301 |
32-04-2023 |
Construction of Community Toilet at Baul Bazar in GP- Bolla under Balurghat 47396132 |
|
PABAN BASAK |
21/12/2022 |
₹1,366,470.00 |
15/02/2022 |
195/ZP |
Not started |
90
|
15th FC UN TIED 21-22 |
|
302 |
29-01-2022-23 |
Construction of Public Health Units(BPHUs) at Harirampur RH(C) Internal Electrification work. |
|
Nihar Ghosh |
16/12/2022 |
₹353,698.00 |
15/02/2023 |
193/ZP |
23/02/2023 |
Scheme Completed: 03/07/2023 |
XV FC-Health Grants for FY-2021-22 |
|
303 |
33-03-2022-23 |
Installation of LED Street Light(High Mast) at Barahar BPHC at Safanagar GP in P.S. Kumarganj Dist- Dakshin Dinajpur. |
|
Nihar Ghosh |
22/12/2023 |
₹602,115.00 |
15/02/2023 |
206/ZP |
15/03/2023 |
Scheme Completed: 20/05/2023 |
15th FC Un-TIED-2020-21(supplementary) |
|
304 |
33-01-2022-23 |
Repairing of High and Mini Mast (Electrical) Light in different block, GP and Villages, (Fulbari, Bagichapur, Kushmandi, Bairahatta, Gacchiar, Deor etc)-14 nos. Dist- Dakshin Dinajpur |
|
Nihar Ghosh |
22/12/2023 |
₹1,415,942.00 |
15/02/2023 |
205/ZP |
07/03/2023 |
Scheme Completed: 10/05/2023 |
15th FC Un-TIED-2020-21(supplementary) |
|
305 |
38-09-2022-23 |
Construction of Community Sanitary Complex at front side of Raikhand Khariji Madrasha GP Jakirpur in P.S. Kumarganj.-58587207 |
|
Somnath Kuiry |
19/01/2023 |
₹970,874.00 |
15/02/2023 |
204/ZP |
Not started |
45
|
15th FC TIED (22-23) |
|
306 |
40-01-2023 |
Construction of Covered Drain from Gombhira Tola towards Sarsa Pond in P.S. Tapan.-58338963 |
|
Somnath Kuiry |
19/01/2023 |
₹728,365.00 |
15/02/2023 |
203/ZP |
18/04/2023 |
Scheme Completed: 30/06/2023 |
15th FC TIED (22-23) |
|
307 |
38-09-2022-23 |
Construction of CC Road from Jafarail Molla House to Jharpukur via Sayastabad Altab Miah House, Banshihari, Ganguria Goyalkuri/Sayastabad-57729446 |
|
Suhita Paul |
19/01/2023 |
₹971,154.00 |
23/02/2023 |
249/ZP |
23/04/2023 |
Scheme Completed: 26/06/2023 |
15th FC UN-TIED (22-23) |
|
308 |
38-07-2022-23 |
Construction of CC Road from Amal Ch. Mandal House towards Hamidur Sarkar House via Mafijuddin Miah in P.S. Tapan.-57719285 |
|
Somnath Kuiry |
19/01/2023 |
₹971,154.00 |
15/02/2023 |
201/ZP |
21/03/2023 |
Scheme Completed: 19/05/2023 |
15th FC UN-TIED (22-23) |
|
309 |
38-04-2022-23 |
Construction of CC Road from Palbhabanipur Footbal Math to Madan Barman House under Sayedpur GP in P.S. Harirampur.-57721927 |
|
Kalyan Bose |
19/01/2023 |
₹679,808.00 |
23/02/2023 |
248/ZP |
27/02/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED (22-23) |
|
310 |
38-03-2022-23 |
Construction of CC Road from HARIBASAR VIA Karno Barman House to Budhu Barman House under Gokarno GP in P.S. Harirampur.-57721561 |
|
Kalyan Bose |
19/01/2023 |
₹970,717.00 |
15/02/2023 |
199/ZP |
20/02/2023 |
45
Days Left:-396
|
15th FC UN-TIED (22-23) |
|
311 |
38-02-2022-23 |
Construction of CC Road from Sing Para towards Khichuripara under Belbari-I in P.S. Gangarampur. |
|
Kalyan Bose |
19/01/2023 |
₹971,154.00 |
15/02/2023 |
198/ZP |
16/02/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED (22-23) |
|
312 |
29-02-2022-23 |
Construction of Public Health Units(BPHUs) at Tapan RH(C) Internal Electrification work. |
|
Nihar Ghosh |
16/12/2022 |
₹353,698.00 |
15/02/2023 |
194/ZP |
23/02/2023 |
Scheme Completed: 09/08/2023 |
XV FC-Health Grants for FY-2021-22 |
|
313 |
19-01-2022-23 |
Construction of Public Health Units(BPHUs) at Harirampur RH(C) Internal Electrification work. |
|
Nihar Ghosh |
16/12/2022 |
₹353,698.00 |
15/02/2023 |
193/ZP |
24/02/2023 |
90
Days Left:-347
|
XV FC-Health Grants for FY-2021-22 |
|
314 |
13-05-20220-21 |
Drinking water providing wate ATM at Chourapara near Nripen Sarkar house, Vill - Chourapara, GP- Danga, under Balurghat PS |
|
SMRITI CHANDRA KARMAKAR |
30/12/2020 |
₹543,846.00 |
06/02/2021 |
317/Engg/ZP |
02/08/2021 |
45
Days Left:-963
|
15th FC Tied |
|
315 |
02-04-2022-23 |
Construction of CC Road from Haridas Barman House towards Kamal Besra House in P.S. Tapan. |
|
Somnath Kuiry |
20/04/2022 |
₹1,942,308.00 |
29/09/2022 |
1000/ZP |
06/01/2023 |
Scheme Completed: 03/03/2023 |
15th FC 2021-2022 Un-tied |
|
316 |
09-10-2021-22 |
Construction of CC Road from Telikuri PMGSY Road via Milghar(1st Phase) under Ellahabad GP in P.S. Banshihari |
|
Suhita Paul |
08/02/2022 |
₹485,577.00 |
06/05/2022 |
408/ZP |
30/06/2022 |
Scheme Completed: 28/03/2023 |
Repair/Maintenance of Rural Roads |
|
317 |
03-07-2021-22 |
Construction of Covered Drain from Daulatpur Vim Roy House to Madan Laha’s House in P.S. Banshihari. |
|
Suhita Paul |
01/01/1970 |
₹606,971.00 |
12/03/2021 |
512/ZP |
25/12/2021 |
Scheme Completed: 25/02/2023 |
15th FC Tied 20-21 |
|
318 |
22-01-2022-23 |
Internal Electrification Work at the RTE Production & Supply unit in Kamarpara Operated by Nabachetana Sangha Bahumukhi Samabay Samiti Ltd., Balurghat , Dakshin DInajpur. |
|
Nihar Ghosh |
09/09/2022 |
₹155,828.00 |
06/12/2022 |
1172/ZP |
15/12/2022 |
Scheme Completed: 09/02/2023 |
RTE |
|
319 |
23-15-2022-23 |
