| 601 |           
                  09-10-2021-22 |                   
                  Construction of CC Road from Telikuri PMGSY Road via Milghar(1st Phase) under Ellahabad GP in P.S. Banshihari |                                     
                   |   
                  Suhita Paul | 
                  08/02/2022 | 
                  ₹485,577.00 | 
                  06/05/2022 | 
                  408/ZP |         
                  30/06/2022 | 
                                      Scheme Completed: 28/03/2023 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 602 |           
                  03-07-2021-22 |                   
                  Construction of Covered Drain from Daulatpur Vim Roy House to Madan Laha’s House in P.S. Banshihari. |                                     
                   |   
                  Suhita Paul | 
                  01/01/1970 | 
                  ₹606,971.00 | 
                  12/03/2021 | 
                  512/ZP |         
                  25/12/2021 | 
                                      Scheme Completed: 25/02/2023 | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 603 |           
                  22-01-2022-23 |                   
                  Internal Electrification Work at the RTE Production & Supply unit in Kamarpara Operated by Nabachetana Sangha Bahumukhi Samabay Samiti Ltd., Balurghat , Dakshin DInajpur. |                                     
                   |   
                  Nihar Ghosh | 
                  09/09/2022 | 
                  ₹155,828.00 | 
                  06/12/2022 | 
                  1172/ZP |         
                  15/12/2022 | 
                                      Scheme Completed: 09/02/2023 | 
                                    
                  
                 
                  RTE | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 604 |           
                  23-15-2022-23 |                   
                  Construction of Public Samshan Ghat(Crematorium) beside Baul Khari in GP Bolla under Balurghat PS-47460841 |                                     
                   |   
                  PABAN BASAK | 
                  20/10/2022 | 
                  ₹990,196.00 | 
                  16/01/2023 | 
                  60/ZP |         
                  Not started | 
                                    60
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 2021-22 Un-Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 605 |           
                  23-14-2022-23 |                   
                  Internal Electrification Work of EVM Ware House(Three Storied) beside Minority Building at Balurghat District Collectorate Campus, Dakshin Dinajpur. |                                     
                   |   
                  Nihar Ghosh | 
                  20/10/2022 | 
                  ₹990,439.00 | 
                  16/01/2023 | 
                  59/ZP |         
                  Not started | 
                                    365
                  
                                    
                  
                   | 
                                    
                  
                 
                  EVM/VVPAT Warehouses Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 606 |           
                  23-12-2022-23 |                   
                  Supply of Safe Drinking Water by Installation of Solar Based Overhead Water Tank near Biharipara Mandir, Vill-Fatepur, GP-Jalghar under Balurghat P.S.-44811317 |                                     
                   |   
                  PABAN BASAK | 
                  20/10/2022 | 
                  ₹971,153.00 | 
                  16/01/2023 | 
                  58/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 2020-21 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 607 |           
                  23-09-2022-23 |                   
                  INTERNAL ELECTRICAL WORKS FOR  Block Public Health Unit (BPHU)   at Kumarganj RH |                                     
                   |   
                  Nihar Ghosh | 
                  20/10/2023 | 
                  ₹623,951.00 | 
                  16/01/2023 | 
                  57/ZP |         
                  Not started | 
                                    
                  
                                    
                  
                   | 
                                    
                  
                 
                  365 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 608 |           
                  23-08-2022-23 |                   
                  INTERNAL ELECTRICAL WORKS FOR  Block Public Health Unit (BPHU)   at Kushmandi RH |                                     
                   |   
                  Nihar Ghosh | 
                  20/10/2022 | 
                  ₹623,951.00 | 
                  16/01/2023 | 
                  56/ZP |         
                  Not started | 
                                    365
                  
                                    
                  
                   | 
                                    
                  
                 
                  XV-FC HG During the Year 2022-2023 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 609 |           
                  23-04-2022-23 |                   
                  Construction of covered drain from  Douyakuri Village to Moktar House in P.S. Banshihari |                                     
                   |   
                  Suhita Paul | 
                  20/10/2022 | 
                  ₹684,716.00 | 
                  16/01/2023 | 
                  55/ZP |         
                  20/02/2023 | 
                                      Scheme Completed: 11/05/2023 | 
                                    
                  
                 
                  15th FC 2021-2022 -tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 610 |           
                  23-03-2022-23 |                   
                  Construction of Covered Drain from Anup Sen House to Tower More under Boalder GP in P.S. Balurghat. |                                     
                   |   
                  PABAN BASAK | 
                  20/10/2022 | 
                  ₹396,078.00 | 
                  16/01/2023 | 
                  54/ZP |         
                  23/01/2023 | 
                                      Scheme Completed: 15/03/2023 | 
                                    
                  
                 
                  15th FC 2021-2022 -tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 611 |           
                  23-02-2022-23 |                   
                  Installation of LED Street Light(High Mast Tower) at in front of Adarsha Academy Pransagar, Chaloon GP in P.S. Gangarampur, Dist- Dakshin Dinajpur. |                                     
                   |   
                  Nihar Ghosh | 
                  20/10/2022 | 
                  ₹580,485.00 | 
                  16/01/2023 | 
                  53/ZP |         
                  02/02/2023 | 
                                      Scheme Completed: 27/03/2023 | 
                                    
                  
                 
                  15th FC 2021-2022 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 612 |           
                  23-01-2022-23 |                   
                  Installation of LED Solar Street Light(i) infront of Saprondighi Bazar, Basuria GP(ii) Panjul Hatkhola, Panjul GP (iii) in front of Maharajpur Bazar, Belbari-II GP(iv) Profulla Roy House Nadipar, Belbari –I GP |                                     
                   |   
                  Nihar Ghosh | 
                  20/10/2022 | 
                  ₹349,607.00 | 
                  16/01/2023 | 
                  52/ZP |         
                  28/01/2023 | 
                                      Scheme Completed: 08/02/2023 | 
                                    
                  
                 
                  15th FC 2021-2022 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 613 |           
                  20-03-2022-23 |                   
                  CC road from Dipak Halder House towards Rahaman(Raman) Dighi Jalalpur under Belbari-II Gp in P.S. Gangarampur.-47439056 |                                     
                   |   
                  Kalyan Bose | 
                  30/08/2022 | 
                  ₹485,576.00 | 
                  16/01/2023 | 
                  61/ZP |         
                  27/03/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC untied 21-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 614 |           
                  23-05-2022-23 |                   
                  Internal Electrification work Northern Side of 2nd floor of DRDC building (District Traffic Office) under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur(Electrical Work) |                                     
                   |   
                  Nihar Ghosh | 
                  20/10/2022 | 
                  ₹187,624.00 | 
                  11/01/2023 | 
                  44/ZP |         
                  14/01/2023 | 
                                      Scheme Completed: 12/05/2023 | 
                                    
                  
                 
