451 |
11-07-2021-22 |
Up gradation and Widening of CC Road from Shib Mandir More towards Palash Saha House under Belbari-I in P.S. Gangarampur. |
Jaydip Ray |
Kalyan Bose |
23/12/2021 |
₹971,255.00 |
07/04/2022 |
316/ZP |
10/05/2022 |
60
Days Left:-667
|
Repair/Maintenance of Rural Roads |
|
452 |
11-06-2021-22 |
Repairing & Maintenance of Road from Chousa More towards Rasulpur in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
23/12/2021 |
₹1,456,731.00 |
06/05/2022 |
412/ZP |
01/06/2022 |
Scheme Completed: 17/08/2022 |
Repair/Maintenance of Rural Roads |
|
453 |
11-05-2021-22 |
Repairing & Maintenance of Road from Kumarganj High School towards Batulpara in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
23/12/2021 |
₹808,000.00 |
07/04/2022 |
314/ZP |
19/05/2022 |
Scheme Completed: 17/08/2022 |
Repair/Maintenance of Rural Roads |
|
454 |
11-04-2021-22 |
Repairing & Maintenance of Road from Pukur Para Pacca Road towards Ahed Ali House in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
23/12/2021 |
₹1,456,731.00 |
07/04/2022 |
313/ZP |
12/04/2022 |
Scheme Completed: 11/06/2022 |
Repair/Maintenance of Rural Roads |
|
455 |
11-02-2021-22 |
Construction of CC Road from Elas Sarkar Shop to Sajjad Mia House in P.S. Tapan |
Kamalkanti Bhattacharya |
Somnath Kuiry |
23/12/2021 |
₹971,154.00 |
07/04/2022 |
312/ZP |
18/04/2022 |
Scheme Completed: 11/06/2022 |
Repair/Maintenance of Rural Roads |
|
456 |
11-01-2021-22 |
Repair and maintenance of Road from Samidul Mandal House towards Bhupen Barman House in P.S. Balurghat |
Kamalkanti Bhattacharya |
PABAN BASAK |
23/12/2021 |
₹485,577.00 |
07/04/2022 |
311/ZP |
18/04/2022 |
Scheme Completed: 30/05/2022 |
Repair/Maintenance of Rural Roads |
|
457 |
09-19-2021-22 |
Construction of Covered Drain from Small Bridge to Muradpur Pukur, Mahabari GP in P.S. Banshihari. |
Jaydip Ray |
Suhita Paul |
20/12/2021 |
₹582,692.00 |
22/03/2022 |
236/ZP |
Not started |
60
|
15th FC Tied |
|
458 |
09-18-2021-22 |
Construction of hat-Shed at Dwaipkhanda Pirmajar(Purbo Para) in P.S. Tapan |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/12/2021 |
₹971,154.00 |
06/05/2022 |
410/ZP |
13/05/2022 |
Scheme Completed: 16/11/2022 |
15th FC untied |
|
459 |
09-17-2021-22 |
Installation of LED Street Light (High Mast Tower) at Dakshin Sukdebpur village in front of Hossein Ali,Son of Moselem Ali House, G.P. 7 no Dakshin Sukdebpur in PS- Tapan, Dist-Dakshin Dinajpur |
Kamalkanti Bhattacharya |
Nihar Ghosh |
20/12/2021 |
₹584,485.00 |
22/03/2022 |
235/ZP |
20/10/2022 |
Scheme Completed: 08/04/2023 |
15th FC untied |
|
460 |
09-16-2021-22 |
Up gradation of Electrical Cubical Panel Board and S/laying 1.1 KV grade PVC/A. XLPE insulated Aluminium Armoured Cable at DDZP Office Campus, Dist- Dakshin Dinajpur |
Jaydip Ray |
Nihar Ghosh |
20/12/2021 |
₹250,848.00 |
22/03/2022 |
234/ZP |
17/03/2023 |
60
Days Left:-356
|
15th FC untied |
|
461 |
09-14-2021-22 |
Installation of LED Street Light(High Mast Tower) at Naroi, Gangarampur GP, in P.S. Gangarampur, Dist- Dakshin Dinajpur |
Jaydip Ray |
Nihar Ghosh |
20/12/2021 |
₹580,485.00 |
22/03/2022 |
233/ZP |
21/05/2022 |
Scheme Completed: 08/02/2023 |
15th FC Un-Tied |
|
462 |
10-10-2021-22 |
Construction of Drain from Nahit High School to Uttar Nahit in P.S. Kushmandi. |
Jaydeep Ray |
Suhita Paul |
16/12/2021 |
₹1,748,077.00 |
