1 |
11-01-24-25 |
Yearly repairing and maintenance of Electrical Works under ZP Premises and another Building-40102 |
|
Nihar Ghosh |
26/07/2024 |
₹150,000.00 |
04/09/2024 |
1050/ZP |
Not started |
365
|
5th SFC |
|
2 |
10-08-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Naogoan High School, RCA magurpur High School, Kardaha High School, Ramchandrapur High School, Vior Jalaliya Bakhar , Bhadrail, Tilon , Tapan Nathaliyan Murmu Memorial Collage , Daralhat, Balapur High School ,Tapan Girls, Tapan ,Baniyal apan Block under DDZP-44812682 |
|
Kalyan Bose |
24/07/2024 |
₹346,568.00 |
29/10/2024 |
1259/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
3 |
10-07-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Deor Sanaulla, Sitahar Mulgram , Gourangopur, Kumarganj Safanagar , Ellendari, Kulohari , Balupara Girls, Gopalganj RN , Kumarganj College, Dangar Hat High School , Patiram Pather Sathi (Patiram GP, Balurghat Block),Patiram G.P. Office (Patiram GP, Balurghat Block),Anghina Borot High School, Sundarpur Girls High School ,Tulot High School, Manjurichak Raikhan High School,Saidpur BMA -44812723 |
|
PABAN BASAK |
24/07/2024 |
₹495,098.00 |
29/10/2024 |
1258/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
4 |
10-05-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Hili High School, Hili Girls High School,Teor Sarbeswar Balika Bidhyalaya,Teor Govt. Sponsored Balika Bidyalaya of Hili Block under DDZP-44812741 |
|
PABAN BASAK |
24/07/2024 |
₹99,019.00 |
29/10/2024 |
1257/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
5 |
10-05-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Sairapur High School, Fulbari High School, Belbari High School, Niranjan Smriti High School, Raghobpur High School, Jaghagirpur High School, Ashokgram High School, Nehemba High School, Gangarampur Girls High School, Sukdebpur High School, Holy Crose Girls High School ,Gangarampur Collage ,Narai Moulana Azad Academy ,Chaloon High School ,G.M Girls Academy ,Banihari High School ,Gangarampur-44812847 |
|
PABAN BASAK |
24/07/2024 |
₹495,098.00 |
29/10/2024 |
1256/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
6 |
10-04-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Daulatpur High School, Ganguria High School, Bagduar MSK, Haripur Bes an Nur Model Girls Mission,Belpukur High Madrasha ,Pathar ghata High School of Banshihari Block under DDZP-44812878 |
|
Kalyan Bose |
24/07/2024 |
₹148,530.00 |
29/10/2024 |
1255/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
7 |
10-03-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at ASDM High School, Khayerbari High School, Lohachar High School ,Danab Gram I.C. Hich School of Harirampur Block under DDZP-44812903 |
|
Kalyan Bose |
24/07/2024 |
₹99,019.00 |
29/10/2024 |
1254/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
8 |
10-02-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Katabri High School, Lohaganj High School, Aminpur High School, Nahit High School, Parpmeswarpur High School, Khagail Tankanath High School, Mahipal High School, Dhakdhol High School,Chandipur High School (Gokarna gp, Harirampur block), Belbari GP Office(Belbari-1, Gangarampur Block), Nadan High Madrasha (Dwipkhanda GP, Tapan Block) ,Mangalpur Adhi Basi High School ,Chousa -44812954 |
|
Kalyan Bose |
24/07/2024 |
₹396,078.00 |
29/10/2024 |
1253/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
9 |
10-01-24-25 |
Supplying & Installation of Sanitary napkin vending Machine & Incinerator at Chingispur High School, Sobra High School, Kurmail Sonapara SC High School, Barkail High School, Chakram BL High School, Kuchila High School, Khidirpur High School, Ajadhya Kalibari High School, Patiram Jamini Majumder Memorial Collage , N.C. Girls High School , Khadimpur Girls High School ,Balurghat Girlool |
|
PABAN BASAK |
24/07/2024 |
₹396,078.00 |
29/10/2024 |
1252/ZP |
Not started |
45
|
15th FC TIED (20-21) |
|
10 |
09-06-24-25 |
Installation of Solar High Mast Light in front of Kokil more MR Delar’s Shop under Pundari GP in P.S. Harirampur |
|
Nihar Ghosh |
23/07/2024 |
₹434,984.00 |
29/10/2024 |
1251/ZP |
Not started |
90
|
BEUP 42 |
|
11 |
09-05-24-25 |
Installation of Solar High Mast Light at Bhitar Mushan Hatkhola under Brajaballavpur GP in P.S. Banshihari |
|
Nihar Ghosh |
23/07/2024 |
₹434,984.00 |
29/10/2024 |
1250/ZP |
Not started |
90
|
BEUP 42 |
|
12 |
09-02-24-25 |
Installation of Solar High Mast Light at Kalyanni More under Mahabari GP in P.S. Banshihari. |
|
Nihar Ghosh |
23/07/2024 |
₹434,984.00 |
29/10/2024 |
1249/ZP |
Not started |
90
|
BEUP 42 |
|
13 |
09-02-24-25 |
Installation of Solar High Mast Light at Gurkhari Graveyard under Bagichapur GP in P.S. Harirampur block |
|
Nihar Ghosh |
23/07/2024 |
₹434,984.00 |
29/10/2024 |
1248/ZP |
Not started |
90
|
BEUP 42 |
|
14 |
09-02-24-25 |
Installation of Solar High Mast Light at Pathar Para more infront of MSK School under Gokarna GP in P.S. Harirampur block |
|
Nihar Ghosh |
23/07/2024 |
₹434,984.00 |
29/10/2024 |
1247/ZP |
Not started |
90
|