                  Own | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 615 |           
                  21-09-2022-23 |                   
                  Construction of Waiting Shed at Pandeyparea under Belbari-IGP in P.S. Gangarampur.-47460419 |                                     
                   |   
                  Kalyan Bose | 
                  30/08/2022 | 
                  ₹291,693.00 | 
                  12/12/2022 | 
                  1222/ZP |         
                  10/01/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC  Un-TIED  2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 616 |           
                  21-06-2022-23 |                   
                  Construction of Covered Drain from Kader Miah House towards Osman Miah House, Sidlim under Chaloon GP in P.S. Gangarampur.-47400171 |                                     
                   |   
                  Kalyan Bose | 
                  30/08/2022 | 
                  ₹291,202.00 | 
                  12/12/2022 | 
                  1220/ZP |         
                  02/03/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 617 |           
                  21-05-2022-23 |                   
                  Construction of Covered Drain from Najrul Islam Land towards Eidgha Mat, Jachi under Chaloon GP in P.S. Gangarampur.-47400077 |                                     
                   |   
                  Kalyan Bose | 
                  30/08/2022 | 
                  ₹291,202.00 | 
                  12/12/2022 | 
                  1219/ZP |         
                  25/01/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 618 |           
                  20-07-2022-23 |                   
                  Construction of Covered Drain from Rama Majumder House to Bikash Chakraborty House at Dharanda Village of Hili GP in Hili Panchayat Samity-52228418 |                                     
                   |   
                  PABAN BASAK | 
                  30/08/2022 | 
                  ₹2,913,462.00 | 
                  12/12/2022 | 
                  1218/ZP |         
                  02/03/2023 | 
                                    120
                  
                                     
                    Days Left:-858
                                    
                  
                   | 
                                    
                  
                 
                  15th FC TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 619 |           
                  20-06-2022-23 |                   
                  Construction of Covered Drain from Juran Sarkar House to Uppal Ghode House under Mahabari GP in P.S. Banshihari.-47403074 |                                     
                   |   
                  Suhita Paul | 
                  30/08/2022 | 
                  ₹582,524.00 | 
                  12/12/2022 | 
                  1217/ZP |         
                  03/03/2023 | 
                                      Scheme Completed: 11/08/2023 | 
                                    
                  
                 
                  15th FC TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 620 |           
                  20-05-2022-23 |                   
                  Construction of Covered Drain from Samsia FP School School to Anisur Rahaman’s via Lutfar Rahaman’s House in P.S. Kushmandi-47401861 |                                     
                   |   
                  Suhita Paul | 
                  30/08/2022 | 
                  ₹2,913,462.00 | 
                  12/12/2022 | 
                  1216/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 621 |           
                  20-04-2022-23 |                   
                  Construction of Covered Drain from Muradpur village to Pucca Road under Mahabari GP in P.S. Banshihari.-47402168 |                                     
                   |   
                  Suhita Paul | 
                  30/08/2022 | 
                  ₹582,524.00 | 
                  12/12/2022 | 
                  1215/ZP |         
                  Not started | 
                                    90
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 622 |           
                  20-02-2022-23 |                   
                  Construction of CC Road from Apan Roy towards Banu Miah Land under Jahangirpur GP in P.S. Gangarampur-47437966 |                                     
                   |   
                  Kalyan Bose | 
                  30/08/2022 | 
                  ₹485,569.00 | 
                  12/12/2022 | 
                  1214/ZP |         
                  22/01/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 623 |           
                  20-01-2022 |                   
                  Construction of CC Road from Anarul Miya House towards Abeskuri PMGSY road via Debnath Para, Belestholi under Basuria GP in P.S. Gangarampur-47406388 |                                     
                   |   
                  Kalyan Bose | 
                  30/08/2022 | 
                  ₹971,139.00 | 
                  12/12/2022 | 
                  1213/ZP |         
                  27/01/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 624 |           
                  19-13-2022-23 |                   
                  Construction of CC Road from Guljar Miya House to Ainal Miya House, Chalunda under Uday GP in P.S. Gangarampur-47406185 |                                     
                   |   
                  Kalyan Bose | 
                  24/08/2022 | 
                  ₹485,605.00 | 
                  06/12/2022 | 
                  1184/ZP |         
                  12/12/2022 | 
                                    90
                  
                                     
                    Days Left:-968
                                    
                  
                   | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 625 |           
                  19-11-2022-23 |                   
                  CC Road from Adibashipara Nirmal House towards Chotokum, Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406752 |                                     
                   |   
                  Kalyan Bose | 
                  24/08/2022 | 
                  ₹485,549.00 | 
                  06/12/2022 | 
                  1183/ZP |         
                  12/12/2022 | 
                                    90
                  
                                     
                    Days Left:-968
                                    
                  
                   | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 626 |           
                  19-10-2022-23 |                   
                  CC Road from Rahaman Ali House towards Hasan Ali House(land), Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406834 |                                     
                   |   
                  Kalyan Bose | 
                  24/08/2022 | 
                  ₹485,549.00 | 
                  06/12/2022 | 
                  1182/ZP |         
                  12/12/2022 | 
                                    90
                  
                                     
                    Days Left:-968
                                    
                  
                   | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 627 |           
                  19-09-2022-23 |                   
                  Construction of CC Road from PMGSY road to Srirampur(Fajilpur) Baro Masjit Club in P.S. Banshihari.-47447919 |                                     
                   |   
                  Suhita Paul | 
                  24/08/2022 | 
                  ₹1,165,369.00 | 
                  06/12/2022 | 
                  1181/ZP |         
                  04/01/2023 | 
                                      Scheme Completed: 25/03/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 628 |           
                  19-08-2022-23 |                   
                  CC Road repairing from Ashokgram Bazar towards Garoya House under Ashokgram GP in P.S. Gangarampur-47405988 |                                     
                   |   
                  Kalyan Bose | 
                  01/01/1970 | 
                  ₹485,575.00 | 
                  06/12/2022 | 
                  1180/ZP |         
                  12/12/2022 | 
                                    90
                  
                                     
                    Days Left:-968
                                    
                  
                   | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 629 |           
                  19-07-2022-23 |                   
                  Construction of CC Road from Binod Roy House towards Paikepara FP School in vill-Dasul under Nazirpur ZP in P.S. Balurghat.-47448678 |                                     
                   |   
                  PABAN BASAK | 
                  24/08/2022 | 
                  ₹1,188,235.00 | 
                  06/12/2022 | 
                  1179/ZP |         
                  10/03/2023 | 
                                      Scheme Completed: 10/05/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 630 |           
                  19-06-2022-23 |                   
                  Construction of CC Road from Purba Para Aptar Haripukur Sahin Mission to Rabiul House via Ataur Mondal House in P.S. Hili.-47443474 |                                     
                   |   
                  Somnath Kuiry | 
                  24/08/2022 | 
                  ₹776,923.00 | 
                  06/12/2022 | 
                  1178/ZP |         
                  Not started | 
                                    90
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 631 |           
                  19-05-2022-23 |                   
                  Construction of CC Road from Barampur Pur5ba Para to Moksed Ali via Dighi Para in P.S. Tapan.-47441544  |                                     
                   |   
                  Somnath Kuiry | 
                  24/08/2022 | 
                  ₹388,462.00 | 
                  06/12/2022 | 
                  1177/ZP |         
                  05/02/2023 | 
                                      Scheme Completed: 22/03/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 632 |           
                  19-04-2022-23 |                   
                  Construction of CC Road from Barampur FP School towards South Haritala in P.S. Tapan.-47441355 |                                     
                   |   
                  Somnath Kuiry | 
                  24/08/2022 | 
                  ₹388,462.00 | 
                  06/12/2022 | 
                  1176/ZP |         
                  05/02/2023 | 
                                      Scheme Completed: 23/03/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 633 |           
                  19-03-2022-23 |                   
                  Construction of CC Road from Patbanial towards Pacca Road in P.S. Tapan.-47442102  |                                     
                   |   
                  Somnath Kuiry | 
                  24/08/2022 | 
                  ₹1,165,385.00 | 
                  06/12/2022 | 
                  1175/ZP |         
                  07/02/2023 | 
                                      Scheme Completed: 10/05/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 634 |           
                  19-02-2022-23 |                   
                  Construction of CC Road from Abul Hossain House towards PMGSY road in P.S. Tapan.-47446085 |                                     
                   |   
                  Somnath Kuiry | 
                  24/08/2022 | 
                  ₹2,427,885.00 | 
                  06/12/2022 | 
                  1174/ZP |         
                  01/02/2023 | 
                                      Scheme Completed: 21/03/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 635 |           
                  19-01-2022-23 |                   
                  Construction of Cc Road from Sihol PWD Road to Mangal House via High School in P.S. Banshihari.-47447617 |                                     
                   |   
                  Suhita Paul | 
                  24/08/2022 | 
                  ₹1,165,265.00 | 
                  06/12/2022 | 
                  1173/ZP |         
                  27/01/2023 | 
                                      Scheme Completed: 17/03/2023 | 
                                    