Construction of Public Samshan Ghat(Crematorium) beside Baul Khari in GP Bolla under Balurghat PS-47460841 |
|
PABAN BASAK |
20/10/2022 |
₹990,196.00 |
16/01/2023 |
60/ZP |
Not started |
60
|
15th FC 2021-22 Un-Tied |
|
320 |
23-14-2022-23 |
Internal Electrification Work of EVM Ware House(Three Storied) beside Minority Building at Balurghat District Collectorate Campus, Dakshin Dinajpur. |
|
Nihar Ghosh |
20/10/2022 |
₹990,439.00 |
16/01/2023 |
59/ZP |
Not started |
365
|
EVM/VVPAT Warehouses Fund |
|
321 |
23-12-2022-23 |
Supply of Safe Drinking Water by Installation of Solar Based Overhead Water Tank near Biharipara Mandir, Vill-Fatepur, GP-Jalghar under Balurghat P.S.-44811317 |
|
PABAN BASAK |
20/10/2022 |
₹971,153.00 |
16/01/2023 |
58/ZP |
Not started |
180
|
15th FC 2020-21 Tied |
|
322 |
23-09-2022-23 |
INTERNAL ELECTRICAL WORKS FOR Block Public Health Unit (BPHU) at Kumarganj RH |
|
Nihar Ghosh |
20/10/2023 |
₹623,951.00 |
16/01/2023 |
57/ZP |
Not started |
|
365 |
|
323 |
23-08-2022-23 |
INTERNAL ELECTRICAL WORKS FOR Block Public Health Unit (BPHU) at Kushmandi RH |
|
Nihar Ghosh |
20/10/2022 |
₹623,951.00 |
16/01/2023 |
56/ZP |
Not started |
365
|
XV-FC HG During the Year 2022-2023 |
|
324 |
23-04-2022-23 |
Construction of covered drain from Douyakuri Village to Moktar House in P.S. Banshihari |
|
Suhita Paul |
20/10/2022 |
₹684,716.00 |
16/01/2023 |
55/ZP |
20/02/2023 |
Scheme Completed: 11/05/2023 |
15th FC 2021-2022 -tied |
|
325 |
23-03-2022-23 |
Construction of Covered Drain from Anup Sen House to Tower More under Boalder GP in P.S. Balurghat. |
|
PABAN BASAK |
20/10/2022 |
₹396,078.00 |
16/01/2023 |
54/ZP |
23/01/2023 |
Scheme Completed: 15/03/2023 |
15th FC 2021-2022 -tied |
|
326 |
23-02-2022-23 |
Installation of LED Street Light(High Mast Tower) at in front of Adarsha Academy Pransagar, Chaloon GP in P.S. Gangarampur, Dist- Dakshin Dinajpur. |
|
Nihar Ghosh |
20/10/2022 |
₹580,485.00 |
16/01/2023 |
53/ZP |
02/02/2023 |
Scheme Completed: 27/03/2023 |
15th FC 2021-2022 Un-tied |
|
327 |
23-01-2022-23 |
Installation of LED Solar Street Light(i) infront of Saprondighi Bazar, Basuria GP(ii) Panjul Hatkhola, Panjul GP (iii) in front of Maharajpur Bazar, Belbari-II GP(iv) Profulla Roy House Nadipar, Belbari –I GP |
|
Nihar Ghosh |
20/10/2022 |
₹349,607.00 |
16/01/2023 |
52/ZP |
28/01/2023 |
Scheme Completed: 08/02/2023 |
15th FC 2021-2022 Un-tied |
|
328 |
20-03-2022-23 |
CC road from Dipak Halder House towards Rahaman(Raman) Dighi Jalalpur under Belbari-II Gp in P.S. Gangarampur.-47439056 |
|
Kalyan Bose |
30/08/2022 |
₹485,576.00 |
16/01/2023 |
61/ZP |
27/03/2023 |
Scheme Completed: 12/06/2023 |
15th FC untied 21-22 |
|
329 |
23-05-2022-23 |
Internal Electrification work Northern Side of 2nd floor of DRDC building (District Traffic Office) under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur(Electrical Work) |
|
Nihar Ghosh |
20/10/2022 |
₹187,624.00 |
11/01/2023 |
44/ZP |
14/01/2023 |
Scheme Completed: 12/05/2023 |
Own |
|
330 |
21-09-2022-23 |
Construction of Waiting Shed at Pandeyparea under Belbari-IGP in P.S. Gangarampur.-47460419 |
|
Kalyan Bose |
30/08/2022 |
₹291,693.00 |
12/12/2022 |
1222/ZP |
10/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC Un-TIED 2021-22 |
|
331 |
21-06-2022-23 |
Construction of Covered Drain from Kader Miah House towards Osman Miah House, Sidlim under Chaloon GP in P.S. Gangarampur.-47400171 |
|
Kalyan Bose |
30/08/2022 |
₹291,202.00 |
12/12/2022 |
1220/ZP |
02/03/2023 |
Scheme Completed: 12/06/2023 |
15th FC TIED 2021-22 |
|
332 |
21-05-2022-23 |
Construction of Covered Drain from Najrul Islam Land towards Eidgha Mat, Jachi under Chaloon GP in P.S. Gangarampur.-47400077 |
|
Kalyan Bose |
30/08/2022 |
₹291,202.00 |
12/12/2022 |
1219/ZP |
25/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC TIED 2021-22 |
|
333 |
20-07-2022-23 |
Construction of Covered Drain from Rama Majumder House to Bikash Chakraborty House at Dharanda Village of Hili GP in Hili Panchayat Samity-52228418 |
|
PABAN BASAK |
30/08/2022 |
₹2,913,462.00 |
12/12/2022 |
1218/ZP |
02/03/2023 |
120
Days Left:-311
|
15th FC TIED 2021-22 |
|
334 |
20-06-2022-23 |
Construction of Covered Drain from Juran Sarkar House to Uppal Ghode House under Mahabari GP in P.S. Banshihari.-47403074 |
|
Suhita Paul |
30/08/2022 |
₹582,524.00 |
12/12/2022 |
1217/ZP |
03/03/2023 |
Scheme Completed: 11/08/2023 |
15th FC TIED 2021-22 |
|
335 |
20-05-2022-23 |
Construction of Covered Drain from Samsia FP School School to Anisur Rahaman’s via Lutfar Rahaman’s House in P.S. Kushmandi-47401861 |
|
Suhita Paul |
30/08/2022 |
₹2,913,462.00 |
12/12/2022 |
1216/ZP |
Not started |
120
|
15th FC TIED 2021-22 |
|
336 |
20-04-2022-23 |
Construction of Covered Drain from Muradpur village to Pucca Road under Mahabari GP in P.S. Banshihari.-47402168 |
|
Suhita Paul |
30/08/2022 |
₹582,524.00 |
12/12/2022 |
1215/ZP |
Not started |
90
|
15th FC TIED 2021-22 |
|
337 |
20-02-2022-23 |
Construction of CC Road from Apan Roy towards Banu Miah Land under Jahangirpur GP in P.S. Gangarampur-47437966 |