BEUP 42 |
|
15 |
09-01-24-25 |
Installation of Solar High Mast Light at Jhinakuri more under Bairhatta GP in P.S. Harirampur block |
|
Nihar Ghosh |
23/07/2024 |
₹434,984.00 |
29/10/2024 |
1246/ZP |
Not started |
90
|
BEUP 42 |
|
16 |
08-05-24-25 |
Installation of Purify Water Machine at Fulbari High School 2 pc. And Dautpur FP school (Ajmatpur GP)-58212159 |
|
PABAN BASAK |
23/07/2024 |
₹297,058.00 |
04/09/2024 |
1049/ZP |
Not started |
30
|
15th FC TIED (2022-23) |
|
17 |
08-04-24-25 |
Supply & Installation of Water Purifier cum Chiller Machine in Sayraour Kali Mandir, Thangapra Natta Mandir- 2 no, Bikoir Jr. High School -2 no & Vivekananda girls High School-2 no, Naroi Moulana Azad Academy-2 no,sankar Boys & Girls Mission(Gofanagar GP)-2 no,Baniyal High School(Gofanagar Gp)-69611202 |
|
PABAN BASAK |
23/07/2024 |
₹1,336,708.00 |
04/09/2024 |
1048/ZP |
Not started |
30
|
15th FC TIED (2023-24) |
|
18 |
08-03-24-25 |
Repairing & renovation works at Block - A, Block-B and Block-C of Dakshin Dinajpur Zilla Parishad |
|
PABAN BASAK |
23/07/2024 |
₹697,289.00 |
04/09/2024 |
1047/ZP |
Not started |
60
|
15th FC |
|
19 |
08-01-24-25 |
Construction of Rose Garder at Dakshin Dinajpur Zilla Parishad. |
|
PABAN BASAK |
23/07/2024 |
₹3,978,156.00 |
04/09/2024 |
1046/ZP |
Not started |
60
|
Horticulture |
|
20 |
06-02-24-25 |
Construction of CC road from Masjid to Afsar Miah House under Uday GP in Gangarampur P.S. |
|
PABAN BASAK |
04/07/2024 |
₹495,096.00 |
04/09/2024 |
1045/ZP |
Not started |
60
|
15th FC (22-23) |
|
21 |
06-01-24-25 |
Repair and Renovation of 2nd gate and construction of Internal road within Buniadpur College Campus. |
|
Suhita Paul |
04/07/2024 |
₹1,210,047.00 |
04/09/2024 |
1044/ZP |
Not started |
90
|
DAP (Critical Gap) |
|
22 |
05-04-2024 |
Supply and installation of Solar based LDTW ( 150 mm x 100 mm ) for minor irrigation at the land of 1) Sabnam Mustari, C/o Mojahar Alam, Birpur Kushmandi 2) Nitai Sarkar, C/o Prabash Ch. Sarkar, Saidpur, Boalder, G.P. Balurghat, 3) Wares Ali, C/o Ajijuddin Ahamed, vill – Jaharpur Elahabad GP Banshihar, |
|
Nihar Ghosh |
27/06/2024 |
₹2,390,634.00 |
04/09/2024 |
1043/ZP |
Not started |
60
|
5th SFC (23-24) |
|
23 |
05-03-24-25 |
Construction of boundary wall at ZP Land adjacent to Police Station Tapan under Chandipur GP in PS – Tapan |
|
Kalyan Bose |
27/06/2024 |
₹1,492,791.00 |
04/09/2024 |
1042/ZP |
Not started |
90
|
5th SFC (23-24) |
|
24 |
05-02-24-25 |
Construction of RCC Box Bridge (1 No x 3.0 M x 3.0 M) at Kamalpur more under Tapan P.S., Dist Dakshin Dinajpur |
|
Kalyan Bose |
27/06/2024 |
₹1,516,071.00 |
04/09/2024 |
1041/ZP |
Not started |
90
|
5th SFC (23-24) |
|
25 |
05-01-24-25 |
Maintenance of Khatkhatia Bridge on the road from Mahipal to Beltala more near Beltala more over Mankhari in PS Kushmandi |
|
Suhita Paul |
27/06/2024 |
₹1,448,099.00 |
04/09/2024 |
1040/ZP |
Not started |
90
|
DAP |
|
26 |
03-01-24-25 |
Construction of CC Road from Chheoda to Bishkuri in P.S. Kushmandi GP- Kushmandi |
|
Kalyan Bose |
18/06/2024 |
₹7,713,266.00 |
29/10/2024 |
1245/ZP |
Not started |
120
|
PATHASHREE-3 |
|
27 |
68-04-23-24 |
Supply and Installation of Water ATM infront side of Tulot High School, Vill-Tulot under Jakirpur GP in P.S. Kumarganj(Civil+ Electrical Work) |
|
PABAN BASAK |
15/03/2024 |
₹534,134.00 |
24/07/2024 |
844/ZP |
Not started |
90
|
5th SFC Tied |
|
28 |
68-03-23-24 |
Installation of Solar Street Light front side of Saddik Mondal house, Kadamathail front side of Deloyar Hossen Mondal house, Badkharna-front side of Jalal Mondal House and Masjit PS- Balurghat. GP- Nazirpur-69386295 |
|
SMRITI CHANDRA KARMAKAR |
15/03/2024 |
₹460,420.00 |
24/07/2024 |
843/ZP |
Not started |
60
|
15th FC TIED (2nd) (2023-24) |
|
29 |
68-02-23-24 |
Construction of Box Bridge (3nos x 3.0m x 3.0m) at Patul on Road from Chenchra More to Bajitpur under nandanpur GP in P.S. Gangarampur. |
|
PABAN BASAK |
15/03/2024 |
₹4,459,158.00 |
24/07/2024 |
842/ZP |
Not started |
|
5th SFC Tied |
|
30 |
68-01-23-24 |
Construction of RCC Box Bridge (2nos x 3.0m x 3.0m) at Dolkura, Mahendra under Harirampur PS. |
|
Kalyan Bose |
15/03/2024 |
₹2,930,016.00 |
24/07/2024 |
841/ZP |
Not started |
180
|
5th SFC Tied |
|
31 |
67-08-23-24 |
Installation of Solar Powered LDTW (150mm x 100mm) for Minor Irrigation at the Land of Nijrin Pavin w/o Aktarul Haque Mondal in GP-Ashokegram, Gangarampur, Dakshin DInajpur-40090 |
|
PABAN BASAK |
11/03/2024 |
₹871,692.00 |
24/07/2024 |
840/ZP |
Not started |
|
5th SFC Tied |
|
32 |
67-07-23-24 |
Construction of CC road from Ajil Molla House towards Balihar Eidgaha Pucca Road, Ramchandrapur in P.S. Tapan-68347760 |
|
Kalyan Bose |
11/03/2024 |
₹971,151.00 |
24/07/2024 |
839/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (2nd t Phase) |
|
33 |
67-06-23-24 |
Installation of Solar Street Light at Doulatpur Football Mat. GP- Mahabari in P.S. Banshihari.-70385254 |
|
Nihar Ghosh |
11/03/2024 |
₹460,420.00 |
24/07/2024 |
838/ZP |
Not started |
60
|
15th FC TIED(2nd ) (2023-24) |
|