                  
                 
                  15th FC UN-TIED 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 636 |           
                  18-03-2022-23 |                   
                  Construction of EVM Ware house(Three Storied) behind SDO Gangarampur Office Building at Buniadpur, Dakshin Dinajpur, JL No-255, Plot No- 584, Mouza-Barail. |                                     
                   |   
                  Kalyan Bose | 
                  18/08/2022 | 
                  ₹11,744,679.00 | 
                  04/11/2022 | 
                  1085/ZP |         
                  10/12/2022 | 
                                    360
                  
                                     
                    Days Left:-700
                                    
                  
                   | 
                                    
                  
                 
                  EVM/ Election  | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 637 |           
                  17-08-2022-23 |                   
                  Repairing of Building (Ground Floor Repair and construction of rest part of roofat 1st floor) of Mahipal ZP Market Complex at Kushmandi.-44813810 |                                     
                   |   
                  Suhita Paul | 
                  17/08/2022 | 
                  ₹679,808.00 | 
                  04/11/2022 | 
                  1084/ZP |         
                  27/03/2023 | 
                                      Scheme Completed: 22/08/2023 | 
                                    
                  
                 
                  15th FC Un-Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 638 |           
                  17-07-2022-23 |                   
                  Construction of Waiting Shed at Mahinipara Sashan under Belbari-I GP in P.S. Gangarampur.-44813849 |                                     
                   |   
                  Kalyan Bose | 
                  17/08/2022 | 
                  ₹291,693.00 | 
                  04/11/2022 | 
                  1083/ZP |         
                  10/01/2023 | 
                                      Scheme Completed: 12/06/2023 | 
                                    
                  
                 
                  15th FC Un-Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 639 |           
                  17-06-2022 |                   
                  Construction of Waiting Shed at Nayabazar in P.S. Gangarampur- 44813859 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹291,693.00 | 
                  04/11/2022 | 
                  1082/ZP |         
                  11/02/2023 | 
                                      Scheme Completed: 02/09/2024 | 
                                    
                  
                 
                  15th FC Un-Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 640 |           
                  17-04-2022-23 |                   
                  Construction of Community Toilet at beside MSK School, Vill-Jamalpur in P.S. Hili- 44811593 |                                     
                   |   
                  Somnath Kuiry | 
                  17/08/2022 | 
                  ₹971,154.00 | 
                  04/11/2022 | 
                  1081/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 641 |           
                  17-03-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Kharail Bazar, Vill-Kharail GP-Deor under Kumarganj PS.-44807447 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1080/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 642 |           
                  17-02-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at front side of Chandganj Library, Vill-Chandganj GP-Safanagar under Kumarganj PS.-44811165 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1079/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 643 |           
                  17-01-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Kumarganj College, Vill-Puntair GP-Bhor under Kumarganj PS.-44811125 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1078/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 644 |           
                  16-10-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Front Side of the H/O Rouf Mondal, Vill-Kasurail, GP-Ramkrishnapur under Kumarganj PS.-44807556 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1077/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 645 |           
                  16-09-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Front Side of Rajua Kali Mandir, Vill-Rajua, GP-Boaldar under Balurghat PS.-44807036 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1076/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 646 |           
                  16-08-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Front Side of Kashilabati Masjid, Vill-Kashilabati, GP-Jalghar under Balurghat PS.-44807030 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1075/ZP |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 647 |           
                  16-07-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Front Side of Baharipara Temple, Vill-Fatepur, GP-Jalghar under Balurghat PS.-44806938 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1074/zp |         
                  Not started | 
                                    180
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 648 |           
                  16-06-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Front Side of Ramkisku House, Vill-Belain, GP-Jalghar under Balurghat PS.-44804726 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹543,846.00 | 
                  04/11/2022 | 
                  1073/ZP |         
                  13/12/2022 | 
                                      Scheme Completed: 02/09/2024 | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 649 |           
                  16-05-2022-23 |                   
                  Supply of Safe Drinking Water by Providing Water ATM at Front Side of Puratan Gangarampur High School, Vill-Gangarampur, GP-Gangarampur under Gangarampur PS.-47383702 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹534,135.00 | 
                  04/11/2022 | 
                  1072/zp |         
                  01/01/2023 | 
                                      Scheme Completed: 02/09/2024 | 
                                    
                  
                 
                  15th FC Tied 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 650 |           
                  16-04-2022-23 |                   
                  Installation of Water Purification System at rasidpur Hospital in P.S. banshihari- 56430905 |                                     
                   |   
                  Suhita Paul | 
                  17/08/2022 | 
                  ₹544,217.00 | 
                  04/11/2022 | 
                  1071/ZP |         
                  04/01/2023 | 
                                      Scheme Completed: 27/07/2023 | 
                                    
                  
                 
                  15th FC 20-21 Savings | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 651 |           
                  16-02-2022-23 |                   
                  Installation of Water PurifireMachine(Water ATM) at Baidya Tigga’s House(Tinmatha more), Vill- Raguhanbati, GP-Damdama under Gangarampur P.S.-55734841 |                                     
                   |   
                  PABAN BASAK | 
                  17/08/2022 | 
                  ₹534,135.00 | 
                  04/11/2022 | 
                  1070/ ZP |         
                  01/01/2023 | 
                                      Scheme Completed: 28/01/2024 | 
                                    
                  
                 
                  15th FC 20-21 Savings | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 652 |           
                  15-02-2022 |                   
                  Construction of  Block Public Health Unit (BPHU) at Kumarganj RH |                                     
                   |   
                  Somnath Kuiry | 
                  12/08/2022 | 
                  ₹4,808,947.00 | 
                  21/10/2022 | 
                  1056/ZP |         
                  Not started | 
                                    365
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC HG 22-23 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 653 |           
                  15-01-2022-23 |                   
                  Construction of  Block Public Health Unit (BPHU)   at Kushmandi RH |                                     
                   |   
                  Suhita Paul | 
                  12/08/2022 | 
                  ₹4,808,947.00 | 
                  21/10/2022 | 
                  1055/ZP |         
                  Not started | 
                                    365
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC HG 22-23 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 654 |           
                  12-07-2022 |                   
                  Installation of LED Street Light(High Mast Tower) at Hazratpur Madrasa Field, Hazratpur GP  in P.S. Tapan, Dist- Dakshin Dinajpur |                                     
                   |   
                  Nihar Ghosh | 
                  25/07/2022 | 
                  ₹580,485.00 | 
                  06/12/2022 | 
                  1171/ZP |         
                  25/01/2023 | 
                                      Scheme Completed: 27/03/2023 | 
                                    
                  
                 
                  15th FC Un -Tide 20-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 655 |           
                  12-04-2022-23 |                   
                  Construction of Covered Drain from Kushmandi Jut Godown towards Samsia Khari in P.S. Kushmandi. |                                     
                   |   
                  Suhita Paul | 
                  25/07/2022 | 
                  ₹971,153.00 | 
                  12/06/2022 | 
                  1170/ZP |         
                  18/01/2023 | 
                                      Scheme Completed: 30/03/2023 | 
                                    
