work) |
|
Somnath Kuiry |
20/04/2023 |
₹875,656.00 |
29/05/2023 |
938/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
99 |
11-01-23-24 |
Construction of Community Toilet(Internal Electrification) front side of Kamalpur FP School, Vill-Kamalpur in Hazratpur GP in P.S. Tapan.-44811577 |
|
Somnath Kuiry |
20/04/2023 |
₹84,595.00 |
29/05/2023 |
937/ZP |
Not started |
60
|
15th FC TIED (20-21) |
|
100 |
24-01-22-23 |
Repair & maintenance of wooden foot bridge at Bijli Ghat (over river Brahmani) under Belbari - I GP in PS - Gangarampur |
|
Kalyan Bose |
22/11/2022 |
₹270,590.00 |
15/02/2023 |
207/ZP |
12/03/2023 |
60
Days Left:-349
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
101 |
26-08-22-23 |
Repair and Maintenance of Wooden Foot Bridge with approach road at Uttar Belbari near Jr. Basic School(over Brahmani) under Belbari-I GP in P.S. Gangarampur. |
|
Kalyan Bose |
08/12/2022 |
₹600,400.00 |
10/02/2023 |
175/ZP |
02/06/2023 |
Scheme Completed: 31/08/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
102 |
10-04-23-24 |
Construction of Building-Less Sub-Centers(SCs) at Kurumsur SC under Gangarampur PS |
|
PABAN BASAK |
20/04/2023 |
₹4,255,756.00 |
24/05/2023 |
907/ZP |
Not started |
356
|
XV FC Health Grant (2023-24) |
|
103 |
10-03-23-24 |
Construction of Building-Less Sub-Centers(SCs) at Nilahari SC under Gangarampur PS |
|
PABAN BASAK |
20/04/2023 |
₹4,255,756.00 |
24/05/2023 |
906/ZP |
Not started |
356
|
XV FC Health Grant (2023-24) |
|
104 |
10-01-23-24 |
Construction of Block Public Health Unit(BHPU) at Chaloon BPHC under Gangarampur PS. |
|
Kalyan Bose |
20/04/2023 |
₹5,648,486.00 |
24/05/2023 |
905/ZP |
Not started |
365
|
XV FC Health Grant (2023-24) |
|
105 |
02-12-23-24 |
Installation of LED Street Light(Solar High Mast) at Kumarganj Police Station at Safanagar GP in P.S. Kumarganj, Dist- Dakshin Dinajpur. 66244663 |
|
Nihar Ghosh |
05/04/2023 |
₹506,942.00 |
08/05/2023 |
750/ZP |
30/06/2023 |
Scheme Completed: 05/09/2023 |
15th FC Un-TIED-2020-21(supplementary) |
|
106 |
38-05-22-23 |
Construction of CC Road from Front Side of Bes-an-Noor Model School(Girls) at Haripur of Ellahabad GP in P.S. Banshihari.- 57591991 |
|
Suhita Paul |
19/01/2023 |
₹582,692.00 |
04/12/2023 |
|
03/05/2023 |
Scheme Completed: 06/07/2023 |
15th FC UN-TIED (22-23) |
|
107 |
05-04-2022-23 |
Construction of covered drain from krishnapur Ratin saha house to Chunu Hambrom house in P.S. Banshihari |
|
Suhita Paul |
20/04/2022 |
₹585,802.00 |
21/11/2022 |
1128/ZP |
10/04/2023 |
Scheme Completed: 26/06/2023 |
15th FC 21-22 Tied |
|
108 |
38-01-22-23 |
Construction of CC Road from Kajaltali road towards Haritali Ghat under Basuria GP in P.S. Gangarampur.-57720455 |
|
PABAN BASAK |
19/01/2023 |
₹971,153.00 |
13/04/2023 |
597/ZP |
18/04/2023 |
45
Days Left:-327
|
15th FC UN-TIED (22-23) |
|
109 |
01-10-2022-23 |
Construction of Covered Drain from Mobarakpur Tetultala to Chhiramati river (Syedpur) in PS Harirampur |