|
Kalyan Bose |
30/08/2022 |
₹485,569.00 |
12/12/2022 |
1214/ZP |
22/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED 2021-22 |
|
338 |
20-01-2022 |
Construction of CC Road from Anarul Miya House towards Abeskuri PMGSY road via Debnath Para, Belestholi under Basuria GP in P.S. Gangarampur-47406388 |
|
Kalyan Bose |
30/08/2022 |
₹971,139.00 |
12/12/2022 |
1213/ZP |
27/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC UN-TIED 2021-22 |
|
339 |
19-13-2022-23 |
Construction of CC Road from Guljar Miya House to Ainal Miya House, Chalunda under Uday GP in P.S. Gangarampur-47406185 |
|
Kalyan Bose |
24/08/2022 |
₹485,605.00 |
06/12/2022 |
1184/ZP |
12/12/2022 |
90
Days Left:-421
|
15th FC UN-TIED 2021-22 |
|
340 |
19-11-2022-23 |
CC Road from Adibashipara Nirmal House towards Chotokum, Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406752 |
|
Kalyan Bose |
24/08/2022 |
₹485,549.00 |
06/12/2022 |
1183/ZP |
12/12/2022 |
90
Days Left:-421
|
15th FC UN-TIED 2021-22 |
|
341 |
19-10-2022-23 |
CC Road from Rahaman Ali House towards Hasan Ali House(land), Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406834 |
|
Kalyan Bose |
24/08/2022 |
₹485,549.00 |
06/12/2022 |
1182/ZP |
12/12/2022 |
90
Days Left:-421
|
15th FC UN-TIED 2021-22 |
|
342 |
19-09-2022-23 |
Construction of CC Road from PMGSY road to Srirampur(Fajilpur) Baro Masjit Club in P.S. Banshihari.-47447919 |
|
Suhita Paul |
24/08/2022 |
₹1,165,369.00 |
06/12/2022 |
1181/ZP |
04/01/2023 |
Scheme Completed: 25/03/2023 |
15th FC UN-TIED 2021-22 |
|
343 |
19-08-2022-23 |
CC Road repairing from Ashokgram Bazar towards Garoya House under Ashokgram GP in P.S. Gangarampur-47405988 |
|
Kalyan Bose |
01/01/1970 |
₹485,575.00 |
06/12/2022 |
1180/ZP |
12/12/2022 |
90
Days Left:-421
|
15th FC UN-TIED 2021-22 |
|
344 |
19-07-2022-23 |
Construction of CC Road from Binod Roy House towards Paikepara FP School in vill-Dasul under Nazirpur ZP in P.S. Balurghat.-47448678 |
|
PABAN BASAK |
24/08/2022 |
₹1,188,235.00 |
06/12/2022 |
1179/ZP |
10/03/2023 |
Scheme Completed: 10/05/2023 |
15th FC UN-TIED 2021-22 |
|
345 |
19-06-2022-23 |
Construction of CC Road from Purba Para Aptar Haripukur Sahin Mission to Rabiul House via Ataur Mondal House in P.S. Hili.-47443474 |
|
Somnath Kuiry |
24/08/2022 |
₹776,923.00 |
06/12/2022 |
1178/ZP |
Not started |
90
|
15th FC UN-TIED 2021-22 |
|
346 |
19-05-2022-23 |
Construction of CC Road from Barampur Pur5ba Para to Moksed Ali via Dighi Para in P.S. Tapan.-47441544 |
|
Somnath Kuiry |
24/08/2022 |
₹388,462.00 |
06/12/2022 |
1177/ZP |
05/02/2023 |
Scheme Completed: 22/03/2023 |
15th FC UN-TIED 2021-22 |
|
347 |
19-04-2022-23 |
Construction of CC Road from Barampur FP School towards South Haritala in P.S. Tapan.-47441355 |
|
Somnath Kuiry |
24/08/2022 |
₹388,462.00 |
06/12/2022 |
1176/ZP |
05/02/2023 |
Scheme Completed: 23/03/2023 |
15th FC UN-TIED 2021-22 |
|
348 |
19-03-2022-23 |
Construction of CC Road from Patbanial towards Pacca Road in P.S. Tapan.-47442102 |
|
Somnath Kuiry |
24/08/2022 |
₹1,165,385.00 |
06/12/2022 |
1175/ZP |
07/02/2023 |
Scheme Completed: 10/05/2023 |
15th FC UN-TIED 2021-22 |
|
349 |
19-02-2022-23 |
Construction of CC Road from Abul Hossain House towards PMGSY road in P.S. Tapan.-47446085 |
|
Somnath Kuiry |
24/08/2022 |
₹2,427,885.00 |
06/12/2022 |
1174/ZP |
01/02/2023 |
Scheme Completed: 21/03/2023 |
15th FC UN-TIED 2021-22 |
|
350 |
19-01-2022-23 |
Construction of Cc Road from Sihol PWD Road to Mangal House via High School in P.S. Banshihari.-47447617 |
|
Suhita Paul |
24/08/2022 |
₹1,165,265.00 |
06/12/2022 |
1173/ZP |
27/01/2023 |
Scheme Completed: 17/03/2023 |
15th FC UN-TIED 2021-22 |
|
351 |
18-03-2022-23 |
Construction of EVM Ware house(Three Storied) behind SDO Gangarampur Office Building at Buniadpur, Dakshin Dinajpur, JL No-255, Plot No- 584, Mouza-Barail. |
|
Kalyan Bose |
18/08/2022 |
₹11,744,679.00 |
04/11/2022 |
1085/ZP |
10/12/2022 |
360
Days Left:-153
|
EVM/ Election |
|
352 |
17-08-2022-23 |
Repairing of Building (Ground Floor Repair and construction of rest part of roofat 1st floor) of Mahipal ZP Market Complex at Kushmandi.-44813810 |
|
Suhita Paul |
17/08/2022 |
₹679,808.00 |
04/11/2022 |
1084/ZP |
27/03/2023 |
Scheme Completed: 22/08/2023 |
15th FC Un-Tied 20-21 |
|
353 |
17-07-2022-23 |
Construction of Waiting Shed at Mahinipara Sashan under Belbari-I GP in P.S. Gangarampur.-44813849 |
|
Kalyan Bose |
17/08/2022 |
₹291,693.00 |
04/11/2022 |
1083/ZP |
10/01/2023 |
Scheme Completed: 12/06/2023 |
15th FC Un-Tied 20-21 |
|
354 |
17-06-2022 |
Construction of Waiting Shed at Nayabazar in P.S. Gangarampur- 44813859 |
|
PABAN BASAK |
17/08/2022 |
₹291,693.00 |
04/11/2022 |
1082/ZP |
11/02/2023 |
90
Days Left:-360
|
15th FC Un-Tied 20-21 |
|
355 |
17-04-2022-23 |
Construction of Community Toilet at beside MSK School, Vill-Jamalpur in P.S. Hili- 44811593 |
|
Somnath Kuiry |
17/08/2022 |
₹971,154.00 |
04/11/2022 |
1081/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
356 |