                  
                 
                  15th FC Tide 21-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 656 |           
                  11-07-2022-23 |                   
                  Construction of Covered Drain from DNT More towards Adibashipara in P.S. Tapan. |                                     
                   |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹971,154.00 | 
                  12/06/2022 | 
                  1169/ZP |         
                  31/01/2023 | 
                                      Scheme Completed: 09/05/2023 | 
                                    
                  
                 
                  15th FC Tied 21-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 657 |           
                  11-06-2022-23 |                   
                  Installation of LED Street Light(High Mast Tower) at Dipkhanda FP School , Dipkhanda GP in P.S. Tapan, Dist- Dakshin Dinajpur |                                     
                   |   
                  Nihar Ghosh | 
                  25/07/2022 | 
                  ₹580,485.00 | 
                  12/06/2022 | 
                  1168/ZP |         
                  25/01/2023 | 
                                      Scheme Completed: 28/03/2023 | 
                                    
                  
                 
                  15th FC Un-Tied 21-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 658 |           
                  07-15-2020-21 |                   
                  Repair of road from Patharghata SBI towards Swasthyakendra via Burning Ghat under Mahabari GP in P.S. Banshihari |                                     
                   |   
                  Suhita Paul | 
                  06/10/2020 | 
                  ₹4,367,380.00 | 
                  24/02/2021 | 
                  408/Engg/ZP |         
                  27/02/2021 | 
                                      Scheme Completed: 08/08/2023 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Road other than BGSY during 2020-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 659 |           
                  27-02-2020-21 |                   
                  Supply of safe drinking water by providing water ATM at Udaypur, GP - Udaypur under Kushmandi P.S. |                                     
                   |   
                  Suhita Paul | 
                  18/02/2021 | 
                  ₹543,846.00 | 
                  24/08/2021 | 
                  228/Engg/ZP |         
                  27/04/2022 | 
                                    45
                  
                                     
                    Days Left:-1242
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 660 |           
                  03-06-2021-22 |                   
                  Construction of covered drain from Mahammadpur Disharikura pond to Faigar Choudhuri house in P.S. Banshihari |                                     
                   |   
                  Suhita Paul | 
                  24/09/2021 | 
                  ₹582,692.00 | 
                  03/12/2021 | 
                  511/ZP |         
                  26/11/2022 | 
                                      Scheme Completed: 02/02/2023 | 
                                    
                  
                 
                  15th FC Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 661 |           
                  21-12-2020-21 |                   
                  Supply of Solar Based Over Head Running Drinking Water Near H/O Ramkisku, Vill-Beline, GP-Chakvrigu under P.S. Balurghat (Fund : 15th FC Tied) (ID - 44811304) |                                     
                  K Bhattacharjee |   
                  Kalyan Bose | 
                  05/02/2021 | 
                  ₹971,154.00 | 
                  25/02/2021 | 
                  411/Engg/ZP |         
                  28/03/2021 | 
                                      Scheme Completed: 02/11/2022 | 
                                    
                  
                 
                  15th FC Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 662 |           
                  13-09-2022-23 |                   
                  Drinking Water facility at Bhentara More by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Gangarampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1054/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 663 |           
                  13-08-2022-23 |                   
                  Drinking Water facility at Bhadrail Hatkhola by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Tapan. |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1053/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 664 |           
                  13-07-2022-23 |                   
                  Drinking Water facility at Katabari High School by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Kushmandi. |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1052/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 665 |           
                  13-06-2022-23 |                   
                  Drinking Water facility at Jakirpur High School, by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Kumarganj. |                                     
                  Rana Ray |   
                  PABAN BASAK | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1051/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 666 |           
                  13-05-2022-23 |                   
                  Drinking Water facility at Market, Udaypur by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Kushmandi. |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1050/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 667 |           
                  13-04-2022-23 |                   
                  Drinking Water facility at Balupara Fatepur High School by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Hili |                                     
                  Rana Ray |   
                  Somnath Kuiry | 
                  10/08/2022 | 
                  ₹971,154.00 | 
                  21/10/2022 | 
                  1049/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 668 |           
                  13-03-2022-23 |                   
                  Drinking Water facility at Jalghar Bazar by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Tapan. |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1048/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 669 |           
                  13-02-2022-23 |                   
                  Drinking Water facility at Sarbamangala High School, Basuria by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S.  Gangarampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  10/08/2022 | 
                  ₹971,153.00 | 
                  21/10/2022 | 
                  1047/ZP |         
                  Not started | 
                                    120
                  
                                    
                  
                   | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 670 |           
                  12-05-2022-23 |                   
                  Construction of Covered Drain from Fulbari Bus-stand towards Dholu Kabiraj house (both side) under Uday GP in PS Gangarampur (ID 47405275) |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  25/07/2022 | 
                  ₹2,717,962.00 | 
                  21/10/2022 | 
                  1046/ZP |         
                  06/05/2023 | 
                                    75
                  
                                     
                    Days Left:-838
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 671 |           
                  12-03-2022-23 |                   
                  Construction of Cover Drain from Kashimaddin Sarkar House to Saidur Rahaman House in P.S. banshihari (ID 47400955) |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  25/07/2022 | 
                  ₹1,235,404.00 | 
                  21/10/2022 | 
                  1045/ZP |         
                  06/02/2023 | 
                                      Scheme Completed: 02/05/2023 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 672 |           
                  12-02-2022-23 |                   
                  Construction of covered drain from Hatanpara village to PMGSY Road in P.S. Banshihari (ID 47402807) |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  25/07/2022 | 
                  ₹586,086.00 | 
                  21/10/2022 | 
                  1044/ZP |         
                  20/01/2023 | 
                                      Scheme Completed: 25/03/2023 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 673 |           
                  11-12-2022-23 |                   
                  Construction of Covered Drain infront of Sitahar Bazar under Bhour GP in P.S. Kumarganj. (ID 52229125) |                                     
                  Rana Ray |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹1,188,235.00 | 
                  21/10/2022 | 
                  1043/ZP |         
                  05/01/2023 | 
                                      Scheme Completed: 24/03/2023 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 674 |           
                  11-11-2022-23 |                   
                  Construction of Covered Drain from Pachipukur to Ichamoti River under Jakirpur GP in P.S. Kumarganj. (ID 47401686) |                                     
                  Rana Ray |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹1,980,392.00 | 
                  21/10/2022 | 
                  1042/ZP |         
                  24/11/2022 | 
                                      Scheme Completed: 30/05/2023 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 675 |           
                  11-09-2022-23 |                   
                  Construction of Covered Drain from Kamarpara Hat under Amritakhanda GP in P.S. Balurghat. (ID 47404982) |                                     
                  Rana Ray |   
                  PABAN BASAK | 
                  25/07/2022 | 
                  ₹1,485,294.00 | 
                  21/10/2022 | 
                  1041/ZP |         
                  25/11/2022 | 
                                      Scheme Completed: 28/01/2024 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 676 |           
                  11-08-2022-23 |                   
                  Construction of Covered Drain from Tapan RSP Parti Office towards Electric Office in P.S. Tapan. (ID 47405410) |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹2,202,577.00 | 
                  21/10/2022 | 
                  1040/ZP |         
                  06/01/2023 | 
                                      Scheme Completed: 13/10/2023 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 677 |           
                  11-03-2022-23 |                   
                  Construction of CC Road from Baghati Pacca Road via Molla Pukur towards Dinesh Orawn House in P.S. Tapan (ID 47452271) |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹776,923.00 | 
                  21/10/2022 | 
                  1039/ZP |         
                  22/12/2022 | 
                                      Scheme Completed: 21/02/2023 | 
                                    