34 |
67-05-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Pratap Chandra Kundu in GP Uday , Gangarampur-71014372 |
|
PABAN BASAK |
11/03/2024 |
₹871,692.00 |
24/07/2024 |
837/ZP |
Not started |
60
|
15th FC TIED(2nd ) (2023-24) |
|
35 |
67-04-23-24 |
Fencing work at front side of Kushmandi Ustab Bhabhan and Construction of drain in P.S. Kushmandi. |
|
Suhita Paul |
11/03/2024 |
₹999,934.00 |
24/07/2024 |
836/ZP |
Not started |
|
15th FC Un-tied |
|
36 |
67-02-23-24 |
Construction of CC Road from Samsuddin House to Lohar Bridge(east Harsura), Harsura GP in P.S. Tapan |
|
Kalyan Bose |
11/03/2024 |
₹2,519,973.00 |
25/10/2024 |
1221/ZP |
Not started |
90
|
Repair and Maintenance |
|
37 |
67-01-23-24 |
Construction of CC Road from Zilla Parishad Road towards Hafijul Miah House in Vill-Gokulpur under Ashokgram GP In P.S. Gangarampur. |
|
PABAN BASAK |
11/03/2024 |
₹1,262,499.00 |
24/07/2024 |
835/ZP |
Not started |
90
|
5th SFC Un-tied |
|
38 |
64-11-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Mahammad Sahir in GP-Pundari in P.S. Harirampur-70998482 |
|
Nihar Ghosh |
22/02/2024 |
₹871,692.00 |
23/07/2024 |
834/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
39 |
64-09-23-24 |
Construction of CC Road from Main road to Doulatpur Hatidoba, Ganguria GP Sayastabad Altab Miah House in P.S. Banshihari.68132725 |
|
Kalyan Bose |
22/02/2024 |
₹685,554.00 |
23/07/2024 |
833/ZP |
Not started |
60
|
15th FC UN-TIED (2023-24) (1st phase) |
|
40 |
64-08-23-24 |
Construction of Mukta Mancha at Najrul Smrity High School, Bagichapur under Harirampur PS-6989560 |
|
Kalyan Bose |
22/02/2024 |
₹494,911.00 |
23/07/2024 |
832/ZP |
Not started |
90
|
15th FC UN-TIED (2023-24) (2nd phase) |
|
41 |
64-07-23-24 |
Installation of Solar Powered water ATM infront of Bolla Hospital Para at front side of Kachimuddin Molla House, Vill-Bolla under Balurghat PS-69801832 |
|
Nihar Ghosh |
22/02/2024 |
₹527,774.00 |
23/07/2024 |
831/ZP |
Not started |
60
|
15th FC TIED (2023-24) (2nd phase) |
|
42 |
64-06-23-24 |
Construction of Sasan Ghat and Waiting Shed at Belkhariya Pukur west side in Vill-Chalunda under Uday GP in P.S. Gangarampur-68372152 |
|
PABAN BASAK |
22/02/2024 |
₹1,089,216.00 |
23/07/2024 |
830/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) (1st Phase) |
|
43 |
64-04-23-24 |
Construction of CC Road from Baropara towards Baskuriya Pukur rest part, Mostafapur under Uday GP in P.S. gangarampur-70882132 |
|
PABAN BASAK |
02/02/2024 |
₹582,690.00 |
23/07/2024 |
829/ZP |
Not started |
60
|
15th FC UN-TIED(1st) (2023-24) |
|
44 |
64-03-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Sahajan Sarkar in GP-Ramkrishnapur, P.S. Kumarganj-71020232 |
|
PABAN BASAK |
22/02/2024 |
₹781,421.00 |
23/07/2024 |
828/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
45 |
64-02-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Rased Mondal Sarkar in GP-Samjia, P.S. Kumarganj-71019489 |
|
Nihar Ghosh |
22/02/2024 |
₹781,421.00 |
23/07/2024 |
827/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
46 |
64-01-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Ahed Ali Sarkar in GP-Bhour, P.S. Kumarganj-71018802 |
|
Nihar Ghosh |
22/02/2024 |
₹781,421.00 |
23/07/2024 |
826/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
47 |
63-04-23-24 |
Supply of water ATM machine at Patiram High School , Patiram Vivekananda High School, Jahangirpur High School,Ashoke Gram High School , Bolla High School,kuchkari High School(Mahabari GP),Badalpur High School (Brajavallavpur GP), Gyanankur Vidyaniketan Elandari under Safanagar G.P.-67469264 |
|
PABAN BASAK |
07/02/2024 |
₹891,159.00 |
15/03/2024 |
442/ZP |
Not started |
30
|
15th FC TIED (2021-22) |
|
48 |
63-03-23-24 |
supply & Installation of Water Purifier cum Chiller Machine in Sayrapur High School-2 nBajitpur High School-2 no, Radhanagar Natta Mandir,Al-Ekra -Mission( Mahabari GP),Balapur High School(Gofanagar GP), Dangar hat High School under Kumarganj Block-2 no.-69609688 |
|
PABAN BASAK |
07/02/2024 |
₹1,019,698.00 |
15/03/2024 |
441/ZP |
Not started |
30
|
15th FC TIED (2023-24) |
|
49 |
63-01-23-24 |
Supply & Installation of Water Purifier cum Chiller Machine in Badamail L.P. High School-2 no ,Palsa TAHID mission-2 no ,Baul Hindu Milon-2, Mandir Malancha madrasha-1, Tulot High School under Kumarganj Block. -2 no,Shihol High School(Elahabad GP),Maja-Eri-academy& Darul Koran Tikarpukur (Jagangir GP), MAhabari GP office (Banshihari Block)-69622965 |
|
Kalyan Bose |
07/02/2024 |
₹1,336,708.00 |
15/03/2024 |
440/ZP |
Not started |
30
|
15th FC TIED (2023-24) |
|
50 |
62-01-23-24 |
Construction of CC Road from Chainage 985.00 mtr. of Ghoshpara-Dakshin Debipur Road to Dakshin Debipur Primary School in P.S. Gangarampur. |
|
PABAN BASAK |
02/02/2024 |
₹4,227,015.00 |
12/03/2024 |
410/ZP |
Not started |
120
|
PATHASHREE-3 |
|
51 |
61-16-23-24 |
Construction of Cc Road from Kakoti Pacca Road to Chakmahon Rejaul’s House under Jakirpur GP in P.S. Kumarganj. |
|
PABAN BASAK |
02/02/2024 |
₹2,913,462.00 |