17-03-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Kharail Bazar, Vill-Kharail GP-Deor under Kumarganj PS.-44807447 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1080/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
357 |
17-02-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Chandganj Library, Vill-Chandganj GP-Safanagar under Kumarganj PS.-44811165 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1079/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
358 |
17-01-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Kumarganj College, Vill-Puntair GP-Bhor under Kumarganj PS.-44811125 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1078/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
359 |
16-10-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of the H/O Rouf Mondal, Vill-Kasurail, GP-Ramkrishnapur under Kumarganj PS.-44807556 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1077/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
360 |
16-09-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Rajua Kali Mandir, Vill-Rajua, GP-Boaldar under Balurghat PS.-44807036 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1076/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
361 |
16-08-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Kashilabati Masjid, Vill-Kashilabati, GP-Jalghar under Balurghat PS.-44807030 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1075/ZP |
Not started |
180
|
15th FC Tied 20-21 |
|
362 |
16-07-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Baharipara Temple, Vill-Fatepur, GP-Jalghar under Balurghat PS.-44806938 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1074/zp |
Not started |
180
|
15th FC Tied 20-21 |
|
363 |
16-06-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Ramkisku House, Vill-Belain, GP-Jalghar under Balurghat PS.-44804726 |
|
PABAN BASAK |
17/08/2022 |
₹543,846.00 |
04/11/2022 |
1073/ZP |
13/12/2022 |
180
Days Left:-330
|
15th FC Tied 20-21 |
|
364 |
16-05-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Puratan Gangarampur High School, Vill-Gangarampur, GP-Gangarampur under Gangarampur PS.-47383702 |
|
PABAN BASAK |
17/08/2022 |
₹534,135.00 |
04/11/2022 |
1072/zp |
01/01/2023 |
180
Days Left:-311
|
15th FC Tied 20-21 |
|
365 |
16-04-2022-23 |
Installation of Water Purification System at rasidpur Hospital in P.S. banshihari- 56430905 |
|
Suhita Paul |
17/08/2022 |
₹544,217.00 |
04/11/2022 |
1071/ZP |
04/01/2023 |
Scheme Completed: 27/07/2023 |
15th FC 20-21 Savings |
|
366 |
16-02-2022-23 |
Installation of Water PurifireMachine(Water ATM) at Baidya Tigga’s House(Tinmatha more), Vill- Raguhanbati, GP-Damdama under Gangarampur P.S.-55734841 |
|
PABAN BASAK |
17/08/2022 |
₹534,135.00 |
04/11/2022 |
1070/ ZP |
01/01/2023 |
Scheme Completed: 28/01/2024 |
15th FC 20-21 Savings |
|
367 |
15-02-2022 |
Construction of Block Public Health Unit (BPHU) at Kumarganj RH |
|
Somnath Kuiry |
12/08/2022 |
₹4,808,947.00 |
21/10/2022 |
1056/ZP |
Not started |
365
|
15th FC HG 22-23 |
|
368 |
15-01-2022-23 |
Construction of Block Public Health Unit (BPHU) at Kushmandi RH |
|
Suhita Paul |
12/08/2022 |
₹4,808,947.00 |
21/10/2022 |
1055/ZP |
Not started |
365
|
15th FC HG 22-23 |
|
369 |
12-07-2022 |
Installation of LED Street Light(High Mast Tower) at Hazratpur Madrasa Field, Hazratpur GP in P.S. Tapan, Dist- Dakshin Dinajpur |
|
Nihar Ghosh |
25/07/2022 |
₹580,485.00 |
06/12/2022 |
1171/ZP |
25/01/2023 |
Scheme Completed: 27/03/2023 |
15th FC Un -Tide 20-21 |
|
370 |
12-04-2022-23 |
Construction of Covered Drain from Kushmandi Jut Godown towards Samsia Khari in P.S. Kushmandi. |
|
Suhita Paul |
25/07/2022 |
₹971,153.00 |
12/06/2022 |
1170/ZP |
18/01/2023 |
Scheme Completed: 30/03/2023 |
15th FC Tide 21-22 |
|
371 |
11-07-2022-23 |
Construction of Covered Drain from DNT More towards Adibashipara in P.S. Tapan. |
|
Somnath Kuiry |
25/07/2022 |
₹971,154.00 |
12/06/2022 |
1169/ZP |
31/01/2023 |
Scheme Completed: 09/05/2023 |
15th FC Tied 21-22 |
|
372 |
11-06-2022-23 |
Installation of LED Street Light(High Mast Tower) at Dipkhanda FP School , Dipkhanda GP in P.S. Tapan, Dist- Dakshin Dinajpur |
|
Nihar Ghosh |
25/07/2022 |
₹580,485.00 |
12/06/2022 |
1168/ZP |
25/01/2023 |
Scheme Completed: 28/03/2023 |
15th FC Un-Tied 21-22 |
|
373 |
07-15-2020-21 |
Repair of road from Patharghata SBI towards Swasthyakendra via Burning Ghat under Mahabari GP in P.S. Banshihari |
|
Suhita Paul |
06/10/2020 |
₹4,367,380.00 |
24/02/2021 |
408/Engg/ZP |
27/02/2021 |
Scheme Completed: 08/08/2023 |
Repair/Maintenance of Rural Road other than BGSY during 2020-21 |
|
374 |
27-02-2020-21 |
Supply of safe drinking water by providing water ATM at Udaypur, GP - Udaypur under Kushmandi P.S. |
|
Suhita Paul |
18/02/2021 |
₹543,846.00 |
24/08/2021 |
228/Engg/ZP |
27/04/2022 |
45
Days Left:-695
|
15th FC Tied |
|
375 |
03-06-2021-22 |
Construction of covered drain from Mahammadpur Disharikura pond to Faigar Choudhuri house in P.S. Banshihari |
|
Suhita Paul |
24/09/2021 |
₹582,692.00 |
03/12/2021 |
511/ZP |
26/11/2022 |