|
Kalyan Bose |
20/04/2022 |
₹582,466.00 |
10/01/2023 |
38/ZP |
02/02/2023 |
60
Days Left:-387
|
15th FC 2020-21 Savings |
|
110 |
38-11-22-23 |
Construction of CC Road from Gochiar Buripukur Gupin Barman House to Sadananda House under Damdama GP in P.S. Gangarampur.-66246489 |
|
Kalyan Bose |
19/01/2023 |
₹388,462.00 |
23/03/2023 |
421/ZP |
28/03/2023 |
45
Days Left:-348
|
15th FC(Savings) 2020-21 |
|
111 |
9-03-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Sankar Barman at mouja-Ratanmala ,Damdama G.P. under Gangarampur Block-66444697 |
|
Nihar Ghosh |
19/04/2023 |
₹770,406.00 |
24/05/2023 |
899/ZP |
06/08/2023 |
60
Days Left:-202
|
15th FC TIED (2022-23) |
|
112 |
9-01-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Motibur Molla Mouza-Aktal, Tapan Chandipur GP under Tapan Block.-66443770 |
|
Nihar Ghosh |
19/04/2023 |
₹770,406.00 |
24/05/2023 |
898/ZP |
02/08/2023 |
60
Days Left:-206
|
15th FC TIED (2022-23) |
|
113 |
8-07-23-24 |
Construction of CC Road from Badalpur Bridge to East Side Sajanpur in vill-Badalpur under Bolla GP in P.S. Balurghat.-57726437 |
|
PABAN BASAK |
19/04/2023 |
₹1,485,294.00 |
24/05/2023 |
897/ZP |
18/08/2023 |
90
Days Left:-160
|
15th FC UN-TIED (2022-23) |
|
114 |
8-06-23-24 |
Construction of CC Road from Simanta Elaka Molla Para to Dudkuri in vill-Mollapara under GP Bhatpara in P.S. Balurghat.-57730192 |
|
PABAN BASAK |
19/04/2023 |
₹1,584,313.00 |
23/05/2023 |
887/ZP |
Not started |
90
|
15th FC UN-TIED (22-23) |
|
115 |
8-05-23-24 |
Repair and Maintenance CC Road from Ashutosh Sarkar House towards Rahamat Ali via Wajuddin House at Sukdevpur in P.S. Gangarampur. |
|
PABAN BASAK |
19/04/2023 |
₹2,099,477.00 |
23/05/2023 |
886/ZP |
05/08/2023 |
90
Days Left:-173
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
116 |
8-04-2023 |
Repair and Maintenance CC Road from Gachihar Manthara towards Damina FP School in P.S. Gangarampur. |
|
PABAN BASAK |
19/04/2023 |
₹1,825,277.00 |
23/05/2023 |
885/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
117 |
8-02-23-24 |
Repair and Maintenance of Road from Kalitala to Rail Bridge via Kadighat in Belbari-I GP under Gangarampur PS. |
|
Kalyan Bose |
19/04/2324 |
₹3,694,622.00 |
23/05/2023 |
884/ZP |
14/07/2023 |
90
Days Left:-195
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
118 |
8-01-23-24 |
Repairing and Maintenance of Road from Tangapara to Jalalpur in Belbari-II GP under PS Gangarampur. |
|
Kalyan Bose |
19/04/2023 |
₹4,870,320.00 |
23/05/2023 |
883/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
119 |
7-15-23-24 |
Repairing of HiBh Mast & Minimast(Eledrical) Light in Bolla Mandir-Maligaon GP, Mahipal Bazar[1]Udaypur GP, Panishala Hat-Karanj GP, Kushmandi Chowrangi-Kushmandi GP, under Kushmandi BIocL Batun Bustand Kumarganj Block, Maharajpur Bus Stand Gangarampur Block.- 66878555 |
|
Nihar Ghosh |
18/04/2023 |
₹578,932.00 |
23/05/2023 |
882/ZP |
08/06/2023 |
60
Days Left:-261