15/03/2024 |
338/ZP |
Not started |
90
|
Repair maintenance 23 |
|
52 |
61-15-23-24 |
Construction of CC Road from Swapan Mahato House to Gajen Mahato House under Binshira GP In P.S. Hili. |
|
PABAN BASAK |
02/02/2024 |
₹1,782,353.00 |
15/03/2024 |
337/ZP |
Not started |
90
|
5th SFC |
|
53 |
61-14-23-24 |
Construction of CC Road from Pacca Road near the shop of Nirmal Sarkar at Dakshin Ramkrishnapur towards the house of Provu Minji under Deor GP in P.S. Kumarganj. |
|
PABAN BASAK |
02/02/2024 |
₹1,942,308.00 |
15/03/2024 |
336/ZP |
Not started |
90
|
5th SFC |
|
54 |
61-13-23-24 |
Construction of CC Road from Raghunathpur towards Batun Hospital main road at Batun GP In P.S. Kumarganj |
|
PABAN BASAK |
02/02/2024 |
₹990,196.00 |
15/03/2024 |
335/ZP |
Not started |
90
|
5th SFC |
|
55 |
61-12-23-24 |
Construction of CC Road from Sukur Ali House towards Subhash Roy House via Tarani Roy House under Samjia GP In P.S. Kumarganj. |
|
PABAN BASAK |
02/02/2024 |
₹1,188,235.00 |
15/03/2024 |
334/ZP |
Not started |
90
|
5th SFC |
|
56 |
61-11-23-24 |
Construction of CC Road from Deb Das House towards Saraswati Mahanta House under Panjul GP in P.S. Hili. |
|
PABAN BASAK |
02/02/2024 |
₹1,456,731.00 |
15/03/2024 |
333/ZP |
Not started |
|
5th SFC |
|
57 |
61-09-23-24 |
Construction of CC Road from Dipen Barman Land to Nitai Mondal land in P.S. Balurghat |
|
SMRITI CHANDRA KARMAKAR |
02/02/2024 |
₹1,782,353.00 |
15/03/2024 |
332/ZP |
Not started |
90
|
5th SFC 2nd Inst |
|
58 |
61-08-23-24 |
Construction of CC Road from Uttam Tailars towards Puiyakuri in P.S. Balurghat |
|
SMRITI CHANDRA KARMAKAR |
02/02/2024 |
₹990,196.00 |
15/03/2024 |
331/ZP |
Not started |
90
|
5th SFC |
|
59 |
60-07-23-24 |
Balance Portion Repairing works of toilets and kitchen shed of Harirampur ZP Ustav Bhaban in P.S. Harirampur(Civil Portion) |
|
Kalyan Bose |
15/03/2024 |
₹491,070.00 |
15/03/2024 |
330/ZP |
Not started |
90
|
5th SFC |
|
60 |
61-06-23-24 |
Construction of covered Drain from Petnidighi towards Hatkhola, GP-Maligaon in P.S. Kushmandi. |
|
Suhita Paul |
02/02/2024 |
₹1,386,056.00 |
15/03/2024 |
329/ZP |
Not started |
90
|
5th SFC 2nd Inst |
|
61 |
61-05-23-24 |
Construction of CC Road Toltala to the end of Jhap Para towards Panchidipti More at Gobra Bill in P.S. Kushmandi |
|
Kalyan Bose |
02/02/2024 |
₹1,980,184.00 |
15/03/2024 |
328/ZP |
Not started |
90
|
5th SFC |
|
62 |
61-04-23-24 |
Construction of CC Road from Afsar Miah House towards Kalam Miah House via Sadekul Miah House, Dotaripara, Bagichapur in P.S. Harirampur. |
|
Kalyan Bose |
02/02/2024 |
₹971,154.00 |
15/03/2024 |
327/ZP |
Not started |
90
|
5th SFC |
|
63 |
61-03-23-24 |
Installation of Solar Powered water ATM infront of Barampur FP School, Hazaratpur under Tapan PS-69617940 |
|
Kalyan Bose |
02/02/2024 |
₹533,582.00 |
15/03/2024 |
326/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
64 |
61-2-23-24 |
Construction of CC Road from Korai Mollapara Ajijul’s House towards Bellal’s House in P.S. Banshihari- |
|
Kalyan Bose |
02/02/2024 |
₹408,169.00 |
15/03/2024 |
325/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
65 |
60-12-23-24 |
Construction of Covered Drain from Mohanlal Sarkar House towards Laxmitala under Awashinpara Damdama GP in P.S. Gangarampur-68422464 |
|
PABAN BASAK |
31/01/2024 |
₹1,262,180.00 |
06/03/2024 |
385/ZP |
Not started |
90
|
15th FC TIED (23-24) (1st Phase) |
|
66 |
60-11-23-24 |
Installation of Solar Powered LDTW (150mm x 100mm) for Minor Irrigation at the Land of EMon CHoudhury in GP- Jakirpur, Kumarganj, Dakshin DInajpur-40084 |
|
Nihar Ghosh |
31/01/2024 |
₹781,421.00 |
06/03/2024 |
384/ZP |
Not started |
90
|
5th SFC |
|
67 |
60-10-23-24 |
Supply and Installation of LED Solar Street Light at Chakbaran Kabarstan and Chakbaran Club and other place in GP- Mohona, Ps- Kumarganj-40081 |
|
Nihar Ghosh |
31/01/2024 |
₹460,420.00 |
06/03/2024 |
383/ZP |
Not started |
90
|
5th SFC |
|
68 |
60-9-23-24 |
Installation of Solar Powered LDTW (150mm x 100mm) for Minor Irrigation at the Land of Dhiraj Sarkar in GP- Udaypur, Kushmandi, Dakshin DInajpur-40089 |
|
Nihar Ghosh |
31/01/2024 |
₹781,421.00 |
06/03/2024 |
382/ZP |
Not started |
90
|
5th SFC |
|
69 |
60-7-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Sitesh Mondal in GP-Danga PS- Balurghat, Dakshin Dinajpur-70996584 |
|
Nihar Ghosh |
31/01/2024 |
₹735,328.00 |
06/03/2024 |
381/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
70 |
60-6-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Santosh Sarkar, GP-Bhatpara PS- Balurghat, Dakshin Dinajpur-71003841 |
|
Nihar Ghosh |
31/01/2024 |
₹735,328.00 |
06/03/2024 |
380/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
71 |
60-05-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Samsul Mandal in GP-Chaloon, Gangarampur, Dakshin Dinajpur-71009991 |
|
Nihar Ghosh |
31/01/2024 |
₹871,692.00 |
06/03/2024 |
379/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
72 |
60-04-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Dabiruddin Miah in GP-Ganguria, Banshihari Dakshin Dinajpur-71023718 |