Scheme Completed: 02/02/2023 |
15th FC Tied |
|
376 |
21-12-2020-21 |
Supply of Solar Based Over Head Running Drinking Water Near H/O Ramkisku, Vill-Beline, GP-Chakvrigu under P.S. Balurghat (Fund : 15th FC Tied) (ID - 44811304) |
K Bhattacharjee |
Kalyan Bose |
05/02/2021 |
₹971,154.00 |
25/02/2021 |
411/Engg/ZP |
28/03/2021 |
Scheme Completed: 02/11/2022 |
15th FC Tied |
|
377 |
13-09-2022-23 |
Drinking Water facility at Bhentara More by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1054/ZP |
Not started |
120
|
BADP |
|
378 |
13-08-2022-23 |
Drinking Water facility at Bhadrail Hatkhola by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Tapan. |
Jaydip Ray |
Somnath Kuiry |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1053/ZP |
Not started |
120
|
BADP |
|
379 |
13-07-2022-23 |
Drinking Water facility at Katabari High School by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi. |
Jaydip Ray |
Suhita Paul |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1052/ZP |
Not started |
120
|
BADP |
|
380 |
13-06-2022-23 |
Drinking Water facility at Jakirpur High School, by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kumarganj. |
Rana Ray |
PABAN BASAK |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1051/ZP |
Not started |
120
|
BADP |
|
381 |
13-05-2022-23 |
Drinking Water facility at Market, Udaypur by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi. |
Jaydip Ray |
Suhita Paul |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1050/ZP |
Not started |
120
|
BADP |
|
382 |
13-04-2022-23 |
Drinking Water facility at Balupara Fatepur High School by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Hili |
Rana Ray |
Somnath Kuiry |
10/08/2022 |
₹971,154.00 |
21/10/2022 |
1049/ZP |
Not started |
120
|
BADP |
|
383 |
13-03-2022-23 |
Drinking Water facility at Jalghar Bazar by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Tapan. |
Jaydip Ray |
Somnath Kuiry |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1048/ZP |
Not started |
120
|
BADP |
|
384 |
13-02-2022-23 |
Drinking Water facility at Sarbamangala High School, Basuria by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
10/08/2022 |
₹971,153.00 |
21/10/2022 |
1047/ZP |
Not started |
120
|
BADP |
|
385 |
12-05-2022-23 |
Construction of Covered Drain from Fulbari Bus-stand towards Dholu Kabiraj house (both side) under Uday GP in PS Gangarampur (ID 47405275) |
Jaydip Ray |
Kalyan Bose |
25/07/2022 |
₹2,717,962.00 |
21/10/2022 |
1046/ZP |
06/05/2023 |
75
Days Left:-291
|
15th FC 21-22 Tied |
|
386 |
12-03-2022-23 |
Construction of Cover Drain from Kashimaddin Sarkar House to Saidur Rahaman House in P.S. banshihari (ID 47400955) |
Jaydip Ray |
Suhita Paul |
25/07/2022 |
₹1,235,404.00 |
21/10/2022 |
1045/ZP |
06/02/2023 |
Scheme Completed: 02/05/2023 |
15th FC 21-22 Tied |
|
387 |
12-02-2022-23 |
Construction of covered drain from Hatanpara village to PMGSY Road in P.S. Banshihari (ID 47402807) |
Jaydip Ray |
Suhita Paul |
25/07/2022 |
₹586,086.00 |
21/10/2022 |
1044/ZP |
20/01/2023 |
Scheme Completed: 25/03/2023 |
15th FC 21-22 Tied |
|
388 |
11-12-2022-23 |
Construction of Covered Drain infront of Sitahar Bazar under Bhour GP in P.S. Kumarganj. (ID 52229125) |
Rana Ray |
Somnath Kuiry |
25/07/2022 |
₹1,188,235.00 |
21/10/2022 |
1043/ZP |
05/01/2023 |
Scheme Completed: 24/03/2023 |
15th FC 21-22 Tied |
|
389 |
11-11-2022-23 |
Construction of Covered Drain from Pachipukur to Ichamoti River under Jakirpur GP in P.S. Kumarganj. (ID 47401686) |
Rana Ray |
Somnath Kuiry |
25/07/2022 |
₹1,980,392.00 |
21/10/2022 |
1042/ZP |
24/11/2022 |
Scheme Completed: 30/05/2023 |
15th FC 21-22 Tied |
|
390 |
11-09-2022-23 |
Construction of Covered Drain from Kamarpara Hat under Amritakhanda GP in P.S. Balurghat. (ID 47404982) |
Rana Ray |
PABAN BASAK |
25/07/2022 |
₹1,485,294.00 |
21/10/2022 |
1041/ZP |
25/11/2022 |
Scheme Completed: 28/01/2024 |
15th FC 21-22 Tied |
|
391 |
11-08-2022-23 |
Construction of Covered Drain from Tapan RSP Parti Office towards Electric Office in P.S. Tapan. (ID 47405410) |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹2,202,577.00 |
21/10/2022 |
1040/ZP |
06/01/2023 |
Scheme Completed: 13/10/2023 |
15th FC 21-22 Tied |
|
392 |
11-03-2022-23 |
Construction of CC Road from Baghati Pacca Road via Molla Pukur towards Dinesh Orawn House in P.S. Tapan (ID 47452271) |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹776,923.00 |
21/10/2022 |
1039/ZP |
22/12/2022 |
Scheme Completed: 21/02/2023 |
15th FC 21-22 Un-Tied |
|
393 |
11-02-2022-23 |
Construction of CC Road from Ranjit Das House towards Khudibagan in P.S. Tapan (ID 47441909) |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹388,462.00 |
21/10/2022 |
1038/ZP |
24/11/2022 |
Scheme Completed: 05/02/2023 |
15th FC 21-22 Un-Tied |
|
394 |
11-01-2022-23 |
Construction of CC Road from Talpukur towards Saijudding Mondal in P.S. Tapan. |
Jaydip Ray |
Somnath Kuiry |
25/07/2022 |
₹776,923.00 |
21/10/2022 |
1037/ZP |
09/12/2022 |
Scheme Completed: 05/02/2023 |