                  
                 
                  15th FC 21-22 Un-Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 678 |           
                  11-02-2022-23 |                   
                  Construction of CC Road from Ranjit Das House towards Khudibagan in P.S. Tapan (ID 47441909) |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹388,462.00 | 
                  21/10/2022 | 
                  1038/ZP |         
                  24/11/2022 | 
                                      Scheme Completed: 05/02/2023 | 
                                    
                  
                 
                  15th FC 21-22 Un-Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 679 |           
                  11-01-2022-23 |                   
                  Construction of CC Road from Talpukur towards Saijudding Mondal in P.S. Tapan. |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  25/07/2022 | 
                  ₹776,923.00 | 
                  21/10/2022 | 
                  1037/ZP |         
                  09/12/2022 | 
                                      Scheme Completed: 05/02/2023 | 
                                    
                  
                 
                  15th FC 20-21 Savings | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 680 |           
                  01-06-2022-23 |                   
                  Construction of CC Road from Dangapara road to Ranipur PMGSY via Ekdala in PS Kushmandi |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  20/04/2022 | 
                  ₹582,692.00 | 
                  09/09/2022 | 
                  937/ZP |         
                  05/12/2022 | 
                                      Scheme Completed: 25/02/2023 | 
                                    
                  
                 
                  15th FC 20-21 Un Tied Savings | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 681 |           
                  04-12-2022-23 |                   
                  Construction of Covered Drain from Kushmandi Ganesh Jha house towards Uttam Roy’s House in P.S. Kushmandi. |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  20/04/2022 | 
                  ₹874,039.00 | 
                  13/09/2022 | 
                  949/ZP |         
                  10/03/2023 | 
                                      Scheme Completed: 18/05/2023 | 
                                    
                  
                 
                  15th FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 682 |           
                  02-10-2022-23 |                   
                  Construction of CC with Piling from Kalaiadanga More to Mamtaj Miya house under Safanagar GP in PS Kumarganj |                                     
                  Rana Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹1,485,294.00 | 
                  09/09/2022 | 
                  939/ZP |         
                  20/10/2022 | 
                                      Scheme Completed: 20/01/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 683 |           
                  02-09-2022-23 |                   
                  Construction of CC Road from Sanjoy Das Mudi Khana Shop to Uttam Joarder House under Patiram GP in PS Balurghat |                                     
                  Rana Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹1,386,275.00 | 
                  09/09/2022 | 
                  938/ZP |         
                  20/10/2022 | 
                                      Scheme Completed: 13/02/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 684 |           
                  03-05-2022-23 |                   
                  Construction of CC Road from Gour Nandi house to Ansar Ali house under Bagichapur GP in PS Harirampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹390,150.00 | 
                  14/09/2022 | 
                  956/ZP |         
                  22/10/2022 | 
                                    60
                  
                                     
                    Days Left:-1049
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 685 |           
                  01-05-2022-23 |                   
                  Construction of CC Road from Battoki Gram Gola Bhabder towards Aampara, Malipara under Sayedpur GP in PS Harirampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹678,810.00 | 
                  09/09/2022 | 
                  936/ZP |         
                  22/10/2022 | 
                                    75
                  
                                     
                    Days Left:-1034
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied  | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 686 |           
                  05-08-2022 |                   
                  Construction of Covered Drain from Harirampur Milon Debnath Dokan towards Thana more under Bagichapur GP in PS Harirampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹1,456,061.00 | 
                  13/09/2022 | 
                  950/ZP |         
                  21/10/2022 | 
                                    60
                  
                                     
                    Days Left:-1050
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 687 |           
                  02-11-2022-23 |                   
                  Construction of CC Road from Chandipur High School to Pathaltal under Sayedpur GP in PS Harirampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹1,165,243.00 | 
                  09/09/2022 | 
                  940/ZP |         
                  21/10/2022 | 
                                    60
                  
                                     
                    Days Left:-1050
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 688 |           
                  09-04-2022-23 |                   
                  Estimate for SITC of Cubical Panel Board & 01 No. AC Machine of AEO Bunglow under DDZP |                                     
                  Jaydip Ray |   
                  Nihar Ghosh | 
                  27/05/2022 | 
                  ₹106,395.00 | 
                  08/07/2022 | 
                  680/ZP |         
                  11/07/2022 | 
                                      Scheme Completed: 27/01/2023 | 
                                    
                  
                 
                  Own Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 689 |           
                  09-03-2022-23 |                   
                  Internal Electrification Work of AEO Bunglow under DDZP(1st Phase-1st Floor & Out Door). |                                     
                  Jaydip Ray |   
                  Nihar Ghosh | 
                  27/05/2022 | 
                  ₹459,053.00 | 
                  08/07/2022 | 
                  679/ZP |         
                  11/07/2022 | 
                                      Scheme Completed: 27/01/2023 | 
                                    
                  
                 
                  Own Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 690 |           
                  09-02-2022-23 |                   
                  Construction of Boundary Wall & Land Development at AEO Bunglow of DDZP in P.S. Balurghat. |                                     
                  Jaydip Ray |   
                  PABAN BASAK | 
                  27/05/2022 | 
                  ₹162,995.00 | 
                  08/07/2022 | 
                  678/ZP |         
                  02/11/2022 | 
                                      Scheme Completed: 23/03/2023 | 
                                    
                  
                 
                  Own Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 691 |           
                  09-01-2022-23 |                   
                  Renovation of 2nd Floor of AEO Bunglow(2 Bed Room + attach Toilet+ Common Toilet + Kitchen) of DDZP in P.S. Balurghat |                                     
                  Jaydip Ray |   
                  PABAN BASAK | 
                  27/05/2022 | 
                  ₹164,226.00 | 
                  08/07/2022 | 
                  677/ZP |         
                  02/11/2022 | 
                                      Scheme Completed: 23/03/2023 | 
                                    
                  
                 
                  Own Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 692 |           
                  08-01-2022-23 |                   
                  Rectification of Damaged approach road of Gangarampur Govt. Polytechnic in P.S. Gangarampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  25/05/2022 | 
                  ₹99,747.00 | 
                  08/07/2022 | 
                  676/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 24/11/2022 | 
                                    
                  
                 
                  Own Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 693 |           
                  07-04-2022-23 |                   
                  Construction of Traffic Kiosk Building(Ground Floor) at Rampur, Dakshin Dinajpur |                                     
                  Jaydip Ray |   
                  Somnath Kuiry | 
                  25/05/2022 | 
                  ₹971,090.00 | 
                  05/07/2022 | 
                  654/ZP |         
                  29/11/2022 | 
                                    90
                  
                                     
                    Days Left:-981
                                    
                  
                   | 
                                    
                  
                 
                  Road Safety Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 694 |           
                  07-03-2022-23 |                   
                  Construction of Traffic Kiosk Building(Ground Floor) at Selimmabad, PS- Banshihari P.O- Buniadpur. |                                     
                  Jaydip Ray |   
                  Liton Sarkar | 
                  25/05/2022 | 
                  ₹971,124.00 | 
                  05/07/2022 | 
                  653/ZP |         
                  Not started | 
                                    90
                  
                                    
                  
                   | 
                                    
                  
                 
                  Road Safety Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 695 |           
                  07-01-2022-23 |                   
                  Repairing and maintenance of Zilla Parishad Building near Sukanta Bhaban at Buniadpur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  25/05/2022 | 
                  ₹605,173.00 | 
                  06/07/2022 | 
                  657/ZP |         
                  08/08/2022 | 
                                    90
                  
                                     
                    Days Left:-1094
                                    
                  
                   | 
                                    
                  
                 