|
15th FC Un-Tied Supplementary (20-21) |
|
120 |
7-12-23-24 |
Supply .and Installation of LED Sloar Street Light at Patiram, Uttat Raipur near Kasem Choudhury, Rampur Suhari near Samiruddin Sarkar and Fulbari ,Shibpur Block- Gangarampur, Tapan, Balurghat GP-Uday Patiram, Harsura Dist- Dakshin Dinajpur. |
|
Nihar Ghosh |
18/04/2023 |
₹506,462.00 |
23/05/2023 |
881/ZP |
30/05/2023 |
Scheme Completed: 24/07/2023 |
15th FC UN-TIED (22-23) |
|
121 |
7-11-23-24 |
Outdoor Electrification Work and Construction of AC Room of Sukanta Bhavan at Buniadpur, Dakshin Dinajpur. |
|
Nihar Ghosh |
18/04/2023 |
₹827,818.00 |
23/05/2023 |
880/ZP |
17/07/2023 |
Scheme Completed: 17/08/2023 |
NBDD |
|
122 |
7-10-23-24 |
Installation of LED Solar High Mast at BSP Club More in P.S. Gangarampur, GP-Belbari-I, Dakshin Dinajpur-68298813 |
|
Nihar Ghosh |
18/04/2023 |
₹506,897.00 |
23/05/2023 |
879/ZP |
01/06/2023 |
Scheme Completed: 06/08/2023 |
15th FC TIED (20-21) Supplementary |
|
123 |
7-09-23-24 |
Supply of Drinking Water by Providing Submersible Pump at Kaldighi Bat-tala near Mandir under Gangarampur PS-68298183 |
|
Kalyan Bose |
18/04/2023 |
₹194,901.00 |
23/05/2023 |
878/ZP |
Not started |
60
|
15th FC TIED (20-21) Supplementary |
|
124 |
7-08-23-24 |
Construction of Covered Drain from Selim Ahamed(blusoom school) towards PWD road, Jahangirpur in P.S. Gangarampur-58332964 |
|
PABAN BASAK |
18/04/2023 |
₹776,679.00 |
23/05/2023 |
877/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
125 |
7-07-23-24 |
Construction of CC Road from Fulbari Bus-Stand to Market road (internal) under Uday GP in P.S. Gangarampur-66878895 |
|
PABAN BASAK |
18/04/2023 |
₹874,039.00 |
23/05/2023 |
876/ZP |
20/07/2023 |
60
Days Left:-219
|
15th FC TIED(Supplementary -21-22) |
|
126 |
7-05-23-24 |
CC road from Kishori Roy House end towards Harish Roy House at Singforka under Sukdevpur GP in P.S. Gangarampur.-57575696 |
|
PABAN BASAK |
18/04/2023 |
₹485,423.00 |
23/05/2023 |
875/ZP |
Not started |
60
|
15th FC UN-TIED (2022-23) |
|
127 |
7-04-23-24 |
CC Road from Manasa Mandal More end towards Pathan Para FP School under Sukdevpur GP in P.S. Gangarampur.-57731586 |
|
PABAN BASAK |
18/04/2023 |
₹970,919.00 |
23/05/2023 |
874/ZP |
05/08/2023 |
60
Days Left:-203
|
15th FC UN-TIED (2022-23) |
|
128 |
7-03-23-24 |
Repair and maintenance of Road from BSP Club More to Protap Adhikari House in Belbari-I GP under Gangarampur PS. |
|
Kalyan Bose |
18/04/2023 |
₹478,048.00 |
23/05/2023 |
873/ZP |
22/09/2023 |
60
Days Left:-155
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
129 |
7-02-23-24 |
Repairing and Maintenance of Road from Pagol Sutradhar House to SSK School in Belbari-II GP under Gangarampur PS |
|
Kalyan Bose |
18/04/2023 |
₹794,541.00 |
23/05/2023 |
872/ZP |
29/05/2023 |
60
Days Left:-271
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
130 |
7-01-23-24 |
Repairing and Maintenance of Road from Bhatra Durgamandap to Danihar Village in Boalder GP under Balurghat PS. |