15th FC 20-21 Savings |
|
395 |
01-06-2022-23 |
Construction of CC Road from Dangapara road to Ranipur PMGSY via Ekdala in PS Kushmandi |
Jaydip Ray |
Suhita Paul |
20/04/2022 |
₹582,692.00 |
09/09/2022 |
937/ZP |
05/12/2022 |
Scheme Completed: 25/02/2023 |
15th FC 20-21 Un Tied Savings |
|
396 |
04-12-2022-23 |
Construction of Covered Drain from Kushmandi Ganesh Jha house towards Uttam Roy’s House in P.S. Kushmandi. |
Jaydip Ray |
Suhita Paul |
20/04/2022 |
₹874,039.00 |
13/09/2022 |
949/ZP |
10/03/2023 |
Scheme Completed: 18/05/2023 |
15th FC 21-22 Tied |
|
397 |
02-10-2022-23 |
Construction of CC with Piling from Kalaiadanga More to Mamtaj Miya house under Safanagar GP in PS Kumarganj |
Rana Ray |
PABAN BASAK |
20/04/2022 |
₹1,485,294.00 |
09/09/2022 |
939/ZP |
20/10/2022 |
Scheme Completed: 20/01/2023 |
15 FC 21-22 Un-tied |
|
398 |
02-09-2022-23 |
Construction of CC Road from Sanjoy Das Mudi Khana Shop to Uttam Joarder House under Patiram GP in PS Balurghat |
Rana Ray |
PABAN BASAK |
20/04/2022 |
₹1,386,275.00 |
09/09/2022 |
938/ZP |
20/10/2022 |
Scheme Completed: 13/02/2023 |
15 FC 21-22 Un-tied |
|
399 |
03-05-2022-23 |
Construction of CC Road from Gour Nandi house to Ansar Ali house under Bagichapur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹390,150.00 |
14/09/2022 |
956/ZP |
22/10/2022 |
60
Days Left:-502
|
15 FC 21-22 Un-tied |
|
400 |
01-05-2022-23 |
Construction of CC Road from Battoki Gram Gola Bhabder towards Aampara, Malipara under Sayedpur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹678,810.00 |
09/09/2022 |
936/ZP |
22/10/2022 |
75
Days Left:-487
|
15 FC 21-22 Un-tied |
|
401 |
05-08-2022 |
Construction of Covered Drain from Harirampur Milon Debnath Dokan towards Thana more under Bagichapur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹1,456,061.00 |
13/09/2022 |
950/ZP |
21/10/2022 |
60
Days Left:-503
|
15 FC 21-22 Tied |
|
402 |
02-11-2022-23 |
Construction of CC Road from Chandipur High School to Pathaltal under Sayedpur GP in PS Harirampur |
Jaydip Ray |
Kalyan Bose |
20/04/2022 |
₹1,165,243.00 |
09/09/2022 |
940/ZP |
21/10/2022 |
60
Days Left:-503
|
15 FC 21-22 Un-tied |
|
403 |
09-04-2022-23 |
Estimate for SITC of Cubical Panel Board & 01 No. AC Machine of AEO Bunglow under DDZP |
Jaydip Ray |
Nihar Ghosh |
27/05/2022 |
₹106,395.00 |
08/07/2022 |
680/ZP |
11/07/2022 |
Scheme Completed: 27/01/2023 |
Own Fund |
|
404 |
09-03-2022-23 |
Internal Electrification Work of AEO Bunglow under DDZP(1st Phase-1st Floor & Out Door). |
Jaydip Ray |
Nihar Ghosh |
27/05/2022 |
₹459,053.00 |
08/07/2022 |
679/ZP |
11/07/2022 |
Scheme Completed: 27/01/2023 |
Own Fund |
|
405 |
09-02-2022-23 |
Construction of Boundary Wall & Land Development at AEO Bunglow of DDZP in P.S. Balurghat. |
Jaydip Ray |
PABAN BASAK |
27/05/2022 |
₹162,995.00 |
08/07/2022 |
678/ZP |
02/11/2022 |
Scheme Completed: 23/03/2023 |
Own Fund |
|
406 |
09-01-2022-23 |
Renovation of 2nd Floor of AEO Bunglow(2 Bed Room + attach Toilet+ Common Toilet + Kitchen) of DDZP in P.S. Balurghat |
Jaydip Ray |
PABAN BASAK |
27/05/2022 |
₹164,226.00 |
08/07/2022 |
677/ZP |
02/11/2022 |
Scheme Completed: 23/03/2023 |
Own Fund |
|
407 |
08-01-2022-23 |
Rectification of Damaged approach road of Gangarampur Govt. Polytechnic in P.S. Gangarampur |
Jaydip Ray |
Kalyan Bose |
25/05/2022 |
₹99,747.00 |
08/07/2022 |
676/ZP |
25/08/2022 |
Scheme Completed: 24/11/2022 |
Own Fund |
|
408 |
07-04-2022-23 |
Construction of Traffic Kiosk Building(Ground Floor) at Rampur, Dakshin Dinajpur |
Jaydip Ray |
Somnath Kuiry |
25/05/2022 |
₹971,090.00 |
05/07/2022 |
654/ZP |
29/11/2022 |
90
Days Left:-434
|
Road Safety Fund |
|
409 |
07-03-2022-23 |
Construction of Traffic Kiosk Building(Ground Floor) at Selimmabad, PS- Banshihari P.O- Buniadpur. |
Jaydip Ray |
Liton Sarkar |
25/05/2022 |
₹971,124.00 |
05/07/2022 |
653/ZP |
Not started |
90
|
Road Safety Fund |
|
410 |
07-01-2022-23 |
Repairing and maintenance of Zilla Parishad Building near Sukanta Bhaban at Buniadpur. |
Jaydip Ray |
Kalyan Bose |
25/05/2022 |
₹605,173.00 |
06/07/2022 |
657/ZP |
08/08/2022 |
90
Days Left:-547
|
Own Fund |
|
411 |
17-08-2019-2020 |
Construction of Water Purified plant for drinking water facility at Matais Bazar under Hili PS |
|
Somnath Kuiry |
18/03/2020 |
₹485,777.00 |
28/04/2020 |
98/Engg/ZP |
24/08/2022 |
Scheme Completed: 01/12/2023 |
BADP |
|
412 |
06-05-2022-23 |
Construction of CC Road from Ekdala towards Ranipur(balance portion) in P.S. Kushmandi. |
J. Ray |
Suhita Paul |
06/05/2022 |
₹1,122,235.00 |
27/07/2022 |
795/ZP |
01/09/2022 |
Scheme Completed: 05/01/2023 |
Repair Maintenance of rural road |
|
413 |
06-03-2022-23 |
Construction of CC Road from Jashor Main road towards Akhil Roy’s House(1st phase) under Mahabari GP in P.S. Banshihari. |
J. Ray |
Suhita Paul |
06/05/2022 |
₹485,577.00 |
27/07/2022 |
794/ZP |
14/11/2022 |
Scheme Completed: 24/01/2023 |
Repair Maintenance of rural road |
|
414 |
06-02-2022-23 |
Construction of CC Road from Jugal Roy House towards Shiv Mandir in P.S. Tapan |