|
Nihar Ghosh |
31/01/2024 |
₹781,421.00 |
06/03/2024 |
378/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
73 |
60-03-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Reajul Mondal at Doraha in GP-Jakirpur, Kumarganj Dakshin Dinajpur-71037076 |
|
Nihar Ghosh |
31/01/2024 |
₹781,421.00 |
06/03/2024 |
377/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
74 |
60-2-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Abdur Rajjak at Elahabad(Kamarpukur) in GP-Elahabad, Banshihari, Dakshin Dinajpur-71037076 |
|
Nihar Ghosh |
31/01/2024 |
₹781,421.00 |
06/03/2024 |
376/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
75 |
60-01-23-24 |
Installation of Solar Powered LDTW for Minor Irrigation at the Land of Dilip Debnath in GP-Amritakhanda, PS- Balurghat, Dakshin Dinajpur-71011856 |
|
Nihar Ghosh |
31/01/2024 |
₹735,328.00 |
06/03/2024 |
375/ZP |
Not started |
90
|
15th FC TIED (2023-24) (2nd phase) |
|
76 |
59-08-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Mainul Haque in GP-Mahabari in P.S. Banshihari-70995527 |
|
Nihar Ghosh |
25/01/2024 |
₹781,421.00 |
04/03/2024 |
366/ZP |
Not started |
90
|
15th FC -TIED (1st) (23-24) |
|
77 |
59-07-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Masal Hansda in GP-Ganguria in P.S. Banshihari-70993785 |
|
Nihar Ghosh |
25/01/2024 |
₹781,421.00 |
04/03/2024 |
365/ZP |
Not started |
90
|
15th FC -TIED (1st) (23-24) |
|
78 |
59-06-23-24 |
Construction of Covered Drain from Mofajjal Mia House towards Dulal Sarkar House with Soak Pit under Samjia GP in P.S. Kumarganj-68419005 |
|
PABAN BASAK |
25/01/2024 |
₹971,153.00 |
04/03/2024 |
364/ZP |
Not started |
90
|
15th FC -TIED (23-24) |
|
79 |
59-05-23-24 |
Construction of Mukta Mancha at Nirenjan Smriti High School in Belbari-I GP under Gangarampur PS-69894040 |
|
PABAN BASAK |
25/01/2024 |
₹495,098.00 |
04/03/2024 |
363/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
80 |
59-04-23-24 |
Construction of Covered Drain from Abdul Zabbar Munchi Pond to Khari with Soak Pit vill-Rajapur, GP-Boaldar under Balughat PS-68423736 |
|
SMRITI CHANDRA KARMAKAR |
25/01/2024 |
₹1,188,234.00 |
04/03/2024 |
362/ZP |
Not started |
90
|
15th FC -TIED (23-24) |
|
81 |
59-3-23-24 |
Construction of CC road from Himangsu’s House towards Retion Delar House, Bhabanipur, Gofanagar in P.S. Tapan-68342896 |
|
Kalyan Bose |
25/01/2024 |
₹971,154.00 |
04/03/2024 |
361/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
82 |
59-02-23-24 |
Construction of CC approach road(part) at Khirotta Hazaratpur GP under Tapan PS. for Solid Wast management Unit-70752671 |
|
Kalyan Bose |
25/01/2024 |
₹1,456,730.00 |
04/03/2024 |
360/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
83 |
59-01-23-24 |
Construction of CC road from Khoka More towards Mobarak Miah via Bharat, Malahar Harsura in P.S. Tapan-70371906 |
|
Kalyan Bose |
25/01/2024 |
₹971,149.00 |
04/03/2024 |
359/ZP |
Not started |
90
|
15th FC -TIED (23-24) |
|
84 |
58-11-23-24 |
Construction of CC road from Khudu Barman House towards Kailash Barman House Jaminipara, Hazaratpur in P.S. Tapan-68343107 |
|
Kalyan Bose |
19/01/2024 |
₹971,154.00 |
04/03/2024 |
358/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
85 |
58-10-23-24 |
Construction of Covered Drain from Kalam Miah House towards Sudip Rajjak House, VIll-Srirampur, Mahabri GP in P.S. Banshihari-44812378 |
|
Kalyan Bose |
19/01/2024 |
₹593,879.00 |
04/03/2024 |
357/ZP |
Not started |
90
|
15th FC TIED (20-21) |
|
86 |
58-08-23-24 |
Construction of Covered Drain from Mundehar Baritalapukur to Samsuddin Miah Land, Vill- Munderhar, Mahabari GP in P.S.banshihari-68419005 |
|
Kalyan Bose |
19/01/2024 |
₹989,862.00 |
04/03/2024 |
356/ZP |
Not started |
90
|
15th FC TIED (23-24) |
|
87 |
58-06-23-24 |
Construction of CC approach road(part) at Chitakuri Math, Faijullapur Bairhatta GP under Harirampur PS for Solid Wast management Unit-70739940 |
|
Kalyan Bose |
19/01/2024 |
₹971,154.00 |
04/03/2024 |
355/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
88 |
58-05-23-24 |
Construction of CC Road from Subhas Mahato House towards Ashiwini Mali House under Jamalpur GP In P.S. Hili-68347436 |
|
PABAN BASAK |
19/01/2024 |
₹971,154.00 |
04/03/2024 |
354/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
89 |
58-04-23-24 |
Construction of CC Road from Adibashi Para More to CPW More under Panjul GP in P.S. Hili-69350979 |
|
PABAN BASAK |
19/01/2024 |
₹971,154.00 |
04/03/2024 |
353/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
90 |
58-03-23-24 |
Construction of CC Road from Goborta SSK School towards Nilamtara FP School under Ramkrishnapur GP in P.S.-Kumarganj-68371179 |
|
PABAN BASAK |
19/01/2024 |
₹990,196.00 |
04/03/2024 |
352/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
91 |
58-02-23-24 |
Construction of CC Road from Bholanathpur More towards Post Office under Jakirpur GP in P.S. Kumarganj-70369477 |
|
PABAN BASAK |
19/01/2024 |
₹971,154.00 |
04/03/2024 |
351/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) |