28/03/2022 |
268/ZP |
19/05/2022 |
Scheme Completed: 07/09/2022 |
15th FC Tied |
|
463 |
10-09-2021-22 |
Construction of Top Floor of Balupara Market Complex under Hili P.S. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
16/12/2021 |
₹3,204,807.00 |
28/03/2022 |
267/ZP |
Not started |
90
|
15th FC Tied |
|
464 |
10-07-2021-22 |
Repairing of Road from Usaharan to Kushmandi in P.S. Kushmandi |
Jaydip Ray |
Suhita Paul |
16/12/2021 |
₹2,329,762.00 |
23/05/2022 |
483/ZP |
03/06/2022 |
Scheme Completed: 21/09/2022 |
Repair/Maintenance of Rural Road other than BGSY during 2020-21 |
|
465 |
10-06-2021-22 |
Repairing of CC Road from Ratanpur More towards Kobirpur(1st phase) under Nandanpur GP in P.S. Gangarampur |
Jaydip Ray |
Kalyan Bose |
16/12/2021 |
₹4,302,850.00 |
28/03/2022 |
265/ZP |
18/05/2022 |
Scheme Completed: 09/01/2023 |
Repair/Maintenance of Rural Road other than BGSY during 2020-21 |
|
466 |
10-05-2021-22 |
Repair and Maintenance of Road from Shyamnagar Khulan More to Tiroil in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
16/12/2021 |
₹1,066,413.00 |
28/03/2022 |
264/ZP |
22/04/2022 |
Scheme Completed: 17/08/2022 |
Repair/Maintenance of Rural Roads other than PMGSY |
|
467 |
10-04-2021-22 |
Repairing and Maintenance of Road from Karaitala to Pataikuri(balance part) in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
16/12/2021 |
₹5,826,923.00 |
06/05/2022 |
411/ZP |
16/05/2022 |
Scheme Completed: 28/10/2022 |
Repair/Maintenance of Rural Roads other than PMGSY |
|
468 |
10-03-2021-22 |
Repairing of Metal Road from Nayabazar 1 No. more to Nayabazar Hatkhola, GP-Ajmatpur in P.S. Tapan. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
16/12/2021 |
₹1,223,727.00 |
20/04/2022 |
379/ZP |
25/04/2022 |
Scheme Completed: 31/05/2022 |
Repair/Maintenance of Rural Roads other than PMGSY |
|
469 |
10-01-2021-22 |
Repair and Maintenance of Road from Tilna Shibirmore to Goyalpara Main Road(Phase-II) in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
16/12/2021 |
₹2,789,966.00 |
20/04/2022 |
378/ZP |
24/04/2022 |
Scheme Completed: 17/08/2022 |
Repair/Maintenance of Rural Roads other than PMGSY |
|
470 |
01-01-2021-22 |
Construction of CC Road from Bolla Pucca Road to Kalimandir via H/O Nikhil Karmakar in P.S. Balurghat. |
Kamal Kanti Bhattacharjee |
PABAN BASAK |
17/09/2021 |
₹1,524,712.00 |
24/12/2021 |
591/ZP |
05/01/2022 |
Scheme Completed: 23/06/2022 |
15th FC |
|
471 |
01-02-2021-22 |
Construction of CC Road from Purba Chisgishpur Digra Khari Bridge to Seala Primary School in P.S. Balurghat. |
Kamalkanti Bhattacharya |
PABAN BASAK |
17/09/2021 |
₹3,146,538.00 |
24/12/2021 |
592/ZP |
09/01/2022 |
Scheme Completed: 20/06/2022 |
15th FC Un-Tied |
|
472 |
01-04-2021-22 |
Construction of CC Road from Bherbheria More to Murgapara in P.S. Kumarganj. |
Kamalkanti Bhattacharya |
PABAN BASAK |
17/09/2021 |
₹3,340,769.00 |
03/12/2021 |
497/ZP |
21/12/2021 |
Scheme Completed: 23/06/2022 |
15th FC Un-Tied |
|
473 |
01-05-2021-22 |
Construction of CC Road from Chalunda Madrasha to Dakshinpara under Uday GP in P.S. Gangarampur. |
Jaydeep Ray |
Kalyan Bose |
17/09/2021 |
₹1,942,308.00 |
03/12/2021 |
498/ZP |
Not started |
45
|
15th FC Un-Tied |
|
474 |
01-06-202122 |
Construction of CC Road from Mundehar Madhu Rabidas House to Mansur Miah House via Baro Masjid(1st phase) under Mahabari GP in P.S. Banshihari. |
Jaydeep Ray |
Liton Sarkar |
17/09/2021 |
₹1,553,846.00 |
03/12/2021 |
499/ZP |
Not started |
45
|
15th FC Un-Tied |
|
475 |
01-07-2021-22 |
Construction of CC Road from Kistobati FP School to Srijuddin Ahmed House(1st phase) under Brojoballavpur GP in P.S. Banshihari. |
Jaydeep Ray |
Liton Sarkar |
17/01/2021 |
₹1,359,615.00 |
03/12/2021 |
500/ZP |
Not started |
45
|
15th FC Un-Tied |
|
476 |
01-08-2021-22 |
Construction of CC Road from Ruya Nagar to Laxmitala Deul GP in P.S. Kushmandi. |
Jaydeep Ray |
Suhita Paul |
17/09/2021 |
₹1,536,301.00 |
03/12/2021 |
501/ZP |
Not started |
45
|
15th FC Un-Tied |
|
477 |
01-09-2021-22 |
Construction of CC Road from Night Jatin Debnath House to Biman Soren House, Shirshi GP in P.S. Harirampur. |
Jaydeep Ray |
Kalyan Bose |
17/09/2021 |
₹1,342,069.00 |
03/12/2021 |
502/ZP |
Not started |
45
|
15th FC Un-Tied |
|
478 |
01-10-2021-22 |
Construction of CC Pavement at Entry Gate and Exit of BTT, Balupara and Toilet Renovation Panjul GP in P.S. Hili. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
17/09/2021 |
₹2,427,885.00 |
03/12/2021 |
503/ZP |
Not started |
45
|
15th FC Un-Tied |
|
479 |
01-12-2021-22 |
Construction of Covered Drain from Kamalpur More to Masjid in P.S. Tapan. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
17/12/2021 |
₹1,631,538.00 |
03/12/2021 |
504/ZP |
09/03/2022 |
Scheme Completed: 04/07/2022 |
15th FC Un-Tied |
|
480 |
01-13-2021-22 |
Construction of Covered Drain from Rabiul Hossen House to West Saidpur Pransagar in P.S. Gangarampur. |
Jaydeep Ray |
Kalyan Bose |
17/12/2021 |
₹1,359,223.00 |
03/12/2021 |
505/ZP |
24/03/2022 |
Scheme Completed: 12/06/2023 |
15th FC Un-Tied |
|
481 |
01-14-2021-22 |
Construction of Covered Drain from Tapan Kardaha Road to Radhagobinda Mandir in P.S. Tapan. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
17/12/2021 |
₹1,165,385.00 |
03/12/2021 |
506/ZP |
08/02/2022 |
Scheme Completed: 30/06/2022 |
15th FC Un-Tied |
|
482 |
01-16-2021-22 |
Construction of Covered Drain from Kaldighi Battala end(Raghunathbati Idgaha) towards Sanjay Das House(both side) in P.S. Gangarampur. |
Jaydeep Ray |
Kalyan Bose |
17/12/2021 |
₹3,446,601.00 |
03/12/2021 |
507/ZP |
Not started |
60
|
15th FC Un-Tied |
|
483 |
01-17-2021-22 |
Construction of covered drain from Kharun more to Hatkhola in P.S.Hili. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
17/12/2021 |
₹1,155,673.00 |
03/12/2021 |
508/ZP |
10/01/2022 |
Scheme Completed: 18/06/2022 |
15th FC Un-Tied |
|
484 |
02-01-2021-22 |
Construction of Road from Bajeharipur Dubamore to Nachuyapara via Santipur FP School in P.S. Banshihari. |
Kamalkanti Bhattacharya |
PABAN BASAK |
20/09/2021 |
₹33,436,839.00 |
22/12/2021 |
577/ZP |
18/01/2022 |
365
Days Left:-474
|
RIDF-XXVI |
|
485 |
02-02-2021-22 |
Construction of Road from Chokahar to Illaspur via Dumoni FP School in P.S. Banshihari. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/09/2021 |
₹16,892,549.00 |
22/12/2021 |
578/ZP |
30/12/2021 |
Scheme Completed: 21/03/2023 |
RIDF-XXVI |
|
486 |
02-03-2021-22 |
Construction of Road from Chingishpur Jora Bridge to House of Naran Hemram in P.S. Balurghat. |
Jaydeep Ray |
Liton Sarkar |
20/09/2021 |
₹17,184,011.00 |
22/12/2021 |
576/ZP |
Not started |
365
|
RIDF-XXVI |
|
487 |
02-04-2021-22 |
Construction of Road from Bishohari to Adhyakha More via Madhu Karmakar House in P.S. Harirampur |
Jaydeep Ray |
Kalyan Bose |
20/09/2021 |
₹19,837,771.00 |
22/12/2021 |
579/ZP |
29/12/2021 |
Scheme Completed: 12/06/2023 |
RIDF-XXVI |
|
488 |
03-04-2021-22 |
Up gradation of Electrical Cubical Panel Board and S/laying 1.1 KV grade PVC/A. XLPE insulated Aluminium Armoured Cable at DDZP Office Campus, Dist- Dakshin Dinajpur |
Jaydeep Ray |
Nihar Ghosh |
28/09/2021 |
₹971,154.00 |
03/12/2021 |
510/ZP |
17/03/2023 |
90
Days Left:-326
|
15th FC Un-Tied |
|
489 |
03-05-2021-22 |
Construction of Electrical Panel Room within ZP Office Premises under Balurghat PS |
Jaydeep Ray |
Nihar Ghosh |
28/09/2021 |
₹592,403.00 |
03/12/2021 |
510/ZP |
Not started |
60
|
15th FC Un-Tied |
|
490 |
03-06-2021-22 |
Repairing and Maintenance of Civil Works of ZP Office Building. |
Jaydeep Ray |
PABAN BASAK |
28/09/2021 |
₹582,692.00 |
03/12/2021 |
511/ZP |
27/04/2022 |
Scheme Completed: 23/03/2023 |
15th FC Tied |
|
491 |
03-07-2021-22 |
Construction of Covered Drain from Daulatpur Vim Roy House to Madan Laha’s House in P.S. Banshihari. |
Jaydeep Ray |
Liton Sarkar |
28/09/2021 |
₹606,971.00 |
03/12/2021 |
512/ZP |
Not started |
60
|
15th FC Tied |
|
492 |
03-09-2021-22 |
Construction of Covered Drain from Mollapara Ajijur Rahaman’s House to Transformer in P.S. Banshihari. |
Jaydeep Ray |
Liton Sarkar |
28/09/2021 |
₹582,692.00 |
03/12/2021 |
513/ZP |
03/04/2022 |
Scheme Completed: 01/08/2022 |
15th FC Tied |
|
493 |
05-01-2021-22 |
Repair and Renovation Work at 2nd Floor of DRDC Building(District Traffic Office) under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur |
Jaydeep Ray |
PABAN BASAK |
29/10/2021 |
₹737,515.00 |
25/11/2021 |
478/ZP |
30/11/2021 |
Scheme Completed: 11/07/2022 |
Own Fund |
|
494 |
05-02-2021-22 |
Internal Electrification Work at 2nd Floor of DRDC Building(District Traffic Office) under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur |
Jaydeep Ray |
Nihar Ghosh |
29/10/2021 |
₹205,596.00 |
31/01/2022 |
52/ZP |
21/03/2022 |
Scheme Completed: 31/05/2022 |
Own Fund |
|
495 |
08-01-2021-22 |
Service Road from Sutal more towartds FP School by Providing Stone dust (o.oo km to 1.10 km) in P.S. Tapan. |
Jaydeep Ray |
PABAN BASAK |
16/11/2021 |
₹5,925,884.00 |
15/12/2021 |
548/ZP |
16/12/2021 |
Scheme Completed: 28/10/2022 |
15th FC 20-21 |
|
496 |
09-01-2021-22 |
Maintenance of CC Road from Baganbari towards Mohidur Mondal House under Jahangirpur GP in P.S. Gangarampur |
Jaydeep Ray |
Kalyan Bose |
20/12/2021 |
₹485,577.00 |
22/03/2022 |
226/ZP |
17/05/2022 |
Scheme Completed: 31/05/2022 |
Repair/Maintenance of Rural Roads |
|
497 |
09-02-2021-22 |
Maintenance of existing HP Culvert & CC Road from Tuliapara More towards Bijoy Roy House under Jahangirpur GP in P.S. Gangarampur |
Jaydeep Ray |
Kalyan Bose |
20/12/2021 |
₹485,577.00 |
22/03/2022 |
227/ZP |
17/05/2022 |
45
Days Left:-675
|
Repair/Maintenance of Rural Roads |
|
498 |
09-03-2021-22 |
Maintenance of CC Road from Badal Sarkar land end twowards Amtala under Jaghangirpur GP in P.S. Gangarampur |
Jaydeep Ray |
Kalyan Bose |
20/12/2021 |
₹485,577.00 |
02/03/2022 |
228/ZP |
23/04/2022 |
45
Days Left:-699
|
Repair/Maintenance of Rural Roads |
|
499 |
09-05-2021-22 |
Construction of CC Road from MSK School towards Gobinda Sen House in P.S. Tapan |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/12/2021 |
₹485,577.00 |
03/01/2022 |
|
Not started |
45
|
Repair/Maintenance of Rural Roads |
|
500 |
09-06-2021-22 |
Construction of CC Road from Masjid Para new road Chandipur towards Borakuri main road in P.S. Tapan |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/12/2021 |
₹485,577.00 |
22/03/2022 |
229/ZP |
29/03/2022 |
Scheme Completed: 12/06/2022 |
Repair/Maintenance of Rural Roads |
|
501 |
09-07-2021-22 |
Construction of CC Road from Adibasipara towards Chakvagirat main road in P.S. Tapan |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/12/2021 |
₹485,577.00 |
22/03/2022 |
230/ZP |
24/03/2022 |
Scheme Completed: 12/06/2022 |
Repair/Maintenance of Rural Roads |
|
502 |
09-08-2021-22 |
Construction of CC Road from Noapara ICDS Center towards Noapara More in P.S. Tapan |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/12/2021 |
₹485,577.00 |
22/03/2022 |
231/ZP |
24/03/2022 |
Scheme Completed: 12/06/2022 |
Repair/Maintenance of Rural Roads |
|
503 |
09-10-2021-22 |
Construction of CC Road from Telikuri PMGSY Road via Milghar(1st Phase) under Ellahabad GP in P.S. Banshihari |
Jaydeep Ray |
Suhita Paul |
20/12/2021 |
₹485,577.00 |
06/05/2022 |
408/ZP |
08/01/2022 |
Scheme Completed: 25/02/2023 |
Repair/Maintenance of Rural Roads |
|
504 |
09-11-2021-22 |
Construction of CC Road from main Road towards Chandmukh Gram(1st Phase) under Brajaballavpur GP in P.S. Banshihari. |
Jaydeep Ray |
Suhita Paul |
20/12/2021 |
₹485,577.00 |
06/05/2022 |
409/ZP |
Not started |
45
|
Repair/Maintenance of Rural Roads |
|
505 |
09-13-2021-22 |
Repairing of Damaged Portion of road from Kharun to Panjul at Panjul hatkhola in P.S. Hili. |
Kamalkanti Bhattacharya |
Somnath Kuiry |
20/12/2021 |
₹536,647.00 |
22/03/2022 |
232/ZP |
19/04/2022 |
Scheme Completed: 04/08/2022 |
Repair/Maintenance of Rural Roads |
|
506 |
|
Up gradation and Widening of CC Road from Shib Mandir More towards Palash Saha House under Belbari-I in P.S. Gangarampur. |
|
|
23/12/2021 |
₹19,435.00 |
11/01/2022 |
|
Not started |
|
|
|
507 |
|
Repairing & Maintenance of Road from Chousa More towards Rasulpur in P.S. Kumarganj. |
|
|
23/12/2021 |
₹29,135.00 |
01/01/2022 |
|
Not started |
|
|
|
508 |
|
Repairing & Maintenance of Road from Kumarganj High School towards Batulpara in P.S. Kumarganj. |
|
|
23/12/2021 |
₹16,160.00 |
11/01/2022 |
|
Not started |
|
|
|
509 |
|
Repairing & Maintenance of Road from Pukur Para Pacca Road towards Ahed Ali House in P.S. Kumarganj. |
|
|
23/12/2021 |
₹29,135.00 |
11/01/2022 |
|
Not started |
|
|
|
510 |
|
Repairing & Maintenance of Road from Nagkati Fishari Office to Bhutkuri in P.S. Kumarganj. |
|
|
23/12/2021 |
₹13,596.00 |
11/01/2022 |
|
Not started |
|
|
|
511 |
|
Construction of CC Road from Elas Sarkar Shop to Sajjad Mia House in P.S. Tapan |
|
|
23/12/2021 |
₹19,423.00 |
11/01/2022 |
|
Not started |
|
|
|
512 |
|
Repair and maintenance of Road from Samidul Mandal House towards Bhupen Barman House in P.S. Balurghat |
|
|
23/12/2021 |
₹9,712.00 |
11/01/2022 |
|
Not started |
|
|
|
513 |
12-01-2021-22 |
Construction of proposed Anti-Natal, Post-Natal ward & delivery unit at Kushmandi Rural Hospital, Dakshin Dinajpur |
Jaydeep Ray |
Suhita Paul |
01/04/2021 |
₹4,125,042.00 |
20/01/2022 |
255/ZP |
30/05/2022 |
Scheme Completed: 01/02/2023 |
PMJVK/SUP |
|