J. Ray |
Somnath Kuiry |
06/05/2022 |
₹485,577.00 |
27/07/2022 |
793/ZP |
26/08/2022 |
Scheme Completed: 03/02/2023 |
Repair Maintenance of rural road |
|
415 |
06-01-2022-23 |
Construction of CC Road from Jhantu House towards Ancer Ali Poltri Farm in P.S. Tapan |
J. Ray |
Somnath Kuiry |
06/05/2022 |
₹485,577.00 |
27/07/2022 |
792/ZP |
06/01/2023 |
Scheme Completed: 13/07/2023 |
Repair Maintenance of rural road |
|
416 |
05-10-2022 |
Repair of Northern Portion of DRDC building (2nd floor only) for District Traffic Office under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur(Civil Work) |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹405,231.00 |
27/07/2022 |
791/ZP |
16/08/2022 |
Scheme Completed: 28/01/2024 |
OWN |
|
417 |
05-09-2022-23 |
Construction of Cover Drain from Barogachi Gicha Khan to Lasar Hansda House, Ganguria GP in P.S. Banshihari |
Jaydip Ray |
Suhita Paul |
20/04/2022 |
₹660,058.00 |
27/07/2022 |
790/ZP |
28/12/2022 |
Scheme Completed: 23/03/2023 |
15 FC 21-22 Tied |
|
418 |
05-07-2022-23 |
Construction of Covered Drain from Keshabpur FP School towards Ganesh house (Jahangirpur) in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹2,328,783.00 |
27/07/2022 |
788/ZP |
Not started |
75
|
15 FC 21-22 Tied |
|
419 |
04-10-2022-23 |
Construction of Covered Drain from Abul Kalams Culverts to Bipul Mondals Land under Najirpur GP in P.S. Balurghat |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹792,157.00 |
27/07/2022 |
786/ZP |
25/08/2022 |
Scheme Completed: 16/03/2023 |
15 FC 21-22 Tied |
|
420 |
04-07-2022-23 |
Construction of Covered Drain from Patiram Tripti Hotel to Atrai River under Patiram GP in P.S. Balurghat. |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹1,485,294.00 |
27/07/2022 |
785/ZP |
25/08/2022 |
Scheme Completed: 20/03/2023 |
15 FC 21-22 Tied |
|
421 |
04-04-2022-23 |
Construction of Covered Drain from Ishak Ali House towards Bilpukur Culvert in P.S. Tapan. |
J. Ray |
Somnath Kuiry |
20/04/2022 |
₹971,154.00 |
27/07/2022 |
784/ZP |
13/01/2023 |
Scheme Completed: 12/05/2023 |
15 FC 21-22 Tied |
|
422 |
04-02-2022-23 |
Construction of Covered Drain from Najrul House towards Palpara in P.S. Tapan. |
J. Ray |
Somnath Kuiry |
20/04/2022 |
₹485,577.00 |
27/07/2022 |
783/ZP |
20/09/2022 |
Scheme Completed: 20/01/2023 |
15 FC 21-22 Tied |
|
423 |
04-01-2022-23 |
Construction of Covered Drain from Majhikhanda Bottala Mogbul Dilar House towards Mijanur Rahaman House in P.S. Tapan. |
J. Ray |
Somnath Kuiry |
20/04/2022 |
₹485,577.00 |
27/07/2022 |
782/ZP |
20/09/2022 |
Scheme Completed: 20/01/2023 |
15 FC 21-22 Tied |
|
424 |
03-10-2022-23 |
Construction of road CC from Samsia More towards Basail More under P.S. Kushmandi. |
J. Ray |
Suhita Paul |
20/04/2022 |
₹1,553,846.00 |
27/07/2022 |
781/ZP |
01/09/2022 |
Scheme Completed: 17/03/2023 |
15 FC 21-22 Un-tied |
|
425 |
03-06-2022-23 |
Construction of CC Road from Sujit Roy house to Godoya Sau house (Belbari-I) in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹485,358.00 |
27/07/2022 |
780/ZP |
08/09/2022 |
60
Days Left:-546
|
15 FC 21-22 Un-tied |
|
426 |
03-04-2022-23 |
Construction of CC Road from Pulin Roy Nodighat to Kanduru Roy house (Belbari-I) in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹485,358.00 |
27/07/2022 |
778/ZP |
02/09/2022 |
60
Days Left:-552
|
15 FC 21-22 Un-tied |
|
427 |
03-0-2022-23 |
Construction of CC Road from Kailahar SSK School to Raju Mondal house under Uday GP in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹482,649.00 |
27/07/2022 |
777/ZP |
27/08/2022 |
60
Days Left:-558
|
15 FC 21-22 Un-tied |
|
428 |
03-01-2022-23 |
Construction of CC Road from Mahibur house towards Basakpara in PS Kushmandi |
J. Ray |
Suhita Paul |
20/04/2022 |
₹1,553,846.00 |
27/07/2022 |
776/ZP |
01/09/2022 |
Scheme Completed: 05/01/2023 |
15 FC 21-22 Un-tied |
|
429 |
02-08-2022-23 |
Construction of CC Road from Hachidul Mondal to Mainur Rahaman Mondal House under Nazirpur ZP in P.S. Balurghat |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹321,814.00 |
27/07/2022 |
772/ZP |
25/08/2022 |
Scheme Completed: 16/01/2023 |
15 FC 21-22 Un-tied |
|
430 |
02-07-2022-23 |
Construction of CC Road from Batun Bus Stand to Debhog via Raghunathpur in PS Kumarganj |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹990,196.00 |
27/07/2022 |
771/ZP |
Not started |
60
|
15 FC 21-22 Un-tied |
|
431 |
02-06-2022-23 |
Construction of CC Road from Chandpur CC road to Bandighi Khari under Deor GP in PS Kumarganj |
R. Ray |
Somnath Kuiry |
20/04/2022 |
₹1,456,731.00 |
27/07/2022 |
770/ZP |
25/08/2022 |
Scheme Completed: 21/04/2023 |
15 FC 21-22 Un-tied |
|
432 |
02-03-2022-23 |
Construction of CC Road from Saidul Ali House to Shakti Pahan house in P.S. Hili |
R. Ray |
Somnath Kuiry |
20/04/2022 |
₹971,154.00 |
27/07/2022 |
768/ZP |
25/08/2022 |
Scheme Completed: 20/02/2023 |
15 FC 21-22 Un-tied |
|
433 |
02-01-2022-23 |
Construction of CC Road from Nimai Orawn House towards Shibmandir in P.S. Tapan. |
J. Ray |
Somnath Kuiry |