|
92 |
58-01-23-24 |
Construction of Covered Drain from Mohana Tut Farm House towards Kachi Kacha Club west Side with Soak Pit under Mohona GP in P.S. Kumarganj-70800076 |
|
PABAN BASAK |
19/01/2024 |
₹1,456,731.00 |
04/03/2024 |
350/ZP |
Not started |
90
|
15th FC TIED (2023-24) |
|
93 |
57-9-23-24 |
Construction of metal road from Binnakuri More towards Uttar Mahadevpur under Harsura GP in P.S. Tapan |
|
Kalyan Bose |
17/01/2024 |
₹6,207,939.00 |
21/02/2024 |
270/ZP |
Not started |
180
|
PATHASHREE-3 |
|
94 |
57-8-23-24 |
Construction of CC Road from Walipara to Nimdanga(Debupara), Gofanagar under Tapan PS. |
|
Kalyan Bose |
17/01/2024 |
₹4,276,925.00 |
21/02/2024 |
269/ZP |
Not started |
120
|
PATHASHREE-3 |
|
95 |
57-7-23-24 |
Construction of Metal road from Jigakuri more(adjacent to Jigakuri Cremation ground) to Munglishpur MSK via Jonglakali Para under Mohana GP in P.S. Kumarganj. |
|
PABAN BASAK |
17/01/2024 |
₹6,302,282.00 |
21/02/2024 |
268/ZP |
Not started |
180
|
PATHASHREE-3 |
|
96 |
57-6-23-24 |
Construction of CC Road from Barmahar to Ekdala, Vill-Ekdala, Beroil GP in P.S. Kushmandi. |
|
Kalyan Bose |
17/01/2024 |
₹2,358,895.00 |
21/02/2024 |
267/ZP |
Not started |
120
|
PATHASHREE-3 |
|
97 |
57-5-23-24 |
Construction of CC Road from Vior(Maayer Sthan) to Nababnagar BT Road, Gurail GP in P.S. Tapan. |
|
Kalyan Bose |
17/01/2024 |
₹5,150,199.00 |
21/02/2024 |
266/ZP |
Not started |
120
|
PATHASHREE-3 |
|
98 |
57-4-23-24 |
Construction of CC Road from Shibtala to Patkola Bridge, Mahadebpur Dwipkhanda under Tapan P.S. |
|
Kalyan Bose |
17/01/2024 |
₹6,161,245.00 |
21/02/2024 |
265/ZP |
Not started |
120
|
PATHASHREE-3 |
|
99 |
56-9-23-24 |
Construction of Metal Road from Belal Sarkar @ Bidyut Sarkar’s House towards Rasulpur BSF Camp under Samjia GP in P.S. Kumarganj. |
|
PABAN BASAK |
17/01/2024 |
₹7,713,266.00 |
21/02/2024 |
264/ZP |
Not started |
180
|
PATHASHREE-3 |
|
100 |
56-7-23-24 |
Construction of CC Road from Minapara Primary School to house of Subir Prodhan , GP-Akcha, Vill-Minapara in P.S. KUshmandi |
|
Suhita Paul |
17/01/2024 |
₹8,555,685.00 |
21/02/2024 |
263/ZP |
Not started |
120
|
PATHASHREE-3 |
|
101 |
56-6-23-24 |
Construction of Black top Road from Ushaharan road to Langalbhanga village, Akcha GP in P.S. Kushmandi. |
|
Suhita Paul |
17/01/2024 |
₹4,649,715.00 |
21/02/2024 |
262/ZP |
Not started |
180
|
PATHASHREE-3 |
|
102 |
56-5-23-24 |
Construction of CC Road from Ekdala Mouza to Ranipur Mouza, GP Beroil, Vill-Ekdala in P.S. Kushmandi. |
|
Kalyan Bose |
17/01/2024 |
₹4,883,990.00 |
21/02/2024 |
261/ZP |
Not started |
120
|
PATHASHREE-3 |
|
103 |
56-4-23-24 |
Construction of CC Road from Ratanpur More towards Bisrail High School in P.S. Gangarampur. GP_ Nandanpur |
|
PABAN BASAK |
17/01/2024 |
₹8,545,864.00 |
21/02/2024 |
260/ZP |
Not started |
120
|
PATHASHREE-3 |
|
104 |
56-3-23-24 |
Construction of CC Road from Kalitala towards Tarultala at Kataban Sansad in P.S. Gangarampur.GP-Sukdevpur |
|
PABAN BASAK |
17/01/2024 |
₹8,033,739.00 |
21/02/2024 |
259/ZP |
Not started |
120
|
PATHASHREE-3 |
|
105 |
56-1-23-24 |
Construction of CC Road from Gazi Fakir House end towards Nimpur Santal Para, Katrail, Gurial in P.S. Tapan |
|
Kalyan Bose |
17/01/2024 |
₹7,437,150.00 |
21/02/2024 |
258/ZP |
Not started |
120
|
PATHASHREE-3 |
|
106 |
55-16-23-24 |
Installation of solar Street light at Sekenderpur Sansad, Gangaji manja under Maligoan G.P., Mahato Tea shop, Vaktipur Chourasta, Kalitala more, Hachol Club under Beroil G.P., Mira para, Banihari, Uttar para, Vasna under Kushmandi G.P., Tejihar, Baro Gachiya, kalikamora under Kalikamora G.P.. P.S.-Kushmandi,Dist-Dakshin Dinajpur-68385056 |
|
Kalyan Bose |
09/01/2024 |
₹1,243,133.00 |
04/03/2024 |
349/ZP |
Not started |
|
15th FC UN-TIED (23-24) (2nd Phase) |
|
107 |
55-15-23-24 |
Construction of CC Road from Kajikuri end towards Jahangir’s House and Budhu’s House(except old CC road) chakla under Bairhatta GP in P.S. Harirampur-69382742 |
|
Kalyan Bose |
09/01/2024 |
₹1,165,384.00 |
04/03/2024 |
348/ZP |
Not started |
90
|
15th FC -TIED (23-24) (1st Phase) |
|
108 |
55-14-23-24 |
Installation of Solar Powered Water ATM infront of West Maheshpur(Deyalpur) near Masjit vill- West Maheshpur GP-Bolla under Balurghat Block-69809345 |
|
PABAN BASAK |
09/01/2024 |
₹527,774.00 |
04/03/2024 |
347/ZP |
Not started |
60
|
15th FC -TIED (23-24) (1st Phase) |
|
109 |
55-13-23-24 |
Construction of CC Road from Fulbari Busstand towards Fulbari Market(Beboshyee Samiti) under Uday GP in P.S. Gangarampur-38342660 |
|
PABAN BASAK |
09/01/2024 |
₹1,456,731.00 |
04/03/2024 |
346/ZP |
Not started |
90
|
15th FC -TIED (23-24) (1st Phase) |
|
110 |
|
Construction of CC Road from Fajlu Rahaman House towards Baso Hembrom House under Pundari GP in P.S. Harirampur-70882132 |
|
|
01/01/1970 |
₹0.00 |
01/01/1970 |
|
Not started |
|
|
|
111 |
55-11-23-24 |
Construction of CC Road from Dhnaipur Seku Shek house towards Football Math road via Keptur House with Edgaha link road Bagichapur GP in P.S. Harirampur-68310000 |