                  Own Fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 696 |           
                  17-08-2019-2020 |                   
                  Construction of Water Purified plant for drinking water facility at Matais Bazar under Hili PS |                                     
                   |   
                  Somnath Kuiry | 
                  18/03/2020 | 
                  ₹485,777.00 | 
                  28/04/2020 | 
                  98/Engg/ZP |         
                  24/08/2022 | 
                                      Scheme Completed: 01/12/2023 | 
                                    
                  
                 
                  BADP | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 697 |           
                  06-05-2022-23 |                   
                  Construction of CC Road from Ekdala towards Ranipur(balance portion) in P.S. Kushmandi. |                                     
                  J. Ray |   
                  Suhita Paul | 
                  06/05/2022 | 
                  ₹1,122,235.00 | 
                  27/07/2022 | 
                  795/ZP |         
                  01/09/2022 | 
                                      Scheme Completed: 05/01/2023 | 
                                    
                  
                 
                  Repair Maintenance of rural road | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 698 |           
                  06-03-2022-23 |                   
                  Construction of CC Road from Jashor Main road towards Akhil Roy’s House(1st phase) under Mahabari GP in P.S. Banshihari. |                                     
                  J. Ray |   
                  Suhita Paul | 
                  06/05/2022 | 
                  ₹485,577.00 | 
                  27/07/2022 | 
                  794/ZP |         
                  14/11/2022 | 
                                      Scheme Completed: 24/01/2023 | 
                                    
                  
                 
                  Repair Maintenance of rural road | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 699 |           
                  06-02-2022-23 |                   
                  Construction of CC Road from Jugal Roy House towards Shiv Mandir in P.S. Tapan |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  06/05/2022 | 
                  ₹485,577.00 | 
                  27/07/2022 | 
                  793/ZP |         
                  26/08/2022 | 
                                      Scheme Completed: 03/02/2023 | 
                                    
                  
                 
                  Repair Maintenance of rural road | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 700 |           
                  06-01-2022-23 |                   
                  Construction of CC Road from Jhantu House towards Ancer Ali Poltri Farm in P.S. Tapan |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  06/05/2022 | 
                  ₹485,577.00 | 
                  27/07/2022 | 
                  792/ZP |         
                  06/01/2023 | 
                                      Scheme Completed: 13/07/2023 | 
                                    
                  
                 
                  Repair Maintenance of rural road | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 701 |           
                  05-10-2022 |                   
                  Repair of Northern Portion of DRDC building (2nd floor only) for District Traffic Office under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur(Civil Work) |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹405,231.00 | 
                  27/07/2022 | 
                  791/ZP |         
                  16/08/2022 | 
                                      Scheme Completed: 28/01/2024 | 
                                    
                  
                 
                  OWN | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 702 |           
                  05-09-2022-23 |                   
                  Construction of Cover Drain from Barogachi Gicha Khan to Lasar Hansda House, Ganguria GP in P.S. Banshihari |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  20/04/2022 | 
                  ₹660,058.00 | 
                  27/07/2022 | 
                  790/ZP |         
                  28/12/2022 | 
                                      Scheme Completed: 23/03/2023 | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 703 |           
                  05-07-2022-23 |                   
                  Construction of Covered Drain from Keshabpur FP School towards Ganesh house (Jahangirpur) in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹2,328,783.00 | 
                  27/07/2022 | 
                  788/ZP |         
                  Not started | 
                                    75
                  
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 704 |           
                  04-10-2022-23 |                   
                  Construction of Covered Drain from Abul Kalams Culverts to Bipul Mondals Land under Najirpur GP in P.S. Balurghat |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹792,157.00 | 
                  27/07/2022 | 
                  786/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 16/03/2023 | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 705 |           
                  04-07-2022-23 |                   
                  Construction of Covered Drain from Patiram Tripti Hotel to Atrai River under Patiram GP in P.S. Balurghat. |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹1,485,294.00 | 
                  27/07/2022 | 
                  785/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 20/03/2023 | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 706 |           
                  04-04-2022-23 |                   
                  Construction of Covered Drain from Ishak Ali House towards Bilpukur Culvert in P.S. Tapan. |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹971,154.00 | 
                  27/07/2022 | 
                  784/ZP |         
                  13/01/2023 | 
                                      Scheme Completed: 12/05/2023 | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 707 |           
                  04-02-2022-23 |                   
                  Construction of Covered Drain from Najrul House towards Palpara in P.S. Tapan. |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹485,577.00 | 
                  27/07/2022 | 
                  783/ZP |         
                  20/09/2022 | 
                                      Scheme Completed: 20/01/2023 | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 708 |           
                  04-01-2022-23 |                   
                  Construction of Covered Drain from Majhikhanda Bottala Mogbul Dilar House towards Mijanur Rahaman House in P.S. Tapan.  |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹485,577.00 | 
                  27/07/2022 | 
                  782/ZP |         
                  20/09/2022 | 
                                      Scheme Completed: 20/01/2023 | 
                                    
                  
                 
                  15 FC 21-22 Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 709 |           
                  03-10-2022-23 |                   
                  Construction of road CC from Samsia More towards Basail More under P.S. Kushmandi. |                                     
                  J. Ray |   
                  Suhita Paul | 
                  20/04/2022 | 
                  ₹1,553,846.00 | 
                  27/07/2022 | 
                  781/ZP |         
                  01/09/2022 | 
                                      Scheme Completed: 17/03/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 710 |           
                  03-06-2022-23 |                   
                  Construction of CC Road from Sujit Roy house to Godoya Sau house (Belbari-I) in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹485,358.00 | 
                  27/07/2022 | 
                  780/ZP |         
                  08/09/2022 | 
                                    60
                  
                                     
                    Days Left:-1093
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 711 |           
                  03-04-2022-23 |                   
                  Construction of CC Road from Pulin Roy Nodighat to Kanduru Roy house (Belbari-I) in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹485,358.00 | 
                  27/07/2022 | 
                  778/ZP |         
                  02/09/2022 | 
                                    60
                  
                                     
                    Days Left:-1099
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 712 |           
                  03-0-2022-23 |                   
                  Construction of CC Road from Kailahar SSK School to Raju Mondal house under Uday GP in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹482,649.00 | 
                  27/07/2022 | 
                  777/ZP |         
                  27/08/2022 | 
                                    60
                  
                                     
                    Days Left:-1105
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 713 |           
                  03-01-2022-23 |                   
                  Construction of CC Road from Mahibur house towards Basakpara in PS Kushmandi |                                     
                  J. Ray |   
                  Suhita Paul | 
                  20/04/2022 | 
                  ₹1,553,846.00 | 
                  27/07/2022 | 
                  776/ZP |         
                  01/09/2022 | 
                                      Scheme Completed: 05/01/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 714 |           
                  02-08-2022-23 |                   
                  Construction of CC Road from Hachidul Mondal to Mainur Rahaman Mondal House under Nazirpur ZP in P.S. Balurghat |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹321,814.00 | 
                  27/07/2022 | 
                  772/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 16/01/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 715 |           
                  02-07-2022-23 |                   
                  Construction of CC Road from Batun Bus Stand to Debhog via Raghunathpur in PS Kumarganj |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹990,196.00 | 
                  27/07/2022 | 
                  771/ZP |         
                  Not started | 
                                    60
                  