20/04/2022 |
₹388,462.00 |
27/07/2022 |
764/ZP |
08/11/2022 |
Scheme Completed: 05/02/2023 |
15 FC 21-22 Un-tied |
|
434 |
01-13-2022-23 |
Repairing of Road from Biplab Roy house to Belbari primary junior Basic school,G.P. Belbari – 1, in p.s. Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹484,358.00 |
27/07/2022 |
767/ZP |
27/08/2022 |
Scheme Completed: 31/03/2023 |
Repair Maintenance of Rural road (Savings) fund |
|
435 |
01-12-2022-23 |
Construction of CC Road from Hamjapur more (Bikash Shil tea Shop) towards Shidminar via Lokman Ali house (Basuria) in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹582,730.00 |
27/07/2022 |
766/ZP |
27/08/2022 |
60
Days Left:-558
|
15th FC 2020-21 Supplimentary |
|
436 |
01-11-2022-23 |
Construction covered drain from Singadaha Uday Das's house to Bhola Chowdhury's house in PS Banshihari |
J. Ray |
Suhita Paul |
20/04/2022 |
₹824,444.00 |
27/07/2022 |
765/ZP |
07/12/2022 |
Scheme Completed: 15/03/2023 |
15th FC 2020-21 Supplimentary |
|
437 |
01-09-2022-23 |
Construction of Covered Drain from house of Mithun Chakraborty towards house of Sunil Das (Nitai Duktar – Post office, Jalalpur) in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹1,552,028.00 |
27/07/2022 |
763/ZP |
02/03/2023 |
75
Days Left:-356
|
15th FC 2020-21 Supplimentary |
|
438 |
01-08-2022-23 |
Construction of Covered Drain from house of Fulbari Bus-stand towards Budhyadeb Bharati house under Uday GP in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹291,202.00 |
27/07/2022 |
762/ZP |
17/01/2023 |
60
Days Left:-415
|
15th FC 2020-21 Supplimentary |
|
439 |
01-07-2022-23 |
Construction of Covered Drain from Deor bazaar at Anarul Miah’s Shop to East Side of Culvert under Deor GP in P.S. Kumarganj. |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹297,059.00 |
27/07/2022 |
761/ZP |
25/08/2022 |
Scheme Completed: 13/02/2023 |
15th FC 2020-21 Supplimentary |
|
440 |
01-04-2022-23 |
Construction of CC Road from Rabiul Sarkar house towards Rejaul Karim under Uday GP in PS Gangarampur |
J. Ray |
Kalyan Bose |
20/04/2022 |
₹628,157.00 |
27/07/2022 |
758/ZP |
27/08/2022 |
60
Days Left:-558
|
15th FC 2020-21 Supplimentary |
|
441 |
01-03-2022-23 |
Construction of CC Road from Shibtali Culvert to Durga Mandir under Jakirpur GP in PS Kumarganj |
R. Ray |
PABAN BASAK |
20/04/2022 |
₹594,118.00 |
27/07/2022 |
757/ZP |
25/08/2022 |
Scheme Completed: 06/11/2022 |
15th FC 2020-21 Supplimentary |
|
442 |
01-02-2022-23 |
Construction of CC Road from Habibur Rahaman House towards Moklechur Rahaman Pond In P.S. Tapan. |
J. Ray |
Somnath Kuiry |
20/04/2022 |
₹388,462.00 |
27/07/2022 |
756/ZP |
08/08/2022 |
Scheme Completed: 19/10/2022 |
15th FC 2020-21 Supplimentary |
|
443 |
01-03-2021-22 |
Construction of CC road from Sataish BGSY road to Shirohi FP School via Uchhakpur Transformer in P.S. - Balurghat |
K. Bhattacharya |
PABAN BASAK |
15/09/2021 |
₹1,740,000.00 |
26/05/2022 |
500/ZP |
01/06/2022 |
Scheme Completed: 14/03/2023 |
15 FC 20-21 Untied |
|
444 |
13-02-2021-22 |
Construction of Public Health Units(BPHUs) at Harirampur RH.A) Civil Work B) Sanitary & Plumbing Work |
Jaydip Ray |
Kalyan Bose |
02/02/2022 |
₹4,752,799.00 |
06/04/2022 |
309/ZP |
17/05/2022 |
365
Days Left:-355
|
15 FC Health Grants for FY- 2021-22 |
|
445 |
13-01-2021-22 |
Construction of Public Health Units(BPHUs) at Tapan RH A) Civil Work B) Sanitary & Plumbing Work |
Kamalkanti Bhattacharya |
Somnath Kuiry |
02/02/2022 |
₹4,752,799.00 |
22/03/2022 |
237/ZP |
26/05/2022 |
Scheme Completed: 01/05/2023 |
15 FC Health Grants for FY- 2021-22 |
|
446 |
11-13-2021-22 |
Repairing of Road from Syndicate More towards Dhanaipur in P.S. Harirampur. |
Jaydip Ray |
Kalyan Bose |
23/12/2021 |
₹4,052,452.00 |
06/05/2022 |
413/ZP |
21/10/2022 |
90
Days Left:-473
|
Repair/Maintenance of Rural Roads other than PMGSY |
|
447 |
11-11-2021-22 |
Maintenance of CC Road from Kadamtala More towards Sadhan Sutradhar House under Belbari-II GP in P.S. Gangarampur |
Jaydip Ray |
Kalyan Bose |
23/12/2021 |
₹969,398.00 |
18/04/2022 |
350/ZP |
02/06/2022 |
Scheme Completed: 24/11/2022 |
Repair/Maintenance of Rural Roads |
|
448 |
11-10-2021-22 |
Maintenance of CC Road from Jhantu Barik House towards Santosh Pramanik under Belbari-I GP in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
23/12/2021 |
₹968,988.00 |
18/04/2022 |
349/ZP |
17/05/2022 |
Scheme Completed: 31/05/2022 |
Repair/Maintenance of Rural Roads |
|
449 |
11-09-2021-22 |
Maintenance of CC Road from Habibur Miah House towards Sanju Tigga House under Chaloon GP in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
23/12/2021 |
₹973,520.00 |
18/04/2022 |
348/ZP |
17/05/2022 |
60
Days Left:-660
|
Repair/Maintenance of Rural Roads |
|
450 |
11-08-2021-22 |
Maintenance of CC Road from Hariranjan House towards Prabhat Roy House under Belbari-I GP in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
23/12/2021 |
₹967,628.00 |
07/04/2022 |
317/ZP |
18/05/2022 |
Scheme Completed: 07/11/2022 |
Repair/Maintenance of Rural Roads |
|