|
PABAN BASAK |
18/04/2023 |
₹537,586.00 |
23/05/2023 |
871/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
131 |
4-16-23-24 |
Installation of Mini Mast with LED Solar Street Light at Shibpur Madrasha(Bagdhara more) in P.S. Gangarampur, GP-Uday, Dist-Dakshin Dinajpur. |
|
Nihar Ghosh |
01/01/1970 |
₹506,896.00 |
11/05/2023 |
787/ZP |
25/07/2023 |
Scheme Completed: 06/10/2023 |
15th FC UN TIED (2022-23) |
|
132 |
4-15-23-24 |
Supply and Installation of LED Solar Street Light at Tapan School More Vill-Kasba in P.S. Tapan, Gp-Chandipur, Dist- Dakshin Dinajpur.-58041173 |
|
Nihar Ghosh |
10/04/2023 |
₹414,378.00 |
11/05/2023 |
786/ZP |
31/05/2023 |
Scheme Completed: 05/08/2023 |
15th FC UN TIED (2022-23) |
|
133 |
14-23-24 |
Supply and Installation of LED Solar Street Light at Math Pukur, Nakair Sova Miah House and near Masjit, Malancha Swasan Ghat and near Gobinda Pramanik house, Kamalpur Soleman Mondal House, Tasimot Sarkar House and Kamalpur FP School in P.S. Gangarampur & Tapan, GP-Uday & Hazrathpur, Dist- Dakshin Dinajpur.-58027118 |
|
Nihar Ghosh |
10/04/2023 |
₹414,378.00 |
11/05/2023 |
910/ZP |
30/05/2023 |
Scheme Completed: 25/07/2023 |
15th FC UN TIED (2022-23) |
|
134 |
09-23-24 |
Supply and Installation of LED Solar Street Light at Belbari-II GP Area different places in P.S.-Gangarampur, GP-Belbari, Dist- Dakshin Dinajpur-58046427 |
|
Nihar Ghosh |
10/04/2023 |
₹184,168.00 |
11/05/2023 |
784/ZP |
Not started |
60
|
15th FC UN TIED (2022-23) |
|
135 |
4-08-23-24 |
Supply and Installation of LED Solar Street Light at Sidlim Adibashi Para(Girja Ghar) in P.S.-Gangarampur, GP-Chaloon, Dist- Dakshin Dinajpur.-57853856 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
783/ZP |
Not started |
60
|
15th FC UN TIED (2022-23) |
|
136 |
4-07-23-24 |
Supply and Installation of LED Solar Street Light at Front Side of Deor High School in P.S. Kumarganj, GP-Deor, Dist- Dakshin Dinajpur.-57912118 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
782/ZP |
07/06/2023 |
Scheme Completed: 05/08/2023 |
15th FC UN TIED (2022-23) |
|
137 |
4-06-23-24 |
Supply and Installation of LED Solar Street Light at Front Side of Satipukur Hat in P.S. Kumarganj, GP-Deor, Dist- Dakshin Dinajpur.-57913140 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
781/ZP |
07/06/2023 |
Scheme Completed: 05/08/2023 |
15th FC UN TIED (2022-23) |
|
138 |
4-03-2023-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Bhupendranath Barman and Nabin Ch. Barman at Bolla Mouza, Bolla GP under Balurghat Block.-66436149 |
|
Nihar Ghosh |
10/04/2023 |
₹770,406.00 |
11/05/2023 |
780/ZP |
07/06/2023 |
60
Days Left:-262
|
15th FC UN TIED (2022-23) |
|
139 |
38-08-2022-23 |
Construction of CC Road from Sial Para Pakka Road to River Side new Mandir in P.S. Kumarganj-57579984 |
|
Somnath Kuiry |
19/01/2023 |
₹971,154.00 |
13/04/2023 |
596/ZP |
21/04/2023 |
Scheme Completed: 29/05/2023 |