                                    
                  
                   | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 716 |           
                  02-06-2022-23 |                   
                  Construction of CC Road from Chandpur CC road to Bandighi Khari under Deor GP in PS Kumarganj |                                     
                  R. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹1,456,731.00 | 
                  27/07/2022 | 
                  770/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 21/04/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 717 |           
                  02-03-2022-23 |                   
                  Construction of CC Road from Saidul Ali House to Shakti Pahan house in P.S. Hili |                                     
                  R. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹971,154.00 | 
                  27/07/2022 | 
                  768/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 20/02/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 718 |           
                  02-01-2022-23 |                   
                  Construction of CC Road from Nimai Orawn House towards Shibmandir in P.S. Tapan. |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹388,462.00 | 
                  27/07/2022 | 
                  764/ZP |         
                  08/11/2022 | 
                                      Scheme Completed: 05/02/2023 | 
                                    
                  
                 
                  15 FC 21-22 Un-tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 719 |           
                  01-13-2022-23 |                   
                  Repairing of Road from Biplab Roy house to Belbari primary junior Basic school,G.P. Belbari – 1, in p.s. Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹484,358.00 | 
                  27/07/2022 | 
                  767/ZP |         
                  27/08/2022 | 
                                      Scheme Completed: 31/03/2023 | 
                                    
                  
                 
                  Repair Maintenance of Rural road (Savings) fund | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 720 |           
                  01-12-2022-23 |                   
                  Construction of CC Road from Hamjapur more (Bikash Shil tea Shop) towards Shidminar via Lokman Ali house (Basuria) in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹582,730.00 | 
                  27/07/2022 | 
                  766/ZP |         
                  27/08/2022 | 
                                    60
                  
                                     
                    Days Left:-1105
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 721 |           
                  01-11-2022-23 |                   
                  Construction covered drain from Singadaha Uday Das's house to Bhola Chowdhury's house in PS Banshihari |                                     
                  J. Ray |   
                  Suhita Paul | 
                  20/04/2022 | 
                  ₹824,444.00 | 
                  27/07/2022 | 
                  765/ZP |         
                  07/12/2022 | 
                                      Scheme Completed: 15/03/2023 | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 722 |           
                  01-09-2022-23 |                   
                  Construction of Covered Drain from house of Mithun Chakraborty towards house of Sunil Das (Nitai Duktar – Post office, Jalalpur) in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹1,552,028.00 | 
                  27/07/2022 | 
                  763/ZP |         
                  02/03/2023 | 
                                    75
                  
                                     
                    Days Left:-903
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 723 |           
                  01-08-2022-23 |                   
                  Construction of Covered Drain from house of Fulbari Bus-stand towards Budhyadeb Bharati house under Uday GP in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹291,202.00 | 
                  27/07/2022 | 
                  762/ZP |         
                  17/01/2023 | 
                                    60
                  
                                     
                    Days Left:-962
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 724 |           
                  01-07-2022-23 |                   
                  Construction of Covered Drain from Deor bazaar at Anarul Miah’s Shop to East Side of Culvert under Deor GP in P.S. Kumarganj. |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹297,059.00 | 
                  27/07/2022 | 
                  761/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 13/02/2023 | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 725 |           
                  01-04-2022-23 |                   
                  Construction of CC Road from Rabiul Sarkar house towards Rejaul Karim under Uday GP in PS Gangarampur |                                     
                  J. Ray |   
                  Kalyan Bose | 
                  20/04/2022 | 
                  ₹628,157.00 | 
                  27/07/2022 | 
                  758/ZP |         
                  27/08/2022 | 
                                    60
                  
                                     
                    Days Left:-1105
                                    
                  
                   | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 726 |           
                  01-03-2022-23 |                   
                  Construction of CC Road from Shibtali Culvert to Durga Mandir under Jakirpur GP in PS Kumarganj |                                     
                  R. Ray |   
                  PABAN BASAK | 
                  20/04/2022 | 
                  ₹594,118.00 | 
                  27/07/2022 | 
                  757/ZP |         
                  25/08/2022 | 
                                      Scheme Completed: 06/11/2022 | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 727 |           
                  01-02-2022-23 |                   
                  Construction of CC Road from Habibur Rahaman House towards Moklechur Rahaman Pond In P.S. Tapan. |                                     
                  J. Ray |   
                  Somnath Kuiry | 
                  20/04/2022 | 
                  ₹388,462.00 | 
                  27/07/2022 | 
                  756/ZP |         
                  08/08/2022 | 
                                      Scheme Completed: 19/10/2022 | 
                                    
                  
                 
                  15th FC 2020-21 Supplimentary | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 728 |           
                  01-03-2021-22 |                   
                  Construction of CC road from Sataish BGSY road to Shirohi FP School via Uchhakpur Transformer in P.S. - Balurghat |                                     
                  K. Bhattacharya |   
                  PABAN BASAK | 
                  15/09/2021 | 
                  ₹1,740,000.00 | 
                  26/05/2022 | 
                  500/ZP |         
                  01/06/2022 | 
                                      Scheme Completed: 14/03/2023 | 
                                    
                  
                 
                  15 FC 20-21 Untied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 729 |           
                  13-02-2021-22 |                   
                  Construction of Public Health Units(BPHUs) at Harirampur  RH.A) Civil Work B) Sanitary & Plumbing Work |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  02/02/2022 | 
                  ₹4,752,799.00 | 
                  06/04/2022 | 
                  309/ZP |         
                  17/05/2022 | 
                                    365
                  
                                     
                    Days Left:-902
                                    
                  
                   | 
                                    
                  
                 
                  15 FC Health Grants for FY- 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 730 |           
                  13-01-2021-22 |                   
                  Construction of Public Health Units(BPHUs) at Tapan RH A) Civil Work B) Sanitary & Plumbing Work |                                     
                  Kamalkanti Bhattacharya |   
                  Somnath Kuiry | 
                  02/02/2022 | 
                  ₹4,752,799.00 | 
                  22/03/2022 | 
                  237/ZP |         
                  26/05/2022 | 
                                      Scheme Completed: 01/05/2023 | 
                                    
                  
                 
                  15 FC Health Grants for FY- 2021-22 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 731 |           
                  11-13-2021-22 |                   
                  Repairing of Road from Syndicate More towards Dhanaipur in P.S. Harirampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  23/12/2021 | 
                  ₹4,052,452.00 | 
                  06/05/2022 | 
                  413/ZP |         
                  21/10/2022 | 
                                    90
                  
                                     
                    Days Left:-1020
                                    
                  
                   | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads other than PMGSY  | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 732 |           
                  11-11-2021-22 |                   
                  Maintenance of CC Road from Kadamtala More towards Sadhan Sutradhar House under Belbari-II GP in P.S. Gangarampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  23/12/2021 | 
                  ₹969,398.00 | 
                  18/04/2022 | 
                  350/ZP |         
                  02/06/2022 | 
                                      Scheme Completed: 24/11/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 733 |           
                  11-10-2021-22 |                   
                  Maintenance of CC Road from Jhantu Barik House towards Santosh Pramanik under Belbari-I GP in P.S. Gangarampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  23/12/2021 | 
                  ₹968,988.00 | 
                  18/04/2022 | 
                  349/ZP |         
                  17/05/2022 | 
                                      Scheme Completed: 31/05/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 734 |           
                  11-09-2021-22 |                   
                  Maintenance of CC Road from Habibur Miah House towards Sanju Tigga House under Chaloon GP in P.S. Gangarampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  23/12/2021 | 
                  ₹973,520.00 | 
                  18/04/2022 | 
                  348/ZP |         
                  17/05/2022 | 
                                    60
                  