|
Kalyan Bose |
09/01/2024 |
₹1,454,932.00 |
04/03/2024 |
344/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) (2nd Phase) |
|
112 |
55-10-23-24 |
Construction of Community Toilet infront of Sri Nigomanada Sarswata Sangha in Danga GP in P.S. Balurghat-69391571 |
|
PABAN BASAK |
09/01/2024 |
₹990,196.00 |
04/03/2024 |
343/ZP |
Not started |
90
|
15th FC -TIED (23-24) (1st Phase) |
|
113 |
55-09-23-24 |
Construction of Community Toilet infront of Vivekananda Girls High School in Patiram GP under Balurghat PS-69391140 |
|
PABAN BASAK |
09/01/2024 |
₹990,196.00 |
04/03/2024 |
342/ZP |
Not started |
90
|
15th FC -TIED (23-24) (1st Phase) |
|
114 |
55-06-23-24 |
Construction of CC Road from Jetra Soren House towards end of Ramchandrapur Mouza, GP_Maligaon in P.S. Kushmandi-70370625 |
|
Kalyan Bose |
09/01/2024 |
₹989,745.00 |
04/03/2024 |
341/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) (2nd Phase) |
|
115 |
55-05-23-24 |
Construction of CC Road from Jharpukur more towards Murgamari FP School, GP_Ganguria in P.S. Banshihari-68310651 |
|
Kalyan Bose |
09/01/2024 |
₹692,745.00 |
04/03/2024 |
340/ZP |
Not started |
60
|
55-05-23-24 |
|
116 |
55-04-23-24 |
Construction of Boundary Wall at Fulbari High School, Fulbari under Uday GP in P.S. Gangarampur-71035790 |
|
PABAN BASAK |
09/01/2024 |
₹1,455,943.00 |
04/03/2024 |
339/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (2nd Phase) |
|
117 |
55-03-23-24 |
Construction of covered Drain from Moka Ram Mia Shop towards RK Builders near Chaloon GP in P.S. Gangarampur-68423488 |
|
PABAN BASAK |
09/01/2024 |
₹970,795.00 |
04/03/2024 |
338/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) (2nd Phase) |
|
118 |
55-02-23-24 |
Construction of CC Road from Jurahar Baro Masjid towards Jurahar Pucca Road at Brajaballavpur GP in P.S. Banshihari-68312548 |
|
Kalyan Bose |
09/01/2024 |
₹1,553,298.00 |
04/03/2024 |
337/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) (2nd Phase) |
|
119 |
55-01-23-24 |
Installation of Solar Street Light front side of Ramkrishnapur to Chandpur village(muslimpara) in P.S. Kumarganj.-70375179 |
|
PABAN BASAK |
09/01/2024 |
₹1,381,259.00 |
04/03/2024 |
336/ZP |
Not started |
60
|
15th FC -TIED (23-24) (1st Phase) |
|
120 |
54-17-23-24 |
Installation of Solar Street Light front side of Ujil Sansad, Betahar, Kesobpur, Khantapara and Makail GP-Karanji in P.S. Kushmandi-70386665 |
|
Nihar Ghosh |
09/01/2024 |
₹460,420.00 |
04/03/2024 |
335/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
121 |
54-16-23-24 |
Installation of Solar Street Light front side of Barampur IDgha math and road side GP-Hazatpur in P.S. Tapan-70890385 |
|
Nihar Ghosh |
09/01/2024 |
₹736,671.00 |
04/03/2024 |
334/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
122 |
54-15-23-24 |
Installation of Mini Mast with LED Solar Street Light at Gupinathpur GP-Ajmatpur in P.S. Tapan-70385254 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
333/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
123 |
54-14-23-24 |
Installation of Mini Mast with LED Solar Street Light at Panchagram Bazar, GP_ Udau in P.S. Gangarampur-68376462 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
332/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
124 |
54-13-23-24 |
Installation of Mini Mast with LED Solar Street Light at Nehamba Bazar, GP- Ashokgram in P.S - Gangarampur-68376272 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
331/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
125 |
54-12-23-24 |
Installation of Mini Mast with LED Solar Street Light at Sarada Shisu Mandir beside Thangapara High School, GP-Belbari-II in P.S. Gangarampur.- 68374999 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
330/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
126 |
54-11-23-24 |
Installation of Solar Powered infront of Daulatpur FP School GP-Ganguria under Bnabshihari PS-69615067 |
|
Nihar Ghosh |
09/01/2024 |
₹543,198.00 |
04/03/2024 |
329/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
127 |
54-10-23-24 |
Installation of Solar Powered water ATM in front of Nichinta Madressa mat at Nichinta under Harsura GP in P.S. Tapan-69619006 |
|
Kalyan Bose |
09/01/2024 |
₹529,769.00 |
04/03/2024 |
328/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
128 |
54-09-23-24 |
Construction of Covered Drain from Deor High School to North Side culvert with soak pit under Deor GP in P.S. Kumarganj-70795931 |
|
Somnath Kuiry |
09/01/2024 |
₹971,153.00 |
04/03/2024 |
327/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
129 |
54-07-23-24 |
Supply of safe drinking water providing Water ATM at front side of Pirmajar, GP-Mahabri under banshihari PS.-52228722 |
|
Suhita Paul |
09/01/2024 |
₹543,198.00 |
04/03/2024 |
326/ZP |
Not started |
60
|
15th FC TIED (2022-2324) |
|
130 |
54-06-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Sahidul Miah in GP-Rampara Chenchra, P.S. Tapan-71012900 |
|
Nihar Ghosh |
09/01/2024 |
₹871,692.00 |
04/03/2024 |