15th FC UN-TIED (22-23) |
|
140 |
6-2-2023-24 |
Construction of BT Road from Muripukur(PMGY) to House of Makbul Tappo via House of Suka Master vill of Bandighi under Harsura GP in P.S. Tapan. L- 0.89 KM |
|
Somnath Kuiry |
28/04/2023 |
₹2,733,311.00 |
19/05/2023 |
850/ZP |
Not started |
60
|
RASTA SHREE 2023 |
|
141 |
6-1-2023-24 |
Construction of Metal Road from Ekhahar PMG to Nailakuri SSK under Uday GP in P.S. Gangarampur. L- 0.96 KM |
|
Kalyan Bose |
28/04/2023 |
₹3,659,258.00 |
19/05/2023 |
849/ZP |
Not started |
60
|
RASTA SHREE 2023 |
|
142 |
32-09-2022-23 |
Supply of Drinking Water by Providing Submersible Pump at Mohini Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392775 |
|
PABAN BASAK |
21/12/2022 |
₹182,936.00 |
15/02/2023 |
197/ZP |
23/04/2023 |
60
Days Left:-307
|
15th FC TIED 20-21 |
|
143 |
32-08-2022-23 |
Supply of Drinking Water by Providing Submersible Pump at Pandey Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392200 |
|
PABAN BASAK |
21/12/2022 |
₹182,936.00 |
15/02/2023 |
196/ZP |
23/04/2023 |
60
Days Left:-307
|
15th FC TIED (20-21) |
|
144 |
32-04-2022-3 |
Construction of Cc Road from Gamibari to Kuraldanga More under Mohana GP in P.S. Kumarganj.- 47445015 |
|
Somnath Kuiry |
21/12/2023 |
₹1,366,470.00 |
15/02/2023 |
195/ZP |
02/03/2023 |
Scheme Completed: 25/05/2023 |
15th FC UN TIED 21-22 |
|
145 |
03-23-2023-24 |
Repair and Maintenance of Hume Pipe at Joardar Para under Jahangirpur GP in P.S. Gangarampur. |
|
Kalyan Bose |
06/04/2023 |
₹990,470.00 |
10/05/2023 |
771/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
146 |
03-22-2023-24 |
Construction of CC Road from Bilondo Bati School More to Karbula High Madrasha - 57584697 |
|
Suhita Paul |
06/04/2023 |
₹971,154.00 |
10/05/2023 |
770/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
147 |
03-21-2023-24 |
Construction of CC Road from Somnath Baske House towards Biswajit Murmu House under Pundari GP in P.S. Harirampur.-57835930 |
|
Kalyan Bose |
06/04/2023 |
₹582,523.00 |
10/05/2023 |
769/ZP |
15/05/2023 |
60
Days Left:-285
|
15th FC UN-TIED (22-23) |
|
148 |
03-20-2023-24 |
Construction of CC road from Fajlu Rahaman House towards Baso Hembrom house under Pundari GP in P.S. Harirampur-57835039 |
|
Kalyan Bose |
06/04/2023 |
₹679,808.00 |
10/05/2023 |
768/ZP |
15/05/2023 |
60
Days Left:-285
|
15th FC UN-TIED (22-23) |
|
149 |
03-19-2023-24 |
Construction of Cc Road from House of Shymal Pahan towards House of Budhhaded Sahain vill-Hatisala under Danga GP in P.S. Balurghat-57730514 |
|
PABAN BASAK |
06/04/2023 |
₹682,332.00 |
10/05/2023 |
767/ZP |
31/05/2023 |
60
Days Left:-269
|
15th FC UN-TIED (22-23) |
|
150 |
03-18-2023-24 |
Instalation of solar based pump House for Minor Irrigation land of Babi Miah at mouja-Badsankar, Hasnagar G.P. under Tapan Block-66447178 |
|
Nihar Ghosh |
06/04/2023 |
₹770,406.00 |
10/05/2023 |
766/ZP |
20/07/2023 |
60
Days Left:-219
|
15th FC -TIED (22-23) |
|