                                     
                    Days Left:-1207
                                    
                  
                   | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 735 |           
                  11-08-2021-22 |                   
                  Maintenance of CC Road from Hariranjan House towards Prabhat Roy House under Belbari-I GP in P.S. Gangarampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  23/12/2021 | 
                  ₹967,628.00 | 
                  07/04/2022 | 
                  317/ZP |         
                  18/05/2022 | 
                                      Scheme Completed: 07/11/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 736 |           
                  11-07-2021-22 |                   
                  Up gradation and Widening of CC  Road from Shib Mandir More towards Palash Saha House under Belbari-I in P.S. Gangarampur. |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  23/12/2021 | 
                  ₹971,255.00 | 
                  07/04/2022 | 
                  316/ZP |         
                  10/05/2022 | 
                                    60
                  
                                     
                    Days Left:-1214
                                    
                  
                   | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 737 |           
                  11-06-2021-22 |                   
                  Repairing & Maintenance of Road from Chousa More towards Rasulpur in P.S. Kumarganj. |                                     
                  Kamalkanti Bhattacharya |   
                  PABAN BASAK | 
                  23/12/2021 | 
                  ₹1,456,731.00 | 
                  06/05/2022 | 
                  412/ZP |         
                  01/06/2022 | 
                                      Scheme Completed: 17/08/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 738 |           
                  11-05-2021-22 |                   
                  Repairing & Maintenance of Road from Kumarganj High School towards Batulpara in P.S. Kumarganj. |                                     
                  Kamalkanti Bhattacharya |   
                  PABAN BASAK | 
                  23/12/2021 | 
                  ₹808,000.00 | 
                  07/04/2022 | 
                  314/ZP |         
                  19/05/2022 | 
                                      Scheme Completed: 17/08/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 739 |           
                  11-04-2021-22 |                   
                  Repairing & Maintenance of Road from Pukur Para Pacca Road towards Ahed Ali House in P.S. Kumarganj. |                                     
                  Kamalkanti Bhattacharya |   
                  PABAN BASAK | 
                  23/12/2021 | 
                  ₹1,456,731.00 | 
                  07/04/2022 | 
                  313/ZP |         
                  12/04/2022 | 
                                      Scheme Completed: 11/06/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 740 |           
                  11-02-2021-22 |                   
                  Construction of CC Road from Elas Sarkar Shop to Sajjad Mia House in P.S. Tapan |                                     
                  Kamalkanti Bhattacharya |   
                  Somnath Kuiry | 
                  23/12/2021 | 
                  ₹971,154.00 | 
                  07/04/2022 | 
                  312/ZP |         
                  18/04/2022 | 
                                      Scheme Completed: 11/06/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 741 |           
                  11-01-2021-22 |                   
                  Repair and maintenance of Road from Samidul Mandal House towards Bhupen Barman House in P.S. Balurghat |                                     
                  Kamalkanti Bhattacharya |   
                  PABAN BASAK | 
                  23/12/2021 | 
                  ₹485,577.00 | 
                  07/04/2022 | 
                  311/ZP |         
                  18/04/2022 | 
                                      Scheme Completed: 30/05/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Roads | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 742 |           
                  09-19-2021-22 |                   
                  Construction of Covered Drain from Small Bridge to Muradpur Pukur, Mahabari GP in P.S. Banshihari. |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  20/12/2021 | 
                  ₹582,692.00 | 
                  22/03/2022 | 
                  236/ZP |         
                  Not started | 
                                    60
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 743 |           
                  09-18-2021-22 |                   
                  Construction of hat-Shed at Dwaipkhanda Pirmajar(Purbo Para) in P.S. Tapan |                                     
                  Kamalkanti Bhattacharya |   
                  Somnath Kuiry | 
                  20/12/2021 | 
                  ₹971,154.00 | 
                  06/05/2022 | 
                  410/ZP |         
                  13/05/2022 | 
                                      Scheme Completed: 16/11/2022 | 
                                    
                  
                 
                  15th FC untied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 744 |           
                  09-17-2021-22 |                   
                  Installation of LED Street Light (High Mast Tower) at Dakshin Sukdebpur village in front of Hossein Ali,Son of Moselem Ali House, G.P. 7 no  Dakshin Sukdebpur  in PS- Tapan, Dist-Dakshin Dinajpur |                                     
                  Kamalkanti Bhattacharya |   
                  Nihar Ghosh | 
                  20/12/2021 | 
                  ₹584,485.00 | 
                  22/03/2022 | 
                  235/ZP |         
                  20/10/2022 | 
                                      Scheme Completed: 08/04/2023 | 
                                    
                  
                 
                  15th FC untied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 745 |           
                  09-16-2021-22 |                   
                  Up gradation of Electrical Cubical Panel Board and S/laying 1.1 KV grade PVC/A. XLPE insulated Aluminium Armoured Cable at DDZP Office Campus, Dist- Dakshin Dinajpur |                                     
                  Jaydip Ray |   
                  Nihar Ghosh | 
                  20/12/2021 | 
                  ₹250,848.00 | 
                  22/03/2022 | 
                  234/ZP |         
                  17/03/2023 | 
                                    60
                  
                                     
                    Days Left:-903
                                    
                  
                   | 
                                    
                  
                 
                  15th FC untied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 746 |           
                  09-14-2021-22 |                   
                  Installation of LED Street Light(High Mast Tower) at Naroi, Gangarampur GP, in P.S. Gangarampur, Dist- Dakshin Dinajpur  |                                     
                  Jaydip Ray |   
                  Nihar Ghosh | 
                  20/12/2021 | 
                  ₹580,485.00 | 
                  22/03/2022 | 
                  233/ZP |         
                  21/05/2022 | 
                                      Scheme Completed: 08/02/2023 | 
                                    
                  
                 
                  15th FC Un-Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 747 |           
                  10-10-2021-22 |                   
                  Construction of Drain from Nahit High School to Uttar Nahit in P.S. Kushmandi. |                                     
                  Jaydeep Ray |   
                  Suhita Paul | 
                  16/12/2021 | 
                  ₹1,748,077.00 | 
                  28/03/2022 | 
                  268/ZP |         
                  19/05/2022 | 
                                      Scheme Completed: 07/09/2022 | 
                                    
                  
                 
                  15th FC Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 748 |           
                  10-09-2021-22 |                   
                  Construction of Top Floor of Balupara Market Complex under Hili P.S. |                                     
                  Kamalkanti Bhattacharya |   
                  Somnath Kuiry | 
                  16/12/2021 | 
                  ₹3,204,807.00 | 
                  28/03/2022 | 
                  267/ZP |         
                  Not started | 
                                    90
                  
                                    
                  
                   | 
                                    
                  
                 
                  15th FC Tied | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 749 |           
                  10-07-2021-22 |                   
                  Repairing of Road from Usaharan to Kushmandi in P.S. Kushmandi |                                     
                  Jaydip Ray |   
                  Suhita Paul | 
                  16/12/2021 | 
                  ₹2,329,762.00 | 
                  23/05/2022 | 
                  483/ZP |         
                  03/06/2022 | 
                                      Scheme Completed: 21/09/2022 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Road other than BGSY during 2020-21 | 
                  
                                        
                    
                                        
                    
                   | 
                
                                
                                    | 750 |           
                  10-06-2021-22 |                   
                  Repairing of CC Road from Ratanpur More towards Kobirpur(1st phase) under Nandanpur GP in P.S. Gangarampur |                                     
                  Jaydip Ray |   
                  Kalyan Bose | 
                  16/12/2021 | 
                  ₹4,302,850.00 | 
                  28/03/2022 | 
                  265/ZP |         
                  18/05/2022 | 
                                      Scheme Completed: 09/01/2023 | 
                                    
                  
                 
                  Repair/Maintenance of Rural Road other than BGSY during 2020-21 | 
                  
                                        
                    
                                        
                    
                   |