325/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
131 |
54-05-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Bimal Das in GP-Damdama in P.S. Gangarampur-71008222 |
|
Nihar Ghosh |
09/01/2024 |
₹871,692.00 |
04/03/2024 |
324/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
132 |
54-04-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Paimuddin Miah in GP-Damdama in P.S. Gangarampur-71009130 |
|
Nihar Ghosh |
09/01/2024 |
₹871,692.00 |
04/03/2024 |
323/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
133 |
53-1-23-24 |
Design, manufacturing, supply, delivery & commissioning of 4-wheeled Trailer Mounted 3000 Ltr. Cesspool Emptier or Sewer Suction Machine (Detail Specification in Annexure-I) |
|
Kalyan Bose |
01/12/2023 |
₹942,000.00 |
27/02/2024 |
285/ZP |
Not started |
15
|
15th FC TIED (20-21) |
|
134 |
52-06-23-24 |
Construction of BT Road from Muripukur(PMGY) to House of Makbul Tappo via House of Suka Master vill of Bandighi under Harsura GP in P.S. Tapan. L- 0.89 KM |
|
Kalyan Bose |
28/11/2023 |
₹2,733,311.00 |
20/02/2024 |
253/ZP |
Not started |
90
|
RASTASHREE - II |
|
135 |
52-02-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Susanta Saha, Maligaon GP under Kushmandi Block-66445424 |
|
Nihar Ghosh |
28/11/2023 |
₹770,406.00 |
20/02/2024 |
252/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
136 |
52-02-23-24 |
Repairing and Maintenance of BT road from Karai Chanchera High School more(Murshidabad road) to Tapan new Integrated School in P.S. Tapan |
|
Kalyan Bose |
28/11/2023 |
₹1,485,294.00 |
20/02/2024 |
439/ZP |
Not started |
90
|
Repair & Maintenance of rural road |
|
137 |
52-01-23-24 |
Repairing and Maintenance of Bridge wing Wall and adjacent of road of Disnagar Khari Bridge, GP-Bhour in P.S. Kumarganj |
|
Somnath Kuiry |
28/11/2023 |
₹1,019,751.00 |
20/02/2024 |
251/ZP |
Not started |
90
|
Repair & Maintenance of rural road |
|
138 |
51-14-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Goutam Roy in GP-Belbari-I in P.S. Gangarampur-71005839 |
|
Nihar Ghosh |
28/11/2023 |
₹871,692.00 |
20/02/2024 |
250/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
139 |
51-13-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Dipankar Roy in GP-Nandanpur in P.S. Gangarampur-71006582 |
|
Nihar Ghosh |
28/11/2023 |
₹871,692.00 |
20/02/2024 |
249/ZP |
Not started |
|
15th FC TIED (2023-24) |
|
140 |
51-07-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Minal Kanti Sarkar in GP-Bhour, P.S. Kumarganj-71017880 |
|
Nihar Ghosh |
28/11/2023 |
₹0.00 |
20/02/2024 |
248/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
141 |
51-06-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Majidur Rahaman Mondal in GP-Bhour, P.S. Kumarganj-71017170 |
|
Nihar Ghosh |
28/11/2023 |
₹781,421.00 |
20/02/2024 |
247/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
142 |
51-05-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Majidur Rahaman Mondal in GP-Bhour, P.S. Kumarganj-71017170 |
|
Nihar Ghosh |
28/11/2023 |
₹781,421.00 |
20/02/2024 |
247/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
143 |
51-04-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Ratan Hazra S/o Bital Hazra in GP-Ramchandrapur, P.S. Tapan-71013608 |
|
Nihar Ghosh |
01/01/1970 |
₹871,692.00 |
20/02/2024 |
245/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
144 |
51-03-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Joysna Sarkar in GP-Bolla, P.S. Balurghat-71021659 |
|
Nihar Ghosh |
28/11/2023 |
₹735,328.00 |
01/01/1970 |
244/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
145 |
51-02-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Bishwajit Ghosh in GP-Boaldar P.S. Balurghat-71002554 |
|
Nihar Ghosh |
28/11/2023 |
₹735,328.00 |
20/02/2023 |
243/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
146 |
51-01-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Monoj Kr. Nath in GP-Bolla, P.S. Balurghat-71022357 |
|
Nihar Ghosh |
28/11/2023 |
₹735,328.00 |
20/02/2024 |
242/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
147 |
50-06-23-24 |
Construction of CC Road From Manikore Borodangi Road towards Sukumar Sarkar House in P.S. Kushmandi. |
|
Suhita Paul |
10/11/2023 |
₹2,179,217.00 |
20/02/2024 |
241/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
148 |
50-05-23-24 |
Blacktop road from Kandarpur to Pajidar Rahaman’s House under Ganguria GP in P.S. Banshihari. |
|
Suhita Paul |
10/11/2023 |
₹3,882,653.00 |
20/02/2024 |
240/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
149 |
50-04-23-24 |
Blacktop road from Dakshin Bahadurpur MR Dealer Shop towards Maheshpur via Mijan’s house in P.S. harirampur. |
|
Kalyan Bose |
10/11/2023 |
₹5,826,923.00 |
20/02/2024 |
239/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
150 |
50-03-23-24 |
Construction of CC Road From Pacca Road near Anisur master’s House to Uttar Kuraha(Buradanga village) under Bhour GP in P.S. Kumarganj. |
|
Somnath Kuiry |
10/11/2023 |
₹3,884,615.00 |
20/02/2024 |
